Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.J. Tuozzolo will schedule a visit to NSLS next week to evaluate available magnets, power supplies,

Slides:



Advertisements
Similar presentations
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Advertisements

Can we re-use existing magnets to build a 350(450) keV beam line? No.Type 115 deg dipole 1Spectrometer dipole 1NEG solenoid (2.5” ID) 5SW/CW solenoid 1Wien.
Summary of the discussion for the commissioning session 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 6/ 1/ 2006 T.Okugi (KEK)
February 17-18, 2010 R&D ERL Ady Hershcovitch R&D ERL Beam Dump Ady Hershcovitch February 17-18, 2010 Beam Dump.
PXIE: SSR1 Section Focusing Lens 1.Requirements table 2.Developed at FNAL 3.Available from vendors 4.Used at ANL 5.Layout of the SSR1 cryomodule 6.Case.
Low Energy RHIC e - Cooling LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity 704 MHz SRF gun converted to booster cavity 5-cell 704 MHz.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
Minutes from Sector 1 Relocation Meeting, May 22 nd 9:15 LCR D. Gassner K Mernick suggest moving the BBQ kicker and triple purpose pick-up assemblies to.
MeRHIC Design V.Ptitsyn on behalf of MeRHIC Design team: M. Bai, J. Beebe-Wang, I. Ben-Zvi, M. Blaskiewicz, A. Burrill, R. Calaga, X. Chang, A. Fedotov,
Crab Cavities in IR1 and IR5 Some considerations on tunnel integration What will be the situation in the tunnel after the LHC IR Phase-1 Upgrade. What.
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
Low Energy RHIC e - Cooling Meeting Notes 1 –LF Solenoids & HF (Matching) Solenoids: Out for bid??? –20 o Dipole  Magnet gap is 4 inches/transport lines.
Discussion on the magnetic shielding: The magnetic shielding will not be installed until the 2016 shutdown. The magnetic shielding test fixture will be.
Sector 1 Instrument Relocation for LEReC Systems in the LEReC Region (39m - 64m) to be Relocated 7 separate assembliesNew LocationChampionsApproved ARTUS.
1 Low-energy RHIC electron Cooler (LEReC) cost estimate December 2, 2014.
1 LEReC Funded! From: Fedotov, Alexei Sent: Thursday, May 14, :04 PM Subject: LEReC project approved Dear All, FYI. The LEReC project is now formally.
09/13/20111 Status of high intensity polarized electron gun project at MIT-Bates Evgeni Tsentalovich MIT.
Low Energy RHIC e - Cooling Meeting Minutes – 1/14/15 1 –Magnet Design  During DOE Review there was concern for magnet field quality of LF Solenoids.
Low Energy RHIC e - Cooling LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity 704 MHz SRF gun converted to booster cavity 5-cell 704 MHz.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
July LEReC Review July 2014 Low Energy RHIC electron Cooling (LEReC) Alexei Fedotov LEReC overview: project goal and cooling approach.
G5 Beam Instrumentation D. Gassner, E. Pozdeyev 4-09.
Beam Line Layout – Cooling Section There seems to be two options for energy measurement: at the 180 dipole and/or in a diagnostic branch at the end of.
1 Plan and Opportunities for Migration and Integration of the Photoinjector into New Muon Lab Mike Church AAC Review - 12/5/06.
Low Energy RHIC e - Cooling Meeting Minutes – 11/19/14 1. Cooling Section Magnets and Power Supplies –Most of power supplies will be from ERL (R. Lambiase).
1. Beam Line Layout – Cooling Section (CS) Mu Metal shield design – G. Mahler is assembling a mock-up of beam line for field measurements to evaluate.
ECOOL Meeting 03/26/10 1 Low-E cooler baseline decisions: 1.FNAL’s cooling section “as is” – with weak solenoids, correctors, etc. (to prevent over focusing.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review Vacuum Systems H.-C. Hseuh January 4, 2007 Vacuum Systems.
G5 Design Review, April 24, 2009 Gun to 5cell Cavity Test: Overview Dmitry Kayran G5 test Design Review April,
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.Funding is available to purchase magnets. 2.Comment during presentation of attached slides: 180.
Low Energy RHIC e - Cooling LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity 704 MHz SRF gun converted to booster cavity 5-cell 704 MHz.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Low Energy RHIC e - Cooling LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity 704 MHz SRF gun converted to booster cavity 5-cell 704 MHz.
A Fedotov, K Hamdi, D Kayran, L Snydstrup, K Smith, J Tuozzolo, A Zaltsman Transport Beam Line Design development of beam line will be from the Booster.
Low Energy RHIC e - Cooling Meeting Minutes – 12/23/ Cooling Section: –LF Solenoids:  At PPM, G. Woods has assigned buyer, SOW will be revised,
Michał Matusiak Sławomir Wronka
July LEReC Review July 2014 Low Energy RHIC electron Cooling Jorg Kewisch, Dmitri Kayran Electron Beam Transport and System specifications.
LEReC. COOLING in Blue RHIC ring COOLING in Yellow RHIC ring 63.9 m to IP2 Beam Dump 20° Bending Magnets DC e - Gun 704 SRF Booster Cavity 2.1 GHz Cu.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review H.-C. Hseuh Vacuum Systems January 4, 2007 Project Overview.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Bob Lambiase May 21, The purpose of eRHIC is to have the capability to collide heavy ions with leptons, such as electrons and polarized electrons.
Booster bpm’s Jim Crisp 3/29/06. Plate width and linearity with the response linearized along the axis 60 and 20 degree plates become nonlinear in the.
Low-Energy RHIC electron Cooling (LEReC) MPS meeting MPS Meeting April 21, 2016.
Beam Line Layout – Cooling Section (to be installed by 1 Dec ember 2015) J. Kewisch wants to move the 20 dipole, yellow (to the right) toward the triplet.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
Meeting Minutes: LEReC DC Gun, Transport Lines, and Dump Installation 2016, May 26, 2016 D. Kayran, A. Fedotov, T. Miller, D. Gassner, D. Weiss, G. Mahler,
5/25/16 Gun to Booster Transport Line Meeting Minutes: A. Fedotov, D. Kayran, S. Bellavia, M. Mapes, T. Rao, B. Sheehy, J. Tuozzolo, Z. Zhao, B. Sheehy,
LEReC. COOLING in Blue RHIC ring COOLING in Yellow RHIC ring 63.9 m to IP2 Beam Dump 20° Bending Magnets DC e - Gun 704 SRF Booster Cavity 2.1 GHz Cu.
LEReC Electron beam requirement for cooling Kinetic energy, MeV 1.6
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
Low Energy RHIC e - Cooling Meeting Minutes – 12/17/ For the matching energy of electron and ion beams methods for electron energy measurement were.
ECOOL Meeting 03/26/10 1 Electron beam transport for FNAL electron cooler E-cooling is referred as “non-magnetized” OVERVIEW Material is taken from FNAL’s.
Minutes meeting Mapes, Miller, Kayran, Fedotov, Gassner, Hamdi, Bruno, Mahler, Weiss, Hammons, Arno, Nayak, Fite, Bellavia The layout shown in.
LEReC System 1. LEReC Injection section 2016 CeC Beam Dump 45°dipole (CeC) Profile Monitor (ERL HE) No SRF Cavity DC e - Gun ERL Solenoid ERL Halo Monitors.
Page Headline CBETA Splitter.
Warm magnets for LHeC / Test Facility arcs
Arc magnet designs Attilio Milanese 13 Oct. 2016
EBTF Design Review Technical Meeting Group
Large Booster and Collider Ring
Main magnets for PERLE Test Facility
Collider Ring Optics & Related Issues
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Electron Collider Ring Magnets Preliminary Summary
MEIC Shifting Magnet Tim Michalski August 6, 2015.
IR Beam Transport Status
Andrew Hutton Concept suggested independently by Haipeng Wang
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
Presentation transcript:

Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.J. Tuozzolo will schedule a visit to NSLS next week to evaluate available magnets, power supplies, etc. 2.Comment during presentation of attached slides: Beam line design near Triplet magnet. G. Whitbeck needs details in this area to develop the design. –M. Mapes said the a shorter bellows may be used since there as other short bellows in the cooling section. Also, the conical adapter could be a part of the dipole chamber. –There will still be an ion pump cross at this location. –The existing BPM at the DX magnet will be used. D. Gassner to provide detail drawing to G. Whitbeck. Compensation Solenoids (Low Field) –A. Fedotov said that field ( ∫B 2 dz) of current design is not adequate for focusing. The magnet may need increased current density or physical size (large OD) to achieve slightly higher field. W. Meng and G. Mahler to resolve when field is determined (A. Fedotov to provide). 1

Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 Matching (High Field) Solenoids kG –There will be no bucking coils in the these solenoids –HF Solenoids need correctors (100 g-cm) BPM –A single BPM is needed for pair of matching solenoids Profile Monitor –G. Whitlock to get PM drawing from Sal P. The LEReC PM will be similar with larger YAG screen – 40 mm (T. Miller). Beam Dump –Beam dump to be 60 kW. In order to include this beam dump the beam line must be modified considerably from that currently shown. The future use of the ERL beam dump is unlikely. Note: Per - G. Mahler on 11/13/14: “If we are considering cutting the transport line back and dumping locally, we should flip the layout.” See attached sheet. 2

Low Energy RHIC e - Cooling 3 Push pull ERL approach: possible new baseline

Low Energy RHIC e - Cooling Revised Cooling Section 4 Q3 Details: valve, bellows, 10 Hz corrector, RHIC BPM, ion pump, transition chamber, survey points. NSLS I compensating dipoles and PS: specifications?

Low Energy RHIC e - Cooling Compensating Solenoids 1.Compensating Solenoid: Presently based on W. Meng’s design for 0.20kG with bucking coils. 2.Compensating Solenoid : The separate leads for the bucking solenoid coils and the main solenoid coil on the magnet assembly terminal block. 3.Compensating Solenoid Power Supplies: It has not been determined whether each solenoid will require 1, 2, or 3 power supplies. 4.Spacing: Compensating solenoids will be spaced 3 meters apart. What is the Int(Bz)**dz for the 5 MeV case which you used? My estimate that we would need maximum: 3e5 Gauss^2cm Wuzheng has 3.4e5 for the full integral which seems sufficient. Complete SCD’s, SOW, Specification. Layout BPM, Bellows, Chamber Flange. 5

Low Energy RHIC e - Cooling Cooling Section BPM’s Phone conference with MPF Larger diameter buttons on pick-up – 27 to 30 mm diameter Machined vacuum chamber, 304L, no threaded holes on flanges. Button hole size TBD microwave studio (D. Gassner). 6

Low Energy RHIC e - Cooling Dipole correction A-T Per coil; Straight section Half-length: H1=6 cm 13 turns/.8 amps = 1 amp PS (AWG #18 = 0.98 A/mm2) Compensating Solenoid Corrector

Low Energy RHIC e - Cooling Magnet Analysis Matching Solenoid w/corrector 1.5 kG, magnetic length?? Water cooled 2 required in cooling section w/bucking coil (Need to look at alternatives to bucking coil: adjacent low field solenoid?) 2 required in cooling section w/o bucking coil Corrector 100 Gcm, present specification. 8

Low Energy RHIC e - Cooling Cooling sections U-turn 180 deg dipole 704 MHz warm cavity (Phase-I) 2.1 GHz warm cavity 704 MHz SRF cavity Gun Transport Solenoids Or quads 45 deg. dipoles Compensating dipoles 11/05/14 Compensation weak solenoids placed every 3 m Push pull ERL approach: possible new baseline 9 MHz warm cavity 704 MHz warm cavity (Phase-II) Booster Matching strong solenoids

Low Energy RHIC e - Cooling Vacuum Chamber/System Requirements: 5” (12.7 cm) OD vacuum chamber, bake-out temperature ID button BPM (from CeC) No ion pump tees in the cooling section. One RHIC shielded bellows per solenoid Transitions to 10 cm aperture dipole magnets. Dipole magnet vacuum chambers. 6 Profile Monitors, screen size?? 10 Magnetic Shields