TD Help for Shutdown 2012 Preliminary, will be updated April 18, 2012.

Slides:



Advertisements
Similar presentations
Main Injector Gap clearing kickers Phil Adamson (#) AEM 14th March 2011.
Advertisements

PIP and the Booster Notch Bob Zwaska October 12, 2011 PIP Meeting.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
KICKOFF AS PRESENTED 6/17/11, SEE THIS WEEKS SCHEDULE FOP THE LATEST UPDATE Shutdown Shutdown ‘11.
Accelerator Support and Maintenance Run 14. Maintenance Tomorrow Major efforts RHIC: Major efforts RHIC: Access hrs. Access hrs. RA.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
Proton Source Task Shutdown 2014 RFQ Injection Linac Tank 1 to 2 emmittance probe and Collimator NTF Beam Line Repair 400 MeV Turbo Station Replacement.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)
ANU Shutdown Status AEM meeting Cons Gattuso 6/3/2012.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
PIP Update April 30 th Agenda Summary Update – Current Activities/Updates – Nathan Eddy – Booster Longitudinal Damper.
Machine Advisory Committee Review APS Upgrade Installation Plan and Schedule John Noonan November 15, 2006.
NuMI NBI2006 September 9, 2006 NuMI Repairs for Hot Components Jim Hylen / FNAL Page 1 NuMI Repairs for Hot Components (1 sievert = 100 rem) Problem On.
PIP Update Feb 20 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
Shutdown 2012 ES&H Friday April 27, 2012J. Anderson Jr. Page 1 Draft Schedule Beam off to Experiments 0000 Monday April 30 th Linac continues operations.
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
PIP Update Jan Agenda Summary Update – Current Activities – Updates (Ken, Pat and John) – Additional Meetings/Notes.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
Ff NO A Accelerator Upgrades: Status Phil Adamson Fermilab
Shutdown Summer 10 4-week. Who Main Injector Duration Mike Frett/John Featherstone Remove Sand From MI40 penetrations Install when finished (PLUS) 4w.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
ATF2 Accelerator Status and Plans for JFY 2014 runs N. Terunuma, KEK.
Refurbished Booster RF John Reid October 24, 2012.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (Joe Compton - shutdown) – Additional Meetings/Notes.
PIP Budget Codes Budget FY12 Updates October 19, 2011 PIP Meeting.
2 nd harmonic RF perpendicular biased cavity update C.Y. Tan, W. Pellico, G. Romanov, R. Madrak, and D. Wildman 02 Apr 2014.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
PIP Update June 17 th Agenda Summary Update – Current Activities – Updates (Alexander Valishev - Simplified Modeling of Space Charge Losses in Booster.
Friday July 27, 2007 Page 1 Shutdown 2007 ES&H Enclosure Access  Linac Remains Operational until August 13 th  Booster RWP’s and enclosure access keys.
Friday April 7, 2006 J. Anderson Jr. Page 1 ES&H Safety System Upgrades  Data Acquisition System 95% Complete 16 of 17 Linux Ethernet Port Replicator.
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
PIP Update June 18 th Agenda Summary Update – Current Activities/Updates – Reid, Slabaugh.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
2/17/2016 Recycler -Gattuso Recycler Shut Down Status  Flying Wire Status  Wire Vacuum Certified  Tunnel Bake Prep status Disconnection of BPM, Correctors,
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
TD Help for Shutdown 2015 Preliminary, will be updated July 6, 2015 – October 5, 2015.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
PAC Meeting, December 12, Prebys 1 The Problem.
PIP Update March 6 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Intensity Dependent Quad Ramps We know that in order to get the most intensity, the quad ramps must be tuned for a particular intensity. The way this is.
PIP Update May 28 th Agenda Summary Update – Current Activities/Updates – Ken Domann.
All Experimenters’ Meeting November 25, 2013 Photo by Martin Murphy.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Friday July 16, 2010 John Anderson Page 1 Shutdown 2010 ES&H Enclosure Access  Linac Remains on enclosure interlock key series. RWP’s in.
Muon Department Meeting Jerry Annala Staged Commissioning of Muon Campus 17 December 2015.
Booster Status, September 4, 2003 – E. Prebys 1 Frantic Shutdown Preparations Continue…
09:00 Meeting Shutdown Update June 29 th 2015 Cons Gattuso AD Shutdown Manager.
Muon Long Term Schedule August 15, µ Points to discuss What is the schedule What is the schedule Shutdown schedules Shutdown schedules How do we.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
Friday 5/1/ meeting. I wish to lock in the power outage onTuesday 5/5/09 at the end of the 0930 lab scheduling meeting speak now or :
Work in the Tevatron A0 D0 B0 C0 E0 F0 Separators A49 Separator B48 TEL 2 installation A0 Xtal Collimator 1.5 m collimator A48 Shimming 6 magnets/day At.
MI/RR Shutdown 2012 Dec Gev Lines/Injection region: Staging equipment, cleaning and prepping new part to start vacuum work. Preparing to modify the.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
Why are we removing our very good gun?
Presentation transcript:

TD Help for Shutdown 2012 Preliminary, will be updated April 18, 2012

Who ~23 People from TD divided up to an equivalent of 12 people (FTE) spread out over the year This means we will be spread out through the year long shutdown ~ ½ people assigned as of 4/18/12 More people (probably most) should be assigned by Friday

Who & What Crew 210.6*Weeks of work Remove 6 cooling tanks 1005 Remove 129 add spool bake8 Strip 32 line Remove lambertson4 Set up and bake 3208 MIRR40 Gap clearing move20 Bake 210 to 2198 Leader: Brad TennisFTE D. Kelley100% D. Assell100% W. Robatzek (?)50% L. Kaminskas100% * This is length of work on this list so far. It is NOT the length people will be involved in the shutdown. The percentage listed under FTE is for the shutdown (11 to 12 months)

What (lots of what) Crew 486.8*Weeks of work MI RF work160 Remove 2.5 MHZ cavities15 Remove 5MHZ Rf Cavities1 Remove Barrier Bucket Cavity1 Make hole for Cavity 4A us end5 Make hole for Cavity 15A us end5 Install 4 A2 Install 15A2 Build and install 40 foot filler3 Rebuild 6 cavities Vacuum large elliptical tube25 40 C magnet replacement25 Add spool to kicker area3 MI 103 Ipm Work2 Misc vac leak5 Mi8 Multiwire 45 Electron cloud 1032 Electron Gun at MI622 Replace Microwave absorber at 6021 Install Carbon coated tube2 Main Injector Corrosion repair4 ??4 * Note: 86.8 is a TOTAL length of the work. It will be broken up and done in parallel. It is not an implied extension of the shutdown

Who & What Leader: John FeatherstoneFTE I. Samayavong04363N80% James Karambis (C)02560C50% George Steuer (C)09702C50% Crew 4 (continued)86.8*Weeks of work * Note: 86.8 is a TOTAL length of the work. It will be broken up and done in parallel. It is not an implied extension of the shutdown

Who & What Crew 632*Weeks of work Delivery, staging, fabrication at MI60160 Leader: Henry GuslerFTE W. Ostrom100% * This is length of work on this list so far. It is NOT the length people will be involved in the shutdown. The percentage listed under FTE is for the shutdown (11 to 12 months)

Who & What Crew 716*Weeks of work Injection Line MI 8 and MI 1060 Assist with RR 3020 Leader: Michael Rauchmiller (Rocky)FTE Mark Chlebek (1 st qtr.)25% Jeff Wittenkeller (1 st & 3 rd qtr.)50% Marco Battistoni (2 nd qtr.)25% Glenn Smith (2 nd & 4 th qtr.)50% * This is length of work on this list so far. It is NOT the length people will be involved in the shutdown. The percentage listed under FTE is for the shutdown (11 to 12 months)

Who (Friday?) FTE Chris Baker (2 nd qtr.)25% Nathan Bremer (4 th qtr.)25% Brent Stone (1 st & 3 rd qtr.)50% D. Plant40% S. Sorenson10% Rick Espinoza (1 st & 3 rd qtr.)50% D. Howard40% S. Sanchez10% J. Greskoviak50% B. Niels100% S. Hobson20%

Who Dave Augustine (ALL) Ext: 4451 Pager (630) Scott McCormick Ext: 3691 Pager (630) Oliver Kiemschies (TD) Ext: 3925 Cell (630) Consolato Gattuso Ext: 6331 Pager (708)

Who Crew 4 John Featherstone Ext: 5605 Pager (630) Crew 6 Henry Gusler Ext: 2675 Pager (630) Crew 2 Brad Tennis Ext: 2807 Pager (630) Crew 7 Michael Rauchmiller (Rocky) Ext: 3011 Pager (360)

Where MI/RR for most work but all accelerators in access (eventually) There WILL be permanent shutdown keys (i.e. keys that you don’t have to turn in at the end of the day) for most Leaders will organize (more information later). Otherwise (however) keys will come from the MCR

Location of the MCR

Layout of MCR <- Keys MI & Booster LOTO -> <- NuMI LOTO Usually RWP’s are next where keys are. At the beginning of this shutdown, the RWP’s will be in the room next to the MCR, along with RSO’s

LOTO (will be job lock boxes)

When Beam off Sunday April 29 th at Midnight Radiation surveys begin Monday morning Most enclosures will be available for access Tuesday May 1 st. But what about us? Depends on where you are going. Depends on how long you were allocated for (i.e. the job might start day 1 but you might not start until month 3 Con’s schedule can be seen here:

Why NOvA jobs will have NOvA task numbers (425) Will try to minimize the tasks numbers Still working on approval process. It doesn’t sound like you’ll have to “hand” a sheet to anyone. Will probably just be an extra approval needed (local leader & real boss)

Good Luck! Stay Safe! This presentation can be found at: