DEALING OF FIRE AND RE-OPENING AT RK-NT Inc,SRP Area.

Slides:



Advertisements
Similar presentations
Fire Behaviour Ventilation. Aim To provide students with information to give them an understanding of the behaviour of fire.
Advertisements

Problems With Determining Oxygen Deficiencies in Ratios Used for Assessing Spontaneous Combustion Activity Darren Brady Manager OHECC Simtars Department.
The Role Of Gas Monitoring In The Prevention And Treatment Of Mine Fires Darren Brady Manager, OHECC Simtars Department of Mines and Energy.
General Information  Mine Started on :  Extractable reserves: 17.5 MT  Mine leasehold area: 4.6 Sq. Km  Workable seams ==>1. Queen Seam (thickness.
Validation of the Ventgraph Program for use in Metal/Non-Metal Mines
Mine Rescue Gas Detection
UTILIZATION OF BOOSTER FANS IN UNDERGROUND COAL MINES
Austar Coal Mine The Positive Pressure Chamber Austar Coal Mine & Joncris Sentinel Services Proactive: - Spontaneous & Combustible Gas Management - Seal.
Keynote Address 14 th US/North American Mine Ventilation Symposium Christopher J Pritchard MS PE Mining Engineer Team Leader (Acting) Ventilation Group.
2014 Pennsylvania State Mine Rescue Contest Team Statement Thank you for responding to this emergency to the Carmike Mine # 3. This mine had been an active.
COAL IS GOOOOOD!!!!! GOOD COAL GOOD COAL IS GOOOOOD!!!!!
The Hiki Tiki Mine. The Basic Mine Layout Ventilation/ Beltways/ Escapes.
© Mark E. Damon - All Rights Reserved Directions: Scroll through the presentation and enter the answers (which are really the questions) and the questions.
Gases Underground Stone and Limestone Mines Objectives 4 Identify mine gases 4 Describe the hazards of mine gases 4 Explain the effects of gas exposures.
Rock Springs 2014 Problem Map Loose roof Supportable Loose Roof Supportable Rock Burst B Caved Air Tight Floor Bleeder Fire LHD LHD on Fire 3 Miners, One.
The Sunshine Mine Disaster: A case study for emergency response
MINE RESCUE ACTIVITY BOOK – Section IV MSHA 2208 NOVEMBER 1981 JUNE 2005.
Sago Mine Rescue Overview
1 Partial Pressure Pressure of individual gases in a mixture.
Earth’s Energy & Mineral Resources. Section 1: Nonrenewable Energy Resources.
26 TH ANNUAL CONTEST JUNE 5 TH INDIANA STATE MINE RESCUE CONTEST.
MINE RESCUE Procedures: Establishment of surface control For dealing emergencies like explosions, fires, heating, outbursts at any mine, the first step.
Final Rule SEALS April 18, Overview § Seal Strengths, Design Applications, and Installation § Seal Strengths, Design Applications,
Scavenge fires Oily carbon deposits build up in the scavenge trunking during normal operation of the engine. Drains are provided in order to remove such.
SPOTANEOUS COMBUSTION Spontaneous heating Certain materials have tendency to self heat due to oxidation process, if the heat produced is faster than the.
Code of Federal Regulations 30 Part 57 – Safety and Health Standards – Underground Metal and Nonmetal Mines Subpart J – Travelways and Escapeways
Chapter 4. Subsurface Ventilation Systems Mine Ventilation and Safety Jiangxi University of Science and Technology 1 Review for Last Classes 
2014 A Skills Mine Rescue Problem. Mine Rescue Statement 2014 A Welcome to the Happy Go Lucky Mine. This is a high wall mine with a history of water and.
2015 Post No.5 & West Virginia State Mine Rescue Contest Day 2 Problem Briefing.
On-Shift Examination Scenario Continuous Miner Section What you will need: Pencil and paper to take notes or perform calculations Calculator to calculate.
2015 Post No.5 & West Virginia State Mine Rescue Contest Day 1 Problem Briefing.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
Mine Recovery MSHA 2207 November 1981 June 3, 2005.
2013 MTTC Pennsylvania Regional Skills Contest April 22-25, 2013.
D office decline east portal D Highway 1 Highway 2 Highway 3 Crosscut 4 Crosscut 3 Crosscut 2 Crosscut 1 TEAM AND FRESH AIR BASE MAP vent shaft sump D.
Problem Briefing 2013 Day 1 Problem Briefing ACA DAY 1 Statement You are located on the surface of RT #15 mine. This is a new highwall mine that.
Mine Emergency Preparedness Training Mine Recovery.
What is a safe work permit? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific.
Pre-Shift Examination Scenario Continuous Miner Section What you will need to complete this exercise: Pencil and paper to take notes or perform calculations.
FRESH AIR BASE Placard 1. INTAKE PORTAL Placard 2.
Ventilation Map N FAB Entry 1 Entry 2 Entry 3 D East Decline West Shaft (Intake) Door Closed Temporary Stopping A Temporary Stopping B Mine Fan ON/OFF.
MINE RESCUE ACTIVITY BOOK – Section II-b.1 MSHA 2208 NOVEMBER 1981 JUNE 2005.
Unit A 6-4 Mechanical Systems and Technology. Problem Area 6 Agricultural Power Systems.
Indiana Mine Rescue Statement 2013 Thank your for assisting us with our emergency at the Vincennes No. 1 Mine. You are located at the fresh air base established.
2012 Mine Rescue Contest Day 1 36 th May 15 th 2012 Judge’s Briefing.
D D PC B Loose Roof End of Water x x x x Suction hose 6 posts x x Posts set Refuge chamber Sump with pump Door opened Door closed Water over knee deep.
STATEMENT Welcome to the TG Mine and thank you for your help. We have a 5 person crew that was tagged in on the mine tag board. They were working an idle.
Temperature Test Allows monitoring of temperature changes.
Rock Springs Mine Rescue June 2016 – Day 1
2013 Skills Mine Rescue Problem.
N N D D C Ventilation Map FAB Entry 1 Entry 2 Entry 3 Jim Swan 30-inch
38th 2014 Day 1 Problem Briefing Problem Briefing.
KCA Regional Skills Contest July 31, 2012 Mine Rescue Problem
Presentation on Anjan Hill Mine Accident on
Ventilating The Face Area
2016 KCA Regional Mine Rescue Skills April, 7th 2016
2013 Day 2 Problem Briefing Problem Briefing.
Tankabel Mining Co., Inc. I.D. No Rochester, NY Map Legend:
2015 KCA Regional Mine Rescue Skills April, 9th 2015
2016 Post 5 & West Virginia State Mine Rescue Contest Day 2
2014 Illinois State Mine Rescue Contest
2012 PA Regional Skills Contest
Day Two.
2012 Mine Rescue Contest Day 2
2014 KCA Regional Skills Contest
DAY ONE.
FRESH AIR BASE Placard 1.
2016 KCA Nationwide Skills Championship
Fresh Air Base Statement
2016 Mine Rescue.
Presentation transcript:

DEALING OF FIRE AND RE-OPENING AT RK-NT Inc,SRP Area

General Information about the Mine Name of the mine: Ravindrakhani New Tech Inc Location of the mine: Mine is situated 14kms from Manchiryal Rly. Stn in Adilabad,Dist,(A.P) Opening of the Mine: No.of Seams: 2 (No.1A, 1 seam) Parting between both :16 mtrs to 20 mtrs. Seams Average Gradient: 1 in 4.2 Mine take Area: 344 Ha. Targeted Productin :4.62 Lakh Tonnes. Worked out panels by Caving:1A-N1,1A-N2,1A-1,1A-2,1A-3,1A-4 :1-N1,1-N2,1S-1,1S-2,1S-3 Working districts: 1A-6,1A-5,1S-6, 1S4 caving depillaring panels. Contd..

About the mine  8 SDL’s were worked with pony belt conveyor system in 4 depillaring caving panels.  Men on roll of the mine was 1622  The mine was provided with Chair Lift Man riding system from surface to 39 L/1A seam for a distance of 1.16KMs.

1A SEAM WORKING SECTION

1A SEAM WORKINGS PLAN

1 SEAM WORKINGS PLAN

1SEAM WORKING SECTION

1 SEAM WORKINGS PLAN

Works engaged on playday in I Shift ( ) Gear box drain plugs and Gear oil changing work to S8 SDL at 1S6 panel. (Welding work Engaged) Track roller changing work to S5 SDL at 1A6 panel. (Welding work Engaged) Cable changing work to S3 SDL at 1A6 panel. 3 Lakh fan and 150 HP hauler maintenance Hauler Rope re-coiling work at 1AS/33R

Supervision & manpower engaged on playday ( ) DesignationI shiftII ShiftIII shift Roster Officer &Engineer HOM/OM02 MS/SF02 MCH01-- E/FM02-- Electrician0601 Fitter0601 Welder02-- Pop07 Others3403 Total6216

Events prior to the occurrence of fire : In 1A-6 panel in 31 LN gallery S5 SDL right traction rollers replacement was arranged. They have completed the gas welding work by 11.30am, stopped the work at 1.30pm and came to surface by 2.20 pm. This work was done by Sri. Sadaiah, Fitter with the help of gas cutting by Sri SIAA Saleem, Welder. In 1A-6 31A LN gallery trailing cable changing work was done for S-3 SDL by 1.45 PM, by Sri Venkatrajam, Electrician with his crew. In 1S-6 panel S-8 SDL oil filling in traction gear box was done by Sri Vijaya Rama Rao, Fitter and SDL Canopy welding work has carried out by Sri Venugopal Raju, welder with his crew. completed the work at about 11:15am

Events prior to the occurrence of fire : In panel 1S-4 for S-7 SDL restoration of remote control work was done by 12:30 pm. After the completion of cable changing work at 31 A LN /34 dip it is reported that they were coming up along 33 dip and they reported that some smoke was noticed in 30 LN/33 dip. It is also reported that traction rollers changing work was completed by 1.30 pm. This crew has observed smoke coming from in bye of the 36 dip/ 31L, they have escaped along 31 level along belt section.

PART PLAN OF NO.1 SEAM

PART PLAN OF NO. 1A SEAM

Chronology of Events prior to the occurrence of fire : PM Fan operator observed the smell PM Fan stopped by Sri V. Venkata Rao, Electrician for planned repairs of MOCB, at RK-NT sub-station by work shop. 2.15PM Power restored PMFan started –black smoke noticed 2.50 PM All persons were removed from Under Ground.

Rescue Events in Initial Hours 3.30PM Incharge MRS, MM, Supt. MRS, RG have reached to the spot PM Rescue team collected Samples from Fan Evasee 6.00 PM Rescue team inspected main return at 3L/1A Seam, CO found 1200 ppm and main return 0L/1Seam, CO found more than PM Established control room on surface at RKNT PM Two rescue teams proceeded to Underground to short circuit the 1A seam & 1Seam. ventilation circuit. Samples collected from 1Seam & 1A seam. observed dense smoke and CO more than 2000 ppm 8.50 PMDecision was taken to seal off the Mine entries

Closure of Mine Entries 9.00PM to PM Air shaft (intake) was temporarily closed PM TO 6.00 AMClosed Manway and Main Incline 6.05AM300hp Main Fan stopped 6.15 AM to 11.20AMUpcast Shaft and Down cast Shaft were closed on 14/07/08

ANALYSIS RESULTS OF SAMPLES TAKEN AT RK NT BEFORE SEALING SL NO. DateLocationCO 2 O2O2 COCH 4 H2H2 N2N2 CO/O 2 Ratio Effecti ve combu stibles Effect ive inerts CO 2 /O 2 Ratio Ratio , 5.30 pm Fan evasee , 8.15 pm Fan evasee ,10.05 pm 1L N/ 1S ,1.45 am Fan evasee ,3.15 am Fan evasee

SMOKE AT INTAKE AIR SHAFT AT THE TIME OF SEALING

Dealing/ Monitoring of Fire  Surface Bore holes(18 Nos) plugging done.  Crack Filling over goaved out panels was done.  Mine air samples not obtained due to negative pressures after closing of mine entries and with establishment of pressure balance chambers (sliding doors with auxiliary fans) at Manway, Main Incline on 18/07/08 and Fan shaft on 21/07/08 and Air samples were collected.

Dealing/ Monitoring of Fire  Surface Bore holes(3 nos) were drilled to 1A Seam and 1Seam for inertisation and monitoring of gas samples.  372 ( each 7000 lit) nos. of CO2 cylinders were flushed through to surface bore holes and Air shafts.  10 tonnes of liquid CO2 was flushed through return air shaft.  Air samples were collected from surface bore holes, mine entries and inter seam bore holes from RK-7.  Bore holes temperature was monitored.  Regular inspection and monitoring was done.  All the works were carried out under Rescue cover.

Interpretation of Mine Air samples Interpretation of mine air samples from to revealed the fire has died down. Details are as below.  Oxygen was dropped to 0.961% from 17%.  Carbon monoxide was dropped to 0 from 4.440%.  Methane dropped to 0.725% from 1.360%.  Hydrogen was dropped to 0% from 3.180%.  Effective combustibles were dropped to 0.72 from  CO/O2 ratio was dropped to 0 from 64.  Effective inert was increased to 99 from 11.  Carbon dioxide was increased to 8 % from 2.3 %.  R value was increased to 1 from 0.1 resulted in reduction of explosive mixture area.

ANALYSIS RESULTS OF SAMPLES - PRE/POST SEALING AT RK NT SL Date & Time Place CO 2 O2O2 COCH 4 H2H2 N2N2 CO/O 2 ECEI CO 2 /O 2 Remarks ,5.30pmFan Pre Sealing ,8.15pmFan ,10.05pm 1LN/1 S ,1.45amFan , 3.15amFan , 2.00pmMWD Post Sealing , 3.40pmMWD ,2.30pmMWD ,2.30pmMWD ,6.35amMWD ,5.40pmSBH , 2.00pmMID , 4.00pmMID , 2.15pm MID , 2.20pmSBH , 2.10pm MID , 2.00pmSBH , 2.45pmSBH , 3.20 pmSBH , 3.20 pmSBH , 3 pm SBH , 2.35pm SBH , 1.30am SBH , 2.30pmSBH , 2.35pmSBH

ANALYSIS RESULTS OF SAMPLES TAKEN AT RK NT MID SL NO DateCO 2 O2O2 COCH 4 H2H2 N2N2 CO/O 2 ECEICO 2 /O 2 Ratio ,2.35pm ,2.00pm ,4 pm ,2.15pm ,2.20pm , 2.10pm , 2.30pm , 2.50pm , 2.40pm , 3.00pm ,3.00pm , 2.45pm , 2.30pm , 2.30pm , 4.00pm

LOCATION : SURFACE BH 1(8L/37R)1A SEAM ANALYSIS RESULTS OF SAMPLES TAKEN AT RK NT SURFACE BH 1A SEAM SL NO DateCO 2 O2O2 COCH 4 H2H2 N2N2 CO/O 2 ECEI CO 2 /O 2 Ratio , 3:50 pm , 3.15pm , 6.00pm , 2.05pm , 2.30pm , 3.00pm , 5.30pm , 2.00pm , 2.45pm , 3.20 pm , 3.20 pm , 3 pm , 2.35pm , 3.30pm , 2.00pm , 2.15pm

LOCATION : MID AFTER SEALING ANALYSIS RESULTS OF SAMPLES TAKEN AT RK NT MID SL NO.DateCO 2 O2O2 COCH 4 H2H2 N2N2 CO/O 2 Ratio Effectiv e combus tibles Effectiv e inerts CO 2 /O 2 Ratio Ratio , 2:00pm , 3:05pm , 6:35pm , 6.30am , 2.30pm ,2.35pm , 2.00pm ,4 pm ,2.15pm , 2.20pm , 2.15pm , 2.30pm , 2.50pm , 2.40pm ,3pm ,3pm , 2.45pm , 2.30pm ,2.30pm pm

RE-OPENING OF MINE Re-opening of mine is under taken from 06/08/08 and still continuing. The sequences are as below  Initial openings were made at main incline, man way and intake air shaft and ventilation circuit was established with 20HP auxiliary fan and explored the workings up to 4L and air intake air shaft.  Stoppings were built at entries to 1 Seam at main incline, man way and 5L tunnel to cut off air supply to 1 Seam workings.  Opening was made at return air shaft and ventilation circuit was established with 50HP Fan.  Explored return Air shaft in 1A seam and cut off return air ways with temporary stoppings in 1 seam return shaft.  Explored the workings in 1A seam up to 40L including working districts and found normal environmental conditions.

RE-OPENING OF MINE  Explored the 1S 6 panel of 1 seam through 33D tunnel and 31 ½ tunnel.  During the Exploration 1.Roof falls noticed between 18AL to 20 L 2.Cables, belt conveyor and coal burnt in 1S SDLs were covered under roof falls in 1S SDLs were drowned in 1S4. 5. Burnt ash was found in 25LN/1S6.

RE-OPENING OF MINE  Isolating of 1S-6 panel from 26L to 13L between 37R and 36R is planned and the stoppings at 26L, 25L, 38R, 37R of 24L,18LN, 14LN, 13LN and 12LN were completed and partially constructed at 23LN/36R.  Due to Intense heat and smoke along 36R further rescue work could not be taken up and decision taken to seal off entire 1 Seam at inter seam tunnels and Up cast shaft below 1 seam.  Accordingly all the entries to 1 seam and Up cast below 1 Seam were closed.  Drilling of up ward bore hole from RK-7 workings to RKNT is under progress for de-watering.  High capacity pumps are being installed for de-watering the mine energizing of the power is under progress.

CARBON MONOXIDE EFFECTS % of CO Physiological Effects 0.02 Slight headache after 2 hours exertion or after 4 hours at rest Headache, dizziness and possibility of collapse ater 45 min, exertion or after 2 hours at rest Palpitation and giddiness after 10 min. exertion or after 30 min. at rest Unconsciousness after 10 min. exertion or after 30 min. at rest Unconsciousness after 5 min. exertion.

GRAHAMS RATIO (CO Produced / O 2 Obsored ) % Ratio Status of spontaneous heating/Fire 1.0 Indicates existence of heating 2.0 Indicates serious heating approaching active fire 3.0 Indicates active fire

Explosibility Diagram Description Formula Effective combustibles CH CO H 2 Effective inert 1.5 CO 2 + excess N 2 Ratio CH 4 / (CH 4 +CO+H 2 )