MTAC #107 Update November 1, 2006 Washington DC. MTAC #107 2 © 2006 Accenture. All rights reserved. Progress Goal  To provide key visibility points for.

Slides:



Advertisements
Similar presentations
® Service Performance Measurement using Intelligent Mail & Seamless Acceptance.
Advertisements

MTAC Workgroup 100 Seamless Acceptance for MLOCR Environment Co-chairs Industry – Jay Gillotte USPS – Pritha Mehra.
Global Systems Management Surface Visibility Presented by USPS at July 10 Packages Subgroup Meeting.
MTAC General Session Meeting Electronic Verification System (eVS)/ Product Tracking System (PTS) User Group #2 February 16, 2011.
Service Performance Measurement using Intelligent Mail & Seamless Acceptance.
Intelligent Mail® Made Simple Through Outsourcing Dan Hindman PB Presort Services June 21, 2010 Dan Hindman PB Presort Services June 21, 2010.
Understanding & Using the USPS DSMS System The Benefits, Requirements Added Value of the Drop Ship Management System.
Mailer’s Technical Advisory Committee (MTAC) Task Team 2 General Session Presentation November 16, 2010.
Visibility Strategy September, Visibility Today CONFIRM provides piece level mail processing data that can be used for tracking for letters and.
2007 National PCC POWERING UP YOUR BUSINESS with Intelligent Mail®
MTAC General Session Meeting Electronic Verification System (eVS®)/ Product Tracking System (PTS) User Group #2 Industry co-chair – John Medeiros Postal.
1 MTAC Workgroup 117 October 22, 2007 Washington DC.
1 MTAC WORKGROUP 111 Status Update Nov 1, Work Group 111 Charter Issue Statement: Identify gaps, define solutions, highlight benefits, and improve.
MTAC Update November 6, 2002 Larry Goodman USPS Co-Chair Dan Minnick Industry Co-Chair.
1 Pritha Mehra Vice President, Mail Entry and Payment Technologies Mail Entry and Payment Initiatives.
FAST for Periodicals MTAC Workgroup 95 Washington, D.C. November 8, 2007.
PostalOne! ® Electronic Mail Improvement Reporting (eMIR) Electronic Mail Improvement Reporting (eMIR) Marketing Technology & Channel Management.
Washington DC May 18 th, 2005 MTAC Workgroup #87 Status Improving the Drop Shipment Process.
Improving the Drop Shipment Process MTAC Workgroup #87 Washington, D.C. January 30, 2008.
November 01, 2005 MTAC 93 Design & Concept Testing Workgroup Status.
Monthly Updates to Presort Data. Agenda What is Presort Data? History of Update Schedule Important Terms to Understand The New Schedule Transition to.
MTAC Workgroup 93 Streamlining Verification Debbie Cooper Bob Galaher May 18, 2005 Washington DC.
Corporate Automation Plan PHASE 2 February 4, 2004Washington D.C.
EInduction Overview 1 eDropship Post-Induction Process October 6, 2010 MTAC Workgroup 138.
Acceptance and Induction: The Mailing Industry’s Digital Revolution IDEAlliance Print Distribution April 22, 2007 Debbie Cooper.
1 Presentation Topics Agenda  January Release  BMA Channel Strategy –eDropship –Expanded Start-the-Clock  MTAC Workgroups.
MTAC Meeting February 23, 2005 Integrated Mail Management.
Improving the Drop Shipment Process MTAC #87 Update Washington, D.C. November 2, 2006.
Intelligent Mail February Vision Provide end-to-end visibility and a seamless process for mail acceptance and delivery, using standardized intelligent.
EInduction Overview 1 eDropship Induction Process September 8, 2010 MTAC Workgroup 138.
EInduction Overview 1 eDropship Post-Induction Process November 15, 2010 MTAC Workgroup 138.
USPS Product Information MTAC Jim Cochrane Vice President, Product Information February 17, 2011.
Mail Acceptance and Induction Seamless Mailing with Intelligent Mail Barcodes Debbie A. Cooper Quebecor World Logistics.
USPS Mailer Technology Study MTAC February 5, 2004 Jeffrey Freeman Manager, Mail Technology Strategy Intelligent Mail and Address Quality.
MTAC Workgroup 102 Advance Notification, Streamlined Acceptance & Visibility for First-Class Mail May 16, 2007.
MTAC Workgroup # 87 Update Improving the Drop Shipment Process Washington, D.C. May 18, 2006.
Workgroup #94 Service Performance Reporting Process Standardization MTAC Meeting Presentation August 17, 2005.
1 MTAC eVS®/PTS User Group Thursday November 10, 2011.
MTAC Workgroup 93 Streamlining Verification Debbie Cooper Bob Galaher Feb 22, 2006 Washington DC.
Improving the Drop Shipment Process MTAC Workgroup 87 Update Washington, D.C. August 2, 2007.
Optimizing Parcel Preparation & Entry for Seamless Acceptance MTAC Work Group # 109 Industry Leaders: Chris Finley & Wendy Smith USPS Leader: Jim Cochrane.
Container manifest Communication  MTAC - eInduction 1.
MTAC Workgroup #87 - Update Improving the Drop Shipment Process August 3, 2006.
MTAC MAIL IRREGULARITY FEEDBACK WORKGROUP MTAC Presentation February 6, 2003.
August 3, 2006 MTAC Workgroup #95 FAST for Periodicals Update.
MTAC Work Group #82 Parcel Delivery Performance Measurement Effectiveness.
Advance Notification Streamlined Acceptance and Visibility for First-Class Mail MTAC Workgroup 102.
MTAC Workgroup 102 Update Advance Notification, Streamlined Acceptance & Visibility for First-Class Mail January 2008.
® Mailer’s Technical Advisory Committee Meeting USPS Headquarters Washington, DC November 19 th, 2009.
1 Intelligent Mail ® Barcode Implementation Federal Register Notice ©USPS2007.
1 Seamless Acceptance, Performance- Based Verification Implementation, Benefits, Obstacles and Feedback Ty Taylor, JC Penney Pritha Mehra, USPS MTAC 117.
® Secure Destruction Service Update Sam Pulcrano Vice President, Sustainability Jim Wilson Manager, Address Management MTAC Washington, DC November 18.
MTAC Workgroup 114 Establish Service Standards and Measurement Standard Mail Measurement July 30, 2007 Std Subgroup Meeting.
EInduction Overview 1 eDropship Post-Induction Process TBD MTAC Workgroup 138.
Streamlining Verification MTAC Workgroup Mission Statement: –Collectively determine how the USPS and the Industry can leverage existing, or guide.
Mailer Rating National Deployment Introduction. FAST 2 Agenda Mailer Rating Overview Mailer Reminders Mailer Rating Resources.
MTAC #95 Update FAST for Periodicals November 2, 2006 Washington DC.
1 Start-the-Clock for Non Full-Service Mailings MTAC 139 November 17, 2010 Rose FlanaganChris Simone Data-Mail IncUSPS.
Status for MTAC #123 Workgroup Service Information Needs, Reporting and Communication Channels.
MTAC MAIL IRREGULARITY FEEDBACK WORKGROUP MTAC Presentation May 8, 2003.
Improving the Drop Shipment Process Update MTAC Workgroup #87 Washington DC – August 18.
MTAC Workgroup 107 eVS/FAST/SV Integration Washington, D.C. August 2, 2007.
MTAC User Group 1 Task Team 14 Status Update. Overview of the Task Team 14 Task Team Title: ―Electronic documentation solution that enables verification,
1 MTAC Work Group 138 eDropship November 18th, 2010.
MMA presentation for MTAC August 2, MTAC Association Presentation Wednesday, August 2, 2006.
1 MTAC WORKGROUP #111 MTAC GENERAL SESSION PRESENTATION August 2, 2007 Presented By Cher Rupp-Ruggeri Steve Colella.
Association Presentation Mailers Technical Advisory Committee November 7, 2007 John A. Sexton.
1 First Class MTAC Workgroup 102 November 1, 2006.
1 First Class MTAC Workgroup 102 February 20, 2007.
1 PostalOne! User Group  Created from sunsetting of MTAC 84 on 11/4/05  Co chaired by Watt Bryan, Postal Affairs Senior Analyst, RR Donnelly and Melody.
Presentation transcript:

MTAC #107 Update November 1, 2006 Washington DC

MTAC #107 2 © 2006 Accenture. All rights reserved. Progress Goal  To provide key visibility points for parcels and obtain pre-notification for all parcel drops to support improved workload management August  Discussed the overall goal of the MTAC #107 workgroup  Identified several USPS stakeholders  Identified several Parcel stakeholders, including Clarke American, Pitney Bowes, endicia and Newgistics  Discussed the need for additional corporate volunteers to ensure a balanced work group

MTAC #107 3 © 2006 Accenture. All rights reserved. Progress September  Discussed and reviewed the objectives for the group –Develop an approach to provide visibility for Parcels to allow Parcel mailers to provide pre-notification of origin entry and dropship eVS mailings to utilize existing barcodes, such as the Surface Visibility mailer barcode and the parcel tracking barcode (i.e., UCC 128) Size, height and width of barcode for different Parcel sizes –Provide insight into technology changes of key applications, such as APPS and PostalOne! TM –Investigate possibilities to integrate eDropShip and eVS processes  Identified additional Parcel Industry stakeholders –Quebecor World, Cornerstone Shipping, abol Software, BMG Columbia House and Ridgway

MTAC #107 4 © 2006 Accenture. All rights reserved. Progress October  Provided a high level overview of FAST/ Surface Visibility, Intelligent Mail and Barcode Technology, eVS and how these systems interact with one another  Communicated that FAST should be viewed as a system that integrates with Surface Visibility to provide key visibility points and serve as the key entry point to the USPS mail system –FAST should not be looked as a replacement for DSAS  Indicated that USPS is committed to providing rating systems to encourage: –Mailers to provide accurate advance notification of incoming mail and –USPS facility personnel to provide improved customer service  USPS communicated that it will Investigate if ePayment postage can be done with uniquely identified pallets to reduce verification cost

MTAC #107 5 © 2006 Accenture. All rights reserved. Next Steps Provide overview of Product Tracking System (PTS) Discuss integration of eVS/FAST/Surface Visibility Discuss APPS Meet in early December 2006