LBT Q1 2008 Eng/SW Review SHTRShutters/Seals/Mechanisms.

Slides:



Advertisements
Similar presentations
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
Advertisements

LBT Q Engineering Review ALPC – Primary Mirror Aluminum Shooting.
Energy Efficiency & Canadians National Opinion Research for CEEA April 12, 2013.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
1 LBT Q Eng/SW Review SHTR: Shutters. 2 Highlights (Q1/2009) Shutters have been working well, generally Shutters have been working well, generally.
Memory Craft Feed Dog Drop Step Motor Adjustments.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli, Chris Biddick.
KLINGE’S NMR 262 Two Independent Systems Integrated into one Unit This Requires Special Features:  Total Redundancy of Refrigeration Components  Total.
Clarinet Repad This presentation shows pictures of a clarinet repad in progress. The procedure is basically the same for all woodwinds: The keys are removed.
MICE Radiation Shield Installation 1 18 th October2012 Summary of initial test N. Collomb.
IFR End Door Enhancement Mechanical Engineering Status & Installation Issues H. James Krebs June 23, 2001.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
1.0 INTRODUCTION Seán Moran. SIMPLE? Commissioning is a complex issue requiring: Planning Leadership Teamwork Training Communications.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Kern.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
Atherton Project Review 20/07/2009 Sterilizer Loading Car and Trolley upgrade : DES
LBT Q Eng/SW Review ROT - Rotators. 4-Apr-2008LBT Q Eng/SW Review Highlights First BG rotator installed First BG rotator installed BG cable.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review Primary Mirror Cells Biddick/Gusick/Kern.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Eng/SW Review ECS: Enclosure Control System.
LBT Q Engineering Review Swing Arms (SWA) Apr-04LBT Q Engineering Review Highlights (Q4/2007) The PF SAs lost their cable trays The.
LBT Q Eng/SW Review TEL – TELEMETRY Tony Edgin.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli.
1 LBT Q Engineering Review ICS – Instrument Cooling System.
1 LBT Q Eng/SW Review PVM: Preventive Maintenance.
LBT Q Eng/SW Review TERC Tertiary Mirror Units Commissioning.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Howard.
1 LBT Q Eng/SW Review PLMG: Plumbing. 2 Highlights (Q2/2008) Have recently replaced worn contactors in the Primary Loop chillers Have recently replaced.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Engineering Review Instrument Cooling.
1 LBT Q Eng/SW Review ICS – Instrument Cooling System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review SAB Static Balancing.
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Eng/SW Review CM – Configuration Management Stephen Hooper.
OPTIONAL The second lifting guide rail is ready for the secondary lifting trolley(optional part).
1 LBT Q Eng/SW Review PWR: Site electrical power.
1 LBT Q Eng/SW Review ECS: Enclosure Control System.
21 July 2008 LBT Q Eng/SW Review 1 SIN – Software Infrastructure Titus Purdin.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering Review ESW Engineering Software.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering and Software Review ENGG Engineering General.
Booster Shutdown Work - Week 4 Dump and Shielding installation completed Q805/Q806 re-installed, Septum in place Need to align quads and septum before.
1 LBT Q Eng/SW Review PWR: Site electrical power.
LBT Q Eng/SW Review DIMM – Differential Image Motion Monitor.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
LBT Q Engineering Review PMCD. 21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.
LBT Q Engineering Review DAQ. 19-Apr-2007LBT Q Engineering Review Housekeeping System Requirements Interface directly to the Agilent 34970A.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
Plumbing Valves.
1 LBT Q Eng/SW Review PLMG: Plumbing, Chiller Systems.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Engineering Review Swing Arms (SWA). 10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) The right secondary arm is wired and the.
LBT Q Engineering Review Primary Mirror Cells.
1 LBT Q Eng/SW Review PSPI: PEPSI installation preparation.
Landing gear systems.
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
Presentation transcript:

LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms

2008-Apr-04LBT Q Engineering Review Highlights (Q4/2007) Nothing significant Nothing significant

2008-Apr-04LBT Q Engineering Review Progress (Q4/2007) Planning From Q4 Review: Planning From Q4 Review: Install rest of first batch of floating sockets (no) Install rest of first batch of floating sockets (no) Get 0716 back online √ Get 0716 back online √ Monitor rails (no) Monitor rails (no) Harass people about backup generator √ Harass people about backup generator √ Our 208V generator is not suitable – need a 480V 3 ph. Our 208V generator is not suitable – need a 480V 3 ph ball detent switch adjusted 1010 ball detent switch adjusted 1009 ball detent mechanism upgraded 1009 ball detent mechanism upgraded 0704 locked out to replace stripped gears – adjustment problems? 0704 locked out to replace stripped gears – adjustment problems?

2008-Apr-04LBT Q Engineering Review Open Issues Technical Technical Emergency Power for Shutter Door Closure Emergency Power for Shutter Door Closure Shutter Rails Shutter Rails Upper left rail may have an alignment problem Upper left rail may have an alignment problem Lower left rail bogies misaligned Lower left rail bogies misaligned Leaky Seals (IssueTrak 944) Leaky Seals (IssueTrak 944) Schedule Schedule Time to install floating sockets Time to install floating sockets Financial Financial Buy a 480V 3 ph generator Buy a 480V 3 ph generator Resource Resource Mountain manpower availability Mountain manpower availability

2008-Apr-04LBT Q Engineering Review Planning (Q1/2008) Install rest of first batch of floating sockets Install rest of first batch of floating sockets Get 0704 back online Get 0704 back online Monitor shutter rails Monitor shutter rails Harass people about backup generator Harass people about backup generator Need to buy 480V 3ph genset Need to buy 480V 3ph genset