NPCC Wildlife Crediting Forum Issue Resolution March 17, 2010.

Slides:



Advertisements
Similar presentations
Parallel Flow Visualization/Mitigation Proposal
Advertisements

DRAFT Wildlife Program Amendments Joint Technical Committees and Members Advisory Group Amendment Strategy Workshop July 23, 2007.
Wildlife Operations and Maintenance A UCUT Perspective on the issue.
Proposed Southern Idaho Wildlife Settlement between Idaho and Bonneville Northwest Power and Conservation Council Wildlife Advisory Committee August 19,
Types of Cost Sharing Mandatory: When the sponsor stipulates that cost sharing or matching funds are required as a condition of receiving an award. Specifically.
BPA’s Pisces Wildlife Crediting Ledger Bonneville Power Administration February 17, 2010.
Modified Charleston Method (MCM)
Conferences: Facilitate Change Conflict Problem Solving Negotiation.
1 OBF #74 May, 2001 Consensus. 2 Discussion Points: –What it is –What it is NOT –How to recognize it –How to achieve it –Going forward without it Achieving.
The Outcomes of the Fourth High Level Forum on Aid Effectiveness (HLF-4) Aid Quality & Architecture Division Development Co-operation Directorate OECD.
Revision of key attributes and transitional measures relating to possible changes in the JI guidelines Wolfgang Seidel, Chair of the Joint Implementation.
The Outsourcing Process
Operational risk management Margaret Guerquin, FSA, FCIA Canadian Institute of Actuaries 2006 General Meeting Chicago Confidential © 2006 Swiss Re All.
Improving Organizational Performance Assisting organizations learn why and how to continually improve their effectiveness and efficiency Misty River Consulting.
Green Recovery And Reconstruction: Training Toolkit For Humanitarian Aid Environmental Impact Assessment Tools and Techniques Session 2: Tools for Conducting.
QUALITY ASSURANCE PROJECT Improvement Coach The purpose of this session is to introduce participants to the role of the improvement coach and prepare for.
Strategy Development Tools. SCENARIOS GUIDING PRINCIPLES / POLICIES (Core Values of the Company) STRATEGIC GOALS (How we wish to relate to the environment)
QUICKSTART Pareto Chart. Pareto Chart Understand what the Pareto law is Understand what a Pareto diagram is Provide Pareto analysis by level Provide examples.
The Global Protocol on Packaging Sustainability European Food SCP Round Table Plenary, Brussels 8 December Julian Carroll Managing Director EUROPEN.
Agricultural Conservation Easements John Bonham Carolina Mountain Land Conservancy.
Environmental Management Systems in Massachusetts April, 2003.
Foundations of Catholic Healthcare Leadership. Ethical Decision Making.
PEACE III - Theme 1.1 Aid for Peace – Phases I & II 21 September 2011 Celeste McCallion.
INFORMATION ASSURANCE USING C OBI T MEYCOR C OBI T CSA & MEYCOR C OBI T AG TOOLS.
The UNECE Task Force : the approach towards the set of indicators Dr. Olivier Thunus UNECE Task Force Vice-Chair.
Peak RCCo Performance Metrics Draft –November 2013.
Chelan County PUD March 16, Staff recommendation for license action and resolution License Order Rehearing and Clarification Rehearing Items License.
More on relational databases, including 1 to 1, 1 to many and many to many relationships Please use speaker notes for additional information!
Performance Assessment Assessment of Organizational Excellence NSF Advisory Committee for Business and Operations May 5-6, 2005.
1 What’s Next for Financial Management Line of Business (FMLoB)? AGA/GWSCPA 6 th Annual Conference Dianne Copeland, Director, FSIO May 8, 2007.
Management & Development of Complex Projects Course Code MS Project Management Perform Qualitative Risk Analysis Lecture # 25.
Stakeholder consultations Kyiv May 13, Why stakeholder consultations? To help improve project design and implementation To inform people about changes.
Information Security Governance and Risk Chapter 2 Part 3 Pages 100 to 141.
Executive Invitation – Oracle Data Finder Service Oracle Corporation.
The IISD Model International Agreement on Investment for Sustainable Development: 1 st ANNUAL FORUM OF DEVELOPING COUNTRY INVESTMENT NEGOTIATORS Singapore.
PREMISES FOR DEVELOPING AND APPLYING SEDIMENT QUALITY OBJECTIVES Presented and (mostly) agreed upon during the October 27, 2004 meeting of the Advisory.
Teamwork Goal 4.01: Demonstrate characteristics of effective leadership.
Wildlife Program Amendments CBFWA Members Meeting – Sept
Vocational Pathways Award Vocational Pathways is an award on the Record of Achievement at NCEA Level 2 –providing a framework for vocational options –supporting.
1 IRU – database design part one Geoff Leese September 2009.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
IFMIS assessment for investment lending projects Gert van der Linde AFTFM Fiduciary Forum 2008.
Implementation and follow up Critically important but relatively neglected stages of EIA process Surveillance, monitoring, auditing, evaluation and other.
ODFW Habitat Mitigation Policy and Energy Facility Siting.
SOFTWARE PROJECT MANAGEMENT
SDOs and Patent Offices : Towards a better interface Dr Michel Goudelis, Director Telecommunications, EPO GSC-14, July 2009 Geneva, Switserland.
Project Management Learning Program 23 Mar – 3 Aprl 2009, Mekong Institute, Khon Kaen, Thailand Managing for Development Results Results-Oriented Monitoring.
United Nations Statistics Division Standard International Energy Product Classification (SIEC)
Global Protected Areas Programme Protected areas.... Achieving quality.
BSBPMG503A Manage Project Time Manage Project Time Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
Slide 1 Luxembourg, 28 June 2005 FACILITATING THE CROSS-BORDER EXERCISE OF SHAREHOLDERS’ RIGHTS Second European Corporate Governance Conference Pierre.
Standing Committee on Improvement Implementation Anne Aikman-Scalese, SCI Chair | ICANN-52 | February 2015.
Improvement Leaders Collaboratives Residential Module Effective teams.
Evaluation of the Community Advisory Committees to Boards of Victorian Public Health Services Health Outcomes International Pty Ltd HEALTH AND COMMUNITY.
1 Scenario formulation Scenario-based planning is a structured way of thinking about what might happen in the future Scenarios are descriptions of possible.
NCSX Interface Control Management Plan and Implementing Procedure 003 Peer Review December 19, 2002.
Wildlife Program Amendments Joint Technical Committees and Members Advisory Group Amendment Strategy Workshop.
Kerstin Ödman Chair of the Strategy Working Group Ad hoc NDPHS Strategy Working Group Report for the NDPHS committee of Senior Representatives Riga,
GBLWMP-SLUP Integration Meeting February 4-5, 2010 Sahtu Land Use Planning Board.
Getting to Net Zero Taskforce March 4. Agenda Getting to Net Zero Task Force Meeting. March 4th, :00PM-9:00 PM Smith Campus Center 700 pm Welcome.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
LLR LSCB MULTI-AGENCY SAFEGUARDING PROCEDURES 3.7 Escalation of Concerns and Resolving Practitioner Disagreements
Benefits of Advisory Panels Explore unmet needs Identify opportunities Review development plans Review protocols Understand patient needs Network PharmiKom.
1 BPA Fish and Wildlife Division Wildlife Management Costs: An Analysis Using Pisces Data November 2006 Council Update Coeur d’Alene, Idaho.
Project Cost Management
Wildlife Program Amendments CBFWA Members Meeting – Sept
Prodcom list.
Data Security and Protection Toolkit Assurance 2018/19
Presentation transcript:

NPCC Wildlife Crediting Forum Issue Resolution March 17, 2010

Decision-making Process Issues from the first two Forum meetings have been discussed, presented on, and recorded; and now consolidated and sorted (by facilitators and Forum Chair) into three primary categories. A fourth category – issues considered (by Forum Chair) outside of the purview of the Forum - has also been included. The issues under the primary categories were sorted by perceived “degree of difficulty” (by facilitators and Forum Chair) in eventually reaching consensus.

Decision-making Process - II Confirm the list of issues/concerns that are “off-the table.” Take up each primary Issue Category, and specific issues therein, in the order presented. Work to achieve consensus on what is needed to reach resolution on each issue.

Consensus Expressed in Terms of: Agreement as to NAME & definition of issue. Agreement as to KEY QUESTIONS, INFORMATION, and/or ACTIONS that form a path to resolution. Identification of the other issues on the agenda for which resolution of the issue under discussion may be LINKED. Recommendation(s) on how resolution of the issue under discussion will be taken to the “NEXT STEP.”

Issues Outside of Scope When is an Agreement an Agreement What prior Agreements/Programs are “part of” the current Program Replacement of the Pisces database program Time lag between impact and compensation Substitution of a completely different model from HEP

Clear Path to Resolution Replacing minimum HUs with actual HUs in the Ledger Using HEP only as an accounting tool Separate Willamette Basin crediting system Wildlife credits for fish projects Stacking credits

Uncertain Path to Resolution Where to “start” the Ledger - is the amount of mitigation remaining as of 2000 uniformly understood and agreed to? Credit for gains from construction and inundation impacts Resolving over- and under mitigation – and the potential for over-counting HUs

Unclear Path to Resolution To annualize or not to annualize Incorporation of baseline or “protection” credits Credit for pre-Act mitigation Basic mitigation rule (e.g.: 1:1 or 2:1). What basic metric(s) will apply to remaining mitigation crediting?