Dimensioning the focal plane (RSC centric version) C. Bebek 9 July 2003 Revised 14 July 2003.

Slides:



Advertisements
Similar presentations
Drawing In One-Point Perspective
Advertisements

ASE Flip-Chip Build-up Substrate Design Rules
TWO (2) Installation principles 1. Cabinets need to be installed straight, plumb, and level. 2. The area you are working in is rarely straight, plumb,
2x2 module & stave layouts. 2 options “Small chip” “Big chip” Boundary between “small” and “big” is determined by the 6” sensor wafer layout that must.
A vertical-flexure CCD module Bruce C. Bigelow University of Michigan Department of Physics 10/7/04.
» When you have completed this module you will know, what components do, what they physically look like and how they are represented in a circuit diagram.
Spiral Stairs Assembly Instruction By Laser Dollhouse Designs
Thurso High School Design and Technology Tutorial Six Assembled Part.
How to solve missing view problems and other mysteries of 3D worlds
Ceramic Focal Plane Components For SNAP B. C
MSU CSE 240 Fall 2003 Stockman CV: 3D to 2D mathematics Perspective transformation; camera calibration; stereo computation; and more.
1 Module and stave interconnect Rev. sept. 29/08.
LSU 06/04/2007Electronics 81 CAD Tools for Circuit Design Electronics Unit – Lecture 8 Schematic Diagram Drawing Etched Circuit Board Layout Circuit Simulation.
What to do when you are done. PRINTING WITH PHOTOSHOP.
The following slide has the same photo at three resolutions. Each version has been resized in Powerpoint to occupy the entire width of the screen. Remember.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
Day and Night by M.C. Escher
COLORS OF THE SUN Spectroscopy Activity
Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 1 EddiCam: The Eddington Photometric Camera Preliminary Design Layout.
Chapter-2 Standard Cell Techniques IC Mask Design 集成电路版图培训.
NINO RO chip qualification with the laser test system Sakari and Fadmar.
Bridging the Gap Problem-Solving Pupils’ Version.
Ciemat Mechanical Structure Proposal for a DHCAL m 3 Prototype. Enrique Calvo Alamillo Paris
Receive processed un-thinned wafers from E2V. Processed for bump bonding (dice, bump and attach read out chip)
TPAC progress Jamie C 29 th July TPAC1.1 Status Submitted 17 th –Some minor DRC errors found at foundry –Corrected/waived Re-Submitted 23 rd July.
LBNL CCD Packaging “Yale Mount” Mechanical Analysis Dan Cheng LBNL.
1 Jim Thomas - LBL New Pad Plane Design Proposal & Specifications Jim Thomas, John Hammond, Bob Scheetz, Jon Wirth, etc., etc., and a cast of thousands.
Melon’s Fantastic Perspective Power-Point Linear perspective is based on the way the human eye sees the world—objects which are closer appear larger,
TDCPIX_2012. TDCPIX size Proposal numbering pads.
To begin click: File, New, then select Design Familiarize yourself with the controls on the page. Then use the maximise button the make the window fill.
The Inclusive (Measurement ) FVTX aka iFVTX sponsored by LANL-DR in FY ‘06-08 FPIX Chip Module/Hybrid Testcard Pixel Plane Assembly/Integration.
redux Can the focal plane accommodate both RSC and RVS as viable NIR venders C. Bebek 28 April 2005.
ASSIGNMENT QUESTIONS Answers to Questions. Some of the Boundary Conditions and other details is missing! All assignments are general RF/MW engineering.
Design Studies 20 ‘Show Off’ Project How to make a computer monitor In Google Sketchup By: Liam Jack.
Alignment Tools Used To Locate A Wire And A Laser Beam In The VISA Undulator Project Wire Finder CALIBRATION A special fixture was constructed to calibrate.
Visual Computing Computer Vision 2 INFO410 & INFO350 S2 2015
SCALE & PROPORTION. Out of Scale Cartoon Donald Duck and Chip n Dale.
CS COMPUTER GRAPHICS LABORATORY. LIST OF EXPERIMENTS 1.Implementation of Bresenhams Algorithm – Line, Circle, Ellipse. 2.Implementation of Line,
1 Jim Thomas - LBL Changes to the Inner Sector Strongback to accommodate a wall between the inner and outer sectors (and a 2 nd wall at the innermost edge.
Perception and VR MONT 104S, Fall 2008 Lecture 8 Seeing Depth
Assignment D6.  CURVES include lines and arcs  A PROFILE is a closed region made up of curves  When you have trouble with a sketch that you can’t extrude,
Phase 2 Tracker Meeting 6/19/2014 Ron Lipton
Here’s the flange for the robot. Note colors for locations of pins on interface plate. Red - Anvil Pin Blue - Other Pins Orange - Spring Pin.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
Mechanical Perspective This enables you to get the measurements on a perspective drawing accurate.
R. Bradford 10 December, 2014 Sensor Details. Explanation Submitted some designs that will be included on the Novati/Tezzaron submission. Designs based.
Building LEGO Robots For FIRST LEGO League By Dean Hystad
Bump Bonding Development
MATTING. REMEMBER… Matt Board is expensive. Measure twice, cut once. Lay your matt board on something clean… on newsprint for example, NOT the floor!
R. Bradford 3 February,  BNL offered to share 4” wafer. We purchased ¼ of the wafer with the remainder being used for silicon drift detectors for.
Optical InterLinks LLC (OIL)----- GuideLink ™ Polymer Waveguide Products Multichannel Monolithic Data Network Monitoring Taps Using OIL’s Polymer Waveguide.
Thurso High School Design and Technology Tutorial Two Dice.
Orthographic Projections Mr. Johanson Technology Education Blue Mountain Middle School.
ATLAS pixel module assembly flow
Artist Portrait and Artwork
4x8 Mosaic Camera Development
Metrology and Trimming of CCD Detector Height
Grid Pix Field Simulations and precision needed for a module
Equipment for Assembly – UK Experiences
SCALE & PROPORTION.
Posing your comparative question
Department of Physics, University of Michigan
SCALE & PROPORTION.
Digital Electronics Lab 2 Instructor:
SNAP NIR Detector Packaging Development: Universal SiC Package
Here’s the flange for the robot
Creating Sheet Metal Pattern
UCSB Dicing, Wire-Bonding and Board Assembly
ISO view of pipe w/ individual EC detector installed
Op Art Directions.
Presentation transcript:

Dimensioning the focal plane (RSC centric version) C. Bebek 9 July 2003 Revised 14 July 2003

HgCdTe Rockwell HgCdTe detector material x 2048 pixels. Pixel size 18 um. Note that photoactvice pixel count is 2040 x The four-pixel wide frame is read out for monitoring. This is the black band around the periphery.

HgCdTe A top view. The HgCdTe material is bump- bonded to a giant silicon circuit, blue in the drawing. The larger overhang at the bottom is where the output transistors, output amps, and some multiplexing exists. This is where the wire bond pads are also located. The overhangs on the other three sides are probably bussing for addressing the pixels but I do not know for sure.

HgCdTe This is the top view of the Lupinno moly package developed for Rockwell. The appendage at the bottom is the ceramic riser where wire- bonds attach to carry signals to the bottom of the package. Remeber the total height of mm; this will drive the focal plane layout as we try to stack these into an array.

HgCdTe Total assembly, top view. Note that the silicon chip completely covers the moly mount face, to the accuracy I know the numbers. Fill-factor including rise 82.7%, 86.1% w/o. Wire-bonds span here.

CCD CCD pixel area has been sized to match Rockwell HgCdTe pixel area x 3512, 10.5 um pixels (matches 2048 x 2048, 18 um pixels)

CCD On the CCD silicon is the stuff to control the pixel reads. This is the dark green in the drawing. So, like the HgCdTe, there is a finite sized picture frame around the active region. Fill factor 88.8%.

CCD Here’s the Luppino HgCdTe moly mount again.

CCD CCD on Luppino mount. How did it work out so well? Not an accident. Note, for the CCD the dimensions are the ideal diced size. In actuality the dicing is not precise. There is 50 um wiggle room total in the width and still not overhang the mount. Note, I have aligned the top edges of CCD and mount. With this, the photocenter for the CCD is mm from the top and for the HgCdTe it is mm. We can deal with this if we want absolute alignment of CCD and HgCdTe pixel areas. pad edge

CCD We diverge on a detail. The CCD could be rotated 90 0 relative to the mount from the previous slide. Effects —Photocenter moves closer to the HgCdTe one by 280 um – can deal with it. —The CCD overhangs the mount by 410 um – it will turn out that the mount width is constrained. —The exposed mount height at the bottom imcreases from mm to mm.

Gridding To build a focal plane layout Want the square photoactive region centers to lay on a square grid. —Guarantees stepping stars through the left and right arrays of the f.p. is in phase with stepping through the top and bottom arrays. —Guarantees that after 90 0 rotation, no stars that were being followed not get lost in cracks. Remember biggest dimension of packaged devices is mm. Must leave some clearance for assembly. I use 1 mm in the following, but this was arbitrary and conversative. Grids below are based on mm.

Grid on F.P. TMA mm grid centered on f.p.

Populated F.P.

Why a grid, in one direction anyway? After stepping thru the bottom region, you want end up in the top region in the same relative pixel location.

If you look close —Photocenters are aligned. —CCD packages are offset from HgCdTe ones to accomplish. —1 mm gap between ceramic riser and adjacent package. —Big gaps between devices along the non-readout edges mm

Stray light

Light up the cold plate to expose all places we need to worry about that can generate stray light.

Stray light management issues As presently envisaged, all metal mounts are Au plated. So there are many reflective canyons crisscrossing the f.p. Advice sought —Is it important? —Trap light in the canyons? —Make mounts wider so there only slits between devices? —Treat non-photoactive surfaces? Also issue of exposed wire-bonds on the top side – Luppino is aware of this.