RICH WG: Introduction M.Lenti. Outlook PMs and sockets: what we have Vacuum vessel, no Neon purification Cost of aluminum disks (raw material) Cost of.

Slides:



Advertisements
Similar presentations
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
Advertisements

Background to the current problem 1. As a result of the high stresses in the bobbin due to the magnet load, the bobbin end plate needs to be increased.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Leaf Spring prototype preparation M.Lenti. Reminder Piet’s proposal: two dowels inserted into two mirror holes (vertical alignment); mirror weight as.
RICH 17 m Beam Pipe Mirrors Separate pions from muons
1 Fulvio TESSAROTTO Update on the thin RICH beam pipe project - prototypes validation and pipe production - microflanges and fixation system - the intervention.
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
Challenges and Overview From Technical Coordination 27/08/2013 -FH1.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
SPSC Questions to the 2014 NA62 Status Report 1 Beam: which is the beam structure expected in October? Which is the intensity you can reasonably expect?
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
DT1 Gas Section Debrief of 2005 activities.. The Purpose of the Debrief  Compare plan and achievements.  Analyze how the work is done ? Do we meet the.
STATUS OF THE MEG CRYOSTAT Construction status Schedule ____________________________________________________________ 04/Agust/06 F. Raffaelli, L. Delfrate.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
15 October 2013 CHANTI Status Report F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Mirra, M. Napolitano, L. Roscilli, G. Saracino Università.
E-165 (FLASH) Status 8:00am 6/13/2004. Thick Target Program Primary goal is to measure the fluorescence light output at different stages of shower development.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
1 Fulvio TESSAROTTO the new RICH beam pipe the new RICH beam pipe - pipe production, gluing and tests - measurement and removal of the old pipe - fixation.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
1 Brick Alternative Layout S.Buontempo on behalf of BAM Committee Present design (Baseline) and “minor modifications” New CS and CSS design Alternative.
Test beam setup: status report 02/03/2009 M. Alfonsi (CERN)
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
Lau and Niels, NA62 TD meeting, 17 March Complete the crane consolidation in TCC8 Reinstall front-end after alignment checks Consolidation of T10.
Introduction Straw Working group meeting CERN group 1 NA62 Collaboration meeting, Brussels 7-10/9/2010.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
General News M.Lenti. Outlook Reminder of the RICH schedule PMs and sockets: what we have Mirrors What would change for PM holding disks if vacuum inside.
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
Summary of the second Hydrogen CEDAR Safety Meeting 24 November 2008 Present: J.Gulley/ SC-GS, A.Sharma/PH-FGSO, Augusto, Cristina, Lau, Niels.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
Update on the Gas Ring Imaging Cherenkov (GRINCH) Detector for A 1 n using BigBite Todd Averett Department of Physics The College of William and Mary Williamsburg,
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
MINER A Operations Report All Experimenters’ Meeting Steve Hahn, FNAL July 1, 2013.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
FLASH Collaboration Meeting: July 2003 Spectrograph Status Etc.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
TEL62 AND TDCB UPDATE JACOPO PINZINO ROBERTO PIANDANI CERN ON BEHALF OF PISA GROUP 14/10/2015.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
BRANs Sune Jakobsen (BE-BI-PM) LHC BI 2015 summary
Status of Contributions, Draft Budget Request for 2005 and Outlook for the Longer Term Future Martyn Davenport 8 TH October 2004 CAST FRC-D
Lab tests on Mirror Support M.Lenti. Glass robustness Test if mirror glass is robust enough to be supported in a single point (single dowel approach)
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
ALCPG/GDE Meeting FNAL Global Design Effort 1 Cavity Specification Table 23 Oct 2007 FNAL Lutz Lilje DESY.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
2010/12/14 Caltech Massimo Benettoni FDIRC FBox (almost) ready for production Box design finalized (as possible) Gives precise Fblock positioning wrt guiding.
The NA62 RICH detector M.Lenti INFN Sezione di Firenze.
MEA Machine and Experiment Assembly Norbert Meyners, MEA 12. July 2007ILC IRENG07 WG-A1 LDC Engineering Design (Status) Introduction General Design Detector.
News from PNPI Presented by N. Bondar for B. Bochin Cagliari 8/10/2015.
RICH Readout Plans F. Bucci, M. Piccini on behalf of the RICH WG.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
Report on tests ongoing in Perugia
Jim Fast Pacific Northwest National Laboratory
News and Introduction from CERN June 15th, 2005
Francois and Lau EATM 17 July 2012
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
New field cage LP2 Ole Bach, Bernd Beyer, Volker Prahl
Performances of the NA62 RICH detector
TBL, Status, Plans, Experiments
Ongoing and to do work M.Lenti.
Progress of the NA62 RICH detector
Presentation transcript:

RICH WG: Introduction M.Lenti

Outlook PMs and sockets: what we have Vacuum vessel, no Neon purification Cost of aluminum disks (raw material) Cost of quartz windows Reminder of the RICH schedule: Milestones: Design for mirror support: Vessel installation ready: Mirror and PM installation complete:

Photomultipliers 579 U03 good+best (batch ) 1210 U03 good (batch 2010) 155 U03 good (batch 2011) in order  Grand total: 1944 Other available PM (not all working) 3+12 U03 normal (batch ) 3+24 U06 good+best (batch ) Grand grand total: 1986 ( ) normal: 800 V > 1×10 5 good: 800 V > 5×10 5 best: 800 V > 1×10 6

HV divider E connectorized 137 not connectorized (8 of which used by GTK test beam) 8 from very first tests (to be checked if reusable) Grand total: 585 (+8), all with 0.45 m long cables To match 1986 pm: 1401 sockets missing ( ) Costs ( units):  68 €/pz (0.45 m cables) → K€ for 1401 units  77 €/pz (1.5 or 2.0 m cables) → K€ for 1401 units  84 €/pz (2.5 m cables)  89 €/pz (3.0 m cables) 600 € shipping cost, 9 months for full delivery. Today: choose cable length for 1400 socket. My proposal: 2.0 m See also Roberto’s talk

Vacuum vessel and gas system Today we should endorse:  The RICH vessel must be vacuum proof  The Gas system must be as simple as possible: after vacuum made inside the vessel, inject pure Neon  If vessel needs to be open, previous Neon injection gets lost, new filling to be done with fresh Neon See Piet’s talk

How to plug the disks with vacuum vessel Winston Cones & Quartz Hat PM + socket vacuum neon Valve open Valve closed air

Aluminum disks Aluminum 6082-T6 (anticorodal) 6.4 €/kg Sheet 800x800x40 mm3: 70.5 kg → € Sheet 800x800x30 mm3: 53.0 kg → € 2(Winston)+2(PM)+2(hat) sheets: € (+TVA) Pre-machining by external company: few KЄ (to be quantified) Drilling (Winston cones, PM holes, etc): Firenze worshop When finished, shipped at CERN for gluing quartz windows and mylar foils: agreement with Daniel Fraissard See Fernando’s talk

Quartz windows Praezisions Glas & Optik GmbH Windows made of UV-grade Quartz Glass: - double side polished - diameter. 12.7mm (+/-0,1) - thickness 1mm (+/-0,1) - ground edge, unbeveled Cost: 4,97 €/pz → 10 k€ for 2000 pieces (= k€) 4-6 working weeks delivery time

Conclusions The RICH is on the critical path for the 2012 techical run Main critical points:  vessel,  entry/exit windows,  beam pipe,  mirror support wall (and related gadgets) To be worked hardly but less critical:  PM, HV, DAQ, Mirrors Goal: have the RICH closed and filled with gas for 2012 tech run even with some temporary solutions, ready to take data

Mail from Ferdi Dear Massimo, I believe we all agree that the change to a vacuum proof RICH vessel is a good solution. In this case, we could officially endorse this design change in the forthcoming collaboration week. ( I saw that the fact is already anticipated in the report to the SPSC, which is very good, because we are anticipating the purchasing process with the same assumption). Regarding the time scale, we have launched this week a departmental request (DR) for the vessel, which is part of the obligatory purchasing procedure at CERN. The next steps will be a notification to the Finance Committee and a Market Survey. The Market Survey requires a simplified technical spec. and qualification criteria's for potential firms, and Piet is preparing this at the moment. Assuming things go fast the duration of the purchasing process will take about 20 weeks (from DR to contract signature), which would bring us to end of August. Hoping that the fabrication can be done in 6 months, we could hope to receive the vessel in March 2012, so that it can be installed before the summer. In an optimistic scenario we could hope to install during the summer 2012, the mirror support wall, mirrors, beam pipe and some PMT's, so that the RICH could be used with some channels in the Technical Run. But, this will require that the vessel time scale is respected and that all other items are pushed forward in parallel, which seems difficult. Discussing with Piet, we expect difficulties for the vessel planning and some shortcomings, in particular, for the Al windows and the beam pipe. Therefore, I suggest that we also consider some more modest scenarios as fall back solution: 1. For my part, I would give the vessel installation in spring 12 very high priority, in addition, I believe the RICH entry window should have equal priority because it is required to close the vacuum tank at the downstream end. But, one could think to stage the mirror support wall and the RICH exit window to after the 2012, if this reveals necessary. Meaning that -during the 2012 Run- the RICH vessel would stay open at the downstream end and can, of course not be filled with gas. In that case, the beam pipe connection between the upstream window and the LKR could be a temporary pipe connections in aluminium, or even, stainless steel. The installation would then be completed during 2013, when we have no beam. 2. As alternatives there could also be intermediate scenarios, e.g. re-using the former He tank window as RICH exit window, so that the vessel could be closed. But the interfacing to the RICH vessel and to the beam pipe is then not straight forward. At this stage, I am not proposing to change the official planning, but there might be caveats, and we should see how to deal with it. Let me have your reactions... Best regards, Ferdi

Dear Ferdi, during the next collaboration meeting we will endorse officially the "vacuum proof" solution for the RICH vessel and it is a good piece of news that the purchasing process has been started. I understand that the RICH vessel is on a critical path for the 2012 technical run and I fully agree with you that any effort must be done to have it in place in proper time. I will come back to vessel related "gadgets" (windows, pipe) in a moment but first let me address "my side". I have on my hands practically all the PMs (1950) and at the moment 600 PM sockets (HV dividers): the order about the remaining 1400 sockets was delayed for some details to be addressed (cable length) and money availability; now both are solved, cable length will be endorsed during the next meeting (long cable solution...) and money are available since few days so that the purchasing process will start and by spring 2012 we will have what we need. HV channels (mainframes and HV board) are all already on my hands; DAQ boards are under project finalization and production can be started when we prefer. I don't see bottle-necks in all the readout chain for the technical run (TEL62 is another issue but it is a general problem of the collaboration). All the RICH mirrors are ready and will be shipped at CERN in these days; I will pick up them during the next meeting for full testing of geometry and optical properties and later I will bring back them at CERN for coating. The mirror support system is a critical issue as we know: I hope that during the next meeting we can endorse the "single dowel approach". All the piezo-actuators are already on my hands. What is really on the critical path is the mirror support wall but I hope that having chosen the type of support we can converge on a project (we have already seen a preliminary stage prepared by Philippe) and proceed in parallel to the vessel (the mirror wall is responsibility of INFN). Of course some temporary approach or staging of the mirror alignment system can be envisaged for the technical run if the full approach will not be mature enough. Now back to mechanics: the PM disks are under design and will be presented at the next meeting; in my view we can start the raw material purchasing process after the meeting and all the machining (drilling...) which is INFN responsibility; the final preparation process (gluing of quartz windows and mylar foils) will be done at CERN. Also here I don't see major obstacles towards 2012 run. Now back to mechanics critical issue: if the vessel itself will be late there is nothing to discuss. So I assume the vessel in place for summer The critical points are really the entry and exit windows and the pipe. It is very good to give priority to the entry window in such a way to be able to close the vacuum decay region. I would recommend to fully consider temporary solution for the exit window (old helium tank window?) and the pipe (temporary new pipe or old helium tank pipe) in the vessel design. Finally the gas system: during the next meeting we can also endorse the simplified version we discussed about (injecting fresh neon after vacuum and nothing else); for the 2012 run we can consider filling normally (i.e. neon) but in extreme case (that I don't recommend) we can also take into account the possibility of a cheaper gas at much lower pressure (to be fully studied if possible). In summary: I strongly encourage to do any effort to have the RICH closed and filled with gas and ready to take data for the 2012 run even with some temporary solutions for some of the items quoted above. Greetings My answer to ferdi