1 Datum Shifts Part II The Little Shift. 2 Matching Datums Revenge of the Shift I use GPS for all my mapping. I’m using NAD83(1986) I’m using WGS84 4.3.

Slides:



Advertisements
Similar presentations
Integration of Automated Staking and GIS. Stakeout 2 seats for stakers ArcEditor GIS Coordinator Right-of-Way Agent ArcView Manager of Engineering Dispatch.
Advertisements

Importing GPS Data Lecture 13. EasyGPS  Free software for downloading waypoints  EasyGPS ( EasyGPS  Free software for downloading.
Highlight & place your title here Highlight & write in your name here Holy Sepulcher Catholic School Grade ? Use the Student Guide to the HSS PJAS Presentation.
Large scale contour mapping of Bakken production sites
DNR Garmin Extension in ArcView: Set up Collect Data ArcView DNR Garmin.
Created by Maria Edited as demo by Mr. Towler. How can the locations and identities of different plants in Desert Garden be made available to visitors?
NR 322: Editing Spatial Data Jim Graham Fall 2008 Chapter 6.
Technical Support: (989) GIS and Mapping Procedures in ArcMap 9.x Creating an ArcMap Project Editing an ArcMap Project Printing an ArcMap Project.
Datums & Coordinate Systems
WELCOME Handouts Available Joel Cusick National Park Service Alaska Regional Office Joel Cusick National Park Service Alaska Regional.
Projections and Coordinate Systems, Continued
Preparing for the field GPS Pathfinder Office 2.80.
19 th Advanced Summer School in Regional Science Overview and more advanced directions with ArcGIS.
Module 9 Working with XY Data. Overview Geographic Datums Working with Coordinates in ArcMap Go To XY Transformations “On the Fly” Add XY Data.
LOST IN TRANSFORMATION
GPS to GIS: Top 10 GPS for GIS Skills ANDREW CAREY ELI CRAWLEY ANDREW CAREY ELI CRAWLEY.
Datums and Transformations inside GPS Software
Basic GPS Operation The concepts are similar
Introduction to ArcGIS for Environmental Scientists Module 2 – GIS Fundamentals Lecture 5 – Coordinate Systems and Map Projections.
Surveying with a GPS How to configure a GPS unit to ensure the highest accuracy.
GPS Survey Equipment GPS Trimble R6 or R8 Legs+Bipod Controller* Base Station or VRS Competencies #1-5.
Carolina North GPS Mapping of Bike Trails Team B2 (Becky and Jun)
Lecture 4 Understanding Coordinate Systems. Geographic Coordinate systems GCS Spherical Ellipsoidal Curved.
Integrating GPS and GIS: The Basics 6/19/12 Presented By: Doug Kotnik, GISP Precision Laser and Instrument.
LiDAR Data Collection Status Northwest Florida Water Management District.
Mission Planning and SP1. Outline of Session n Standards n Errors n Planning n Network Design n Adjustment.
Avoiding the Common GPS Pitfalls: “GPS Best Practices” Jay Riester Mapping Tech Support
Creating the Leased Site database This will be a database that has: Leased Site ID Parent Parcel ID Township Range Section Etc. Some Counties have the.
Coordinate systems and transformations in action Melita Kennedy and Keera Morrish.
APFO Data Distribution and Services. Bulk Data Distribution Options: –CD –DVD –LTO4 Tape (New this year) –Hard Drive Requestor has the option of using.
Constructing a GIS using unregistered aerial photos of the Cordillera de San Buenaventura, Volcanic Arc of the Central Andes Austin Baldwin GIS in Water.
ArcGIS 9 ch 9 Edited 06/14/05 1 Getting GPS Data into ArcGIS At this point, you have successfully collected, corrected, and exported your data using Pathfinder.
 Before plotting points on a graph, you first have to understand the X and Y axis.  The X and Y axis are number lines that run horizontally and vertically.
LAND USE CLASSIFICATION BY SUBHAN DANTROLIYA ( )
CHICAGO --- INDIANAPOLIS --- KANSAS CITY --- MILWAUKEE --- ST. LOUIS/ST. PETERS High-Accuracy GPS for GIS: From 1ft to 4in.
Esri UC 2014 | Technical Workshop | Coordinate systems and transformations in action Melita Kennedy and Keera Morrish.
How GPS and GIS are used to Manage Natural Resources.
Geodesy and Datums Ellipsoid and Geoid Geographic Coordinate system.
Part 2A (Today’s Part) Press and hold the small red button to turn receiver on Once the receiver acquires its position, press the page button until the.
O LLIVIER & C O New Zealand Projections Projections Workshop 2004 Basic Projection Steps NZ Transverse Mercator Projections in ArcGIS 9.0 Reprojecting.
High-Accuracy GPS for GIS: From 1ft to 4in.
Shape of the Earth, Geoid, Global Positioning System, Map Coordinate Systems, and Datums Or how you can impress your friend on a hike D. Ravat University.
1 Introduction To Geographical Data and TEISS Maps Angelique Luedeker, ITEP/TAMS Center.
Tools of the Trade GPS Communication Software GPS Mapping ProgramTarpits and Tips.
Unit Nine: Georeferenced Data In this unit… ► Data Supported by ArcGIS ► Geodesy  Datum  Coordinate Systems  Projections ► ArcGIS and Projections ►
Revolution in Earth Measurement Traditional Surveying uses benchmarks as reference points Global Positioning uses fixed GPS receivers as reference points.
All GPS ch 8 Edited 06/14/05 1 Exporting GPS Data Once you have finished correcting your data, you can export it using Pathfinder Office into a form that.
O LLIVIER & C O New Zealand Projections Projections Workshop Basic Projection Steps NZ Transverse Mercator Projections in ArcGIS 8.2 Reprojecting Images.
GPS collection Survey Grade Receivers Mapping Grade Receivers Recreational Grade Receivers Differential correction Real time CORS beacon WAAS Subscription.
Set up DNRGPS for ArcMap In Windows Explorer navigate to the folder: C: \ Program Files (x86) \ DNRGPS Locate the file named “dnrgps.exe”.
CHAPTER 7 STATISTICAL PROCESS CONTROL. THE CONCEPT The application of statistical techniques to determine whether the output of a process conforms to.
ST236 Site Calibrations with Trimble GNSS
1 Introduction To Geographical Data and TEISS Maps Angelique Luedeker, ITEP/TAMS Center.
Geo II/3 ch 4 Edited 10/14/05 1 Prior to going outside with your GPS rover to collect data for your school map, you must load a data dictionary onto your.
Project IIa GPS Jeff Houston Jeff Filson Tim Culbreth Jennifer Martin.
Daniel Cohen Matt Riggan Sam Boesch. Introduction  The five mile dam complex needs a geodatabase to keep up with modern technology when repairing features.
ArcGIS 9 ch 4 Edited 11/4/05 1 Creating and Editing Data in ArcGIS 9 Data can be created and edited manually in a GIS. Using the imagery provided for your.
Created by Maria Mendoza Towler 4B. How can the locations and identities of different plants in Desert Garden be made available to visitors?
Mapping Alta Ski Area’s Infrastructure System By Elise Morgan December 1, 2011.
Beginning Basic step-by-step demonstration for: Obtaining Basefile from CORS or local GPS web sites Using basefiles for Differential Correction of Trimble.
How to Ten Key. While learning keyboarding, you may have learned how to use the numbers row at the top of the keyboard, however if you have a lot of numbers.
Geodetic Control and Datums Where is it? How Accurately can we map it?
Review of Projections and Coordinate Systems
GIS Data Shape files, Rasters, Coordinate Systems, ArcGIS.
Reese Hirth, Geographer Midwest Regional Office, Omaha, NE (402) E X P E R I E N C E Y O U R A M E R I C A GPS in the National.
ArcGIS Remembers! And that costs you time!!!. What I did re last class Got a brand new layer called Subdivisions Got a brand new layer called Subdivisions.
Hazards Planning and Risk Management
Lecture 2 – Spatial Data Preparation
Post Processing GNSS Data
Correcting Your Data In Pathfinder Office v. 3.1
Presentation transcript:

1 Datum Shifts Part II The Little Shift

2 Matching Datums Revenge of the Shift I use GPS for all my mapping. I’m using NAD83(1986) I’m using WGS ft

3 Objective – Little Shift Test the accuracy of various GPS units Identify the NAD83-ITRF00 Shift

4 Process Export From PFO 2 “versions” of your data Assign the correct prj for ReferPT features Observe GPS Accuracy in an ArcMap dataframe relative to Survey Grade GPS Observe the on-ground relative differences between GPS in two different reference frames

5 Prior to this Presentation You occupied “Truth” Collected at least two Point Features (ReferPT) Diff. Corrected against USFS Lassen Base Station Open PFO Now

6 Export From Pathfinder Office Exported out from PFO two “versions” of the same data Once set will be BAD One set will be GOOD This was a transform, but inside Pathfinder Office

7 1: Export out as WGS84 Bad This does NOT Transform the data This is a zero transformation This Retains WGS84 or ITRF00

8 2: Export Out as NAD83 (CONUS) CORS96 Our class standard - Good Moves Data Back to NAD83 Using the Best Transform Possible

9 Datum Transform Occurred in PFO The Datum selection was switched between the 1 st and 2 nd Exports 2 nd Export was intentionally left in the reference frame of WGS84 or ITRF00 – Bad 1 st Export was done properly to line up with our GIS in NAD83– Good

10 Assign the Correct PRJ (cont) 1st Export was intentionally done wrong – Bad –Assign as UTM WGS84, Zone 10 –Name as “WGS84ReferPt” 2nd Export was done properly – Good –Assign as UTM NAD83, Zone 10 –Name Shapefile as “NAD83CORSReferPt”

11 In ArcMap Open… M:/../Data/ Exercise_Truth.mxd

12 In ArcMap Add the Poor or mis-assigned data –“WGS84ReferPt” –You get a Warning error that detects a difference –Press OK Add the Good or properly transformed shapefiles –“NAD83CORSReferPt”

13 In ArcMap Symbolize the Bad data with a Large Red Symbol Symbolize the Good data with a Large Green Symbol

14 Extra Credit The first set of data added to the data frame is being transformed into NAD83 (the datum of the data frame) using the default WGS_1984_NAD 1983_1 transform This is a “do nothing” transform Select _5 to transform the data back to NAD83 Do note, that until ArcGIS 9.2 comes out, this transform is not exact.

15 Datum Transforms thanks

16 You are here