CMWG Update Mark Soutter - Invenergy LLC WMS November 2015 Meeting.

Slides:



Advertisements
Similar presentations
March 13, 2013 ERCOT Public CRR Transaction Limits NPRR463 Implementation Update Matt Mereness ERCOT Manager Day-Ahead Market and CRR Auction.
Advertisements

Credit Updates Vanessa Spells Credit Work Group ERCOT Public
CMWG Update June WMS Meeting CMWG Update 1. CMWG (Vote) Confirmation of new Vice Chair: Greg Thurnher (Representing Luminant/TXU Energy) 2.
CRR Update Dave Maggio CMWG July 18, CMWG 7/18/ Transaction Limit Utilization Metrics Discussion on Special “One-Time” Auctions of CRRs Upcoming.
February 4, 2013 ERCOT Public ERCOT Update to CMWG NPRR463 and CARD Distribution Matt Mereness ERCOT Manager Day-Ahead Market and CRR Auction.
Congestion Revenue Rights Activity Calendar Update Donald House CMWG September 19, 2014.
1 Market Trials Congestion Revenue Rights Weekly Update May 21, 2010.
NPRR 365 Change in Resource Outage Approvals from 8 to 45 or 90 Days Woody Rickerson Director Grid Coordination
Future Ancillary Services (NPRR 667) Update March 26, 2015 TAC meeting 1.
February 7, 2013 ERCOT Public ERCOT CRR Calendar Proposal to TAC Matt Mereness ERCOT Manager Day-Ahead Market and CRR Auction.
1 WMS Report To TAC September In Brief Four Working Group Reports Four Working Group Reports One Task Force Report One Task Force Report Three.
1 NPRR 484/554 – Revisions to Congestion Revenue Rights Credit Calculations and Payments Market Call ERCOT Public July 31, 2013.
Wholesale Market Subcommittee April 12, 2012 ERCOT Dynamic Ratings Application.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee March 4, 2010.
12/4/2007 ERCOT Public INF MP Identity Management: Roles Gary Macomber.
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
Market Credit Working Group update to the Wholesale Market Subcommittee 06/03/
September 2012 Wholesale Market Subcommittee Report to Technical Advisory Committee.
MIG TF Voting Items Market Participant Notification Period (Transmission outage) – =1 Year Interconnection Date for Protocol Considerations – First Interconnection.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
March 6, 2012 ERCOT Public ERCOT CRR Update Matt Mereness ERCOT Manager Day-Ahead Market and CRR Auction.
1 Market Trials Open Market Participant Call Weekly Kick Off March 01, 2010.
MCWG Update to WMS 08/14/2013. MCWG Update to WMS General Update -July 31 st Joint MCWG/CWG Meeting Review NPRRs All operational except – NPRR 552 – Additional.
Lead from the front Texas Nodal 1 Texas Nodal Registration Kick-off Meeting Matt Mereness June 6 th, 2007.
ERCOT, Market Analysis 2013 Annual Constraint Competitiveness Test (CCT) Study Results – Update for 8/27/12 CMWG 8/27/2012 ERCOT Public.
Protocol Revision Subcommittee Tom Burke June 7, 2012.
CMWG Update WMS September 2015 Meeting. CRR Balancing Account Fund Discussion The CRR Balancing Account fund appears to be working as expected The cap.
Congestion Management Working Group WMS update 11/7/2012.
1 Market Trials Congestion Revenue Rights Weekly Update September 3, 2010.
9/17/2012 CSWG CSWG – ERCOT Update ERCOT. 2 Settlements Project & Operational Updates February 27, 2012 NPRR 347: Combined Daily Invoice –Still on track.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Settlement Invoices Business Requirements Settlements and.
Nodal Short Pay and Uplift Process CWG Meeting May 28, 2008.
CRR Update to CMWG ERCOT CRR Team Congestion Management Working Group Aug 7, 2013.
August 25, 2008 TPTF Nodal Status Report: Integrated Schedule Update Change Control Update Adam Martinez Troy Anderson.
Congestion Revenue Rights Activity Calendar Update Donald House CMWG October 23, 2015.
Market Credit Working Group Update to WMS Wed. Nov 18, 2009.
Stability Limit Management Chad Thompson Manager, Operations Support Planning Working Group Meeting ERCOT Public January 20, 2016.
Congestion Management Work Group Update WMS I Flores, S Reedy—ERCOT M Wagner--PSEG TX.
1 Market Trials Update NATF May 4, 2010.
ROS July 10, 2008 Meeting WOTF Update on ROS Action Plan Summary: EECP Step #2 (Feb.26 th, 2008) Mark Garrott WOTF Chair.
January 9, 2012 ERCOT Public ERCOT CRR Calendar Proposal to WMS Matt Mereness ERCOT Manager Day-Ahead Market and CRR Auction.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
1 Nodal Day Ahead Invoice Taskforce March 13, 2007 Presentation to COPS.
1 NPRR 484/554 Phase 2 Suresh Pabbisetty, ERP, CQF, CSQA Lead Technical Analyst, Credit CWG / MCWG May 20, 2015 ERCOT Public.
Panhandle Renewable Energy Zone (PREZ) Study
Wind Operations Task Force Overview for ROS Feb 2009 mtg: WOTF has drafted a scope for ROS to consider. WOTF recommendations for Chair & Vice Chair: Chair.
CMWG Update to WMS M Wagner Edison Mission Marketing & Trading.
PLWG Report to ROS September 4, PGRR039 PGRR requires Interconnecting Entities (IEs) to provide information for ERCOT’s resource adequacy reports,
WMS 1/9/20131 Priority Power Management, LLC Proposed Changes to Holistic Solution WMS January 9, 2013 James Z. Brazell Law Office of James Z. Brazell.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
CREZ Related Generation Interconnection Studies July 2008 Jeff Billo RPG meeting
CMWG Update to WMS Report of CMWG Meeting of
1 Project Prioritization Review May 14, Approved Revision Requests “Not Started” – Planned to Start in Future Months Revision Request Target Start.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Retail Workshop ERCOT Nodal Update October 06, 2010.
Technical Advisory Committee Presentation to the ERCOT Board of Directors May 20, 2009.
COPS JULY 2013 UPDATE TO TAC 07/02/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
PJM© Market Efficiency RTEP Proposal Window PJM TEAC 1/9/2014 – Market Efficiency Presentation.
1 Market Trials Outage Scheduling Qualifications Weekly Update March 26, 2010.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Texas Congestion Management Work Group Update For WMS Marguerite Wagner, PSEG Texas.
Wind Operations Task Force Overview for ROS Jan 2009 mtg: WOTF is continuing work on issues #1a/b/c, 1d, 3e, and 5. The WOTF makes no recommendation to.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 7, 2009.
Subsynchronous Resonance Update Jeff Billo, Senior Manager ERCOT Transmission Planning February 3, 2016 Wholesale Market Subcommittee 1ERCOT Public.
August 11, 2008 TPTF EDS Sequence and Durations Discussion Daryl Cote.
Market Trials Update NATF March 2,
ERCOT CRR Update to CMWG
TAC Report to the ERCOT Board
CRR Activity Calendar Carrie Bivens Manager, Forward Markets
Presentation transcript:

CMWG Update Mark Soutter - Invenergy LLC WMS November 2015 Meeting

CMWG Update 2016 CRR Activity Schedule Access to Data on Stability Limits -- GTLs Related to New Generation Interconnection Dynamic Ratings in Off-Peak CRR Models Multiple GTCs in the Panhandle

2016 CRR Activity Schedule Where necessary to avoid overlapping bid windows with monthly auctions, two Seq3 LTAS auctions and one Seq4 LTAS auction were pushed back by one week nd6.AnnualAuction.Seq st6.AnnualAuction.Seq st6.AnnualAuction.Seq3

2016 CRR Activity Schedule The Credit Release and Invoice Posting columns were combined: Column heading is now “Auction Invoice Posted and Credit Released On or Before This Date” The dates for both are always the same Removes extra column, making the calendar easier to read

2016 CRR Activity Schedule No substantial holiday conflicts observed st6.AnnualAuction.Seq3 only moved back by 1 week to avoid overlapping bid window with 2017.JAN.Monthly.Auction Biggest potential conflict is opening the bid window for the nd6.AnnualAuction.Seq4 auction on 1/2/2018 Falls in line with the typical Tuesday through Thursday bid window 2016 CRR Activity Schedule Endorsed by CMWG without comment

FIS Reports & Market Information Asymmetry Brad Bell of E.On brought draft NPRR/PGRR language for discussion Potential for unintended consequences relating to project confidentiality Is a standardized Executive Summary for Stability Studies the answer? ERCOT (Jeff Billo) will convene a small meeting with TSPs and IEs to explore potential solutions and bring them back to CMWG

Dynamic line ratings in Off-Peak CRR Model Luminant presented a proposal to utilize off-peak temperatures in the CRR auctions (including the LTAS and monthlies) The proposal would improve the representation of the transmission system for dynamically rated lines in the off-peak Would increase off-peak CRR availability with limited risk of over-sell Doubles computing needs to build both models Requires model to pull outages twice, bumping the schedule a day which would miss the weekly outage model load

Multiple GTCs in the Panhandle At RPG the concept was raised of multiple GTCs in the Panhandle Short Circuit Ratio and Voltage Stability could have different interfaces with different GTLs Potential item for November CMWG meeting

Questions?