1. Introduction 2. The model and experimental design 3. Space-time structure of systematic error 4. Space-time structure of forecast error 5. Error growth.

Slides:



Advertisements
Similar presentations
WALT: Know the months of the year poem. Answer questions about the months.
Advertisements

CFSv2 monthly mean forecast skill December, 2010.
Chubaka Producciones Presenta :.
Regional Rainfall Forecast maps Summary
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
Consolidated Seasonal Rainfall Guidance for Global Tropics, October 2014 Initial Conditions Issued 14 October 2014 Forecast Background – ENSO update –
Consolidated Seasonal Rainfall Guidance for Africa, July 2014 Initial Conditions Issued 14 July 2014 Forecast Background – ENSO update – Current State.
Chicas, este calendario si es pa' nosotras !!!!!.
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
ENSO Cycle: Recent Evolution, Current Status and Predictions Update prepared by Climate Prediction Center / NCEP 19 November 2012.
6/23/11 FAIS,LLC Five Apple/Inpatient Specialist Case Study Patient Volume/LOS/ Payor Source Data.
MONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAYSAT/SUN Note: You can print this template to use as a wall calendar. You can also copy the slide for any month to add.
You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation. If you’d like to change.
School Year Calendar You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation.
School Year Calendar You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation.
You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation. If you’d like to change.
2007 Monthly Calendar You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation.
MONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAYSAT/SUN Note: You can print this template to use as a wall calendar. You can also copy the slide for any month to add.
You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation. If you’d like to change.
Rongqian Yang, Ken Mitchell, Jesse Meng Impact of Different Land Models & Different Initial Land States on CFS Summer and Winter Reforecasts Acknowledgment.
Influence of intraseasonal surface wind variability on ENSO in CFS predictions Wanqiu Wang, Mingyue Chen, Arun Kumar, Yan Xue Climate Prediction Center,
Predictability of intraseasonal oscillatory modes and ENSO-monsoon relationship in NCEP CFS with reference to Indian & Pacific Ocean Shailendra Rai (PI)
EUROBRISA Workshop – Beyond seasonal forecastingBarcelona, 14 December 2010 INSTITUT CATALÀ DE CIÈNCIES DEL CLIMA Beyond seasonal forecasting F. J. Doblas-Reyes,
Rongqian Yang, Kenneth Mitchell, Jesse Meng NCEP Environmental Modeling Center (EMC) Summer and Winter Season Reforecast Experiments with the NCEP Coupled.
Progress of CTB Transition Project Team for Land Data Assimilation: Impact on CFS of: A) new land model (Noah LSM) B) new land initial conditions (from.
1.Introduction Prediction of sea-ice is not only important for shipping but also for weather as it can have a significant climatic impact. Sea-ice predictions.
11 Predictability of Monsoons in CFS V. Krishnamurthy Center for Ocean-Land-Atmosphere Studies Institute of Global Environment and Society Calverton, MD.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
Months of the Year Macarena song.
The European Heat Wave of 2003: A Modeling Study Using the NSIPP-1 AGCM. Global Modeling and Assimilation Office, NASA/GSFC Philip Pegion (1), Siegfried.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Calendar for 2011 Months of the Year with Holidays.
Scatter plot of minimum pressure and maximum azimuthal wind for Atlantic and Eastern Pacific tropical cyclones ( Hurricane Isaac 2012 [red]).
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
A high-resolution Aquarius OI SSS L4 analysis: 3-year, near-global, weekly, 0.5 degree grid Oleg Melnichenko, Peter Hacker, Nikolai Maximenko, and James.
One-year re-forecast ensembles with CCSM3.0 using initial states for 1 January and 1 July in Model: CCSM3 is a coupled climate model with state-of-the-art.
MONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAYSAT/SUN 30 June1 July2345/65/ / / / August2/32/3.
1 Summary of CFS ENSO Forecast September 2010 update Mingyue Chen, Wanqiu Wang and Arun Kumar Climate Prediction Center 1.Latest forecast of Nino3.4 index.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
1 Summary of CFS ENSO Forecast December 2010 update Mingyue Chen, Wanqiu Wang and Arun Kumar Climate Prediction Center 1.Latest forecast of Nino3.4 index.
1 Summary of CFS ENSO Forecast August 2010 update Mingyue Chen, Wanqiu Wang and Arun Kumar Climate Prediction Center 1.Latest forecast of Nino3.4 index.
Monthly mean of stream lines at 200 hPa (upper) and 850 hPa (lower) in January A track of the tropical cyclone formed in January is superimposed.
ENSO Prediction Skill in the NCEP CFS Renguang Wu Center for Ocean-Land-Atmosphere Studies Coauthors: Ben P. Kirtman (RSMAS, University of Miami) Huug.
IN THIS Slide show YOU WILL LEARN ABOUT ALL VERSIONS OF "MS OFFICE"
LONG RANGE FORECAST SW MONSOON
LONG RANGE FORECAST SW MONSOON
Calendar 2017.
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
Pine cove pit time lapse drone photos
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
13-block rotation schedule
Progress in Seasonal Forecasting at NCEP
Seasonal Predictions for South Asia
2017/18 Payment Calendar Due Date Cut-off Day 1st of every month
by Hao Ye, and George Sugihara
McDonald’s Kalender 2009.
Predictability assessment of climate predictions within the context
2300 (11PM) September 21 Blue line is meridian..
Fig. 1 The temporal correlation coefficient (TCC) skill for one-month lead DJF prediction of 2m air temperature obtained from 13 coupled models and.
McDonald’s calendar 2007.
The Transformation of A Small Company Into A Golden Legend
February 2007 Note: Source:.
Calendar Time.
McDonald’s calendar 2007.
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

1. Introduction 2. The model and experimental design 3. Space-time structure of systematic error 4. Space-time structure of forecast error 5. Error growth and predictability (Lorenz curves) 6. Summary and conclusion Predictability of NCEP Coupled Forecast System (CFS)

Fig. 1. Systematic error of ensemble mean forecasts of monthly SST with respect to the lead time over the period From top to bottom, December, March, June, and September forecast cases, respectively.

Fig months averaging systematic error of monthly ensemble mean SST over the period with respect to the lead time.

Fig months averaging systematic error of monthly ensemble mean SST over the period with respect to the 12 calendar months.

Fig. 4. Same as Fig. 1 except root-mean-square error after removing systematic error.

Fig. 5. RMS error of ensemble mean forecasts of the monthly mean NINO3, NINO4, NINO3.4 and NINO1.2 SST over the period , as a function of target month and lead month. Nino3 is defined as the spatial mean SST over 5 o S-5 o N and 170 o W-120 o W, Nino4 over 5 o S-5 o N and 90 o W-150 o W, Nino3.4 over 5 o S-5 o N and 160 o E-150 o W, and Nino1.2 over 10 o S-equator and 80 o W-90 o W, respectively.

Fig. 6. Time series of Nino 3 SST anomalies during with respect to lead time. January, April, July, October SST anomalies, respectively.

Fig months forecast error of Nino3 SST anomalies with initial conditions of all 12 calendar months. Thick solid lines denote ensemble mean and thin dashed lines denote each ensemble member.

Forecast error Each member Lorenz curve Each member Dec IC Jun IC Fig. 8. Forecast error and Lorenz curve of Nino 3.4 and Nino 1.2 SST anomalies over period. Upper panels for December initial condition case and lower for June initial conditions, respectively. Thick black line for ensemble mean forecast error and dashed grey lined for each ensemble member, and thick red line for ensemble mean Lorenz curve and dashed orange lined for ensemble members.

Fig. 9. Forecast error and Lorenz curve of Nino 3.4 and Nino 1.2 SST anomalies following to 3 segments of initial conditions over period for December initial condition. Blue denotes first segment form 9th to 13th of the month, green for second covering 19th to 23th of the month, and red for last set including the second-to-last day of the month, the last day of the month, and 1st, 2nd and 3rd days of the next month. Solid line for forecast error and dashed line for Lorenz curve, respectively.

Fig. 10. Error growth rate. NINO3.4 NINO1.2

Ensemble skill of anomalous monthly NINO indices

Forecast error and Lorenz curves: Dec IC forecast, anomalous SST anomalies