RMR Task Force Decision Points for ERCOT Technical Advisory Committee April 3, 2003.

Slides:



Advertisements
Similar presentations
Urban Transportation Council Green Guide for Roads Task Force TAC 2009 Annual Conference and Exhibition Vancouver.
Advertisements

1 TAC Report to the ERCOT Board March 21, TAC Summary 3 unanimous PRRs 3 unanimous PRRs TAC discussion regarding Board Retreat Action Items TAC.
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
2004 Congestion Costs. 2 Transmission Congestion Occurs when analysis shows a given outage of a transmission element (contingency) will result in the.
1 Generation Adequacy Task Force Report to TAC April 7, 2005.
ERCOT Load Forecast and Reserve Margin Update June 2, ERCOT Load Forecast and Reserve Margin Update June 2, 2005.
Utah Schedule 37 Update June 25, Schedule 37 Background Schedule 37 – Published rates for standard power purchase agreements with qualifying facilities.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee May 8-9, 2003.
1 Non-Transmission Alternatives to Reduce Local Congestion Costs Bill Bojorquez June 3, 2004.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
April 15, TAC Report to the ERCOT Board April 15, 2003.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
ERS Procurement Methodology 09/04/2013 ERS Workshop Presented By: ERCOT Staff.
1 How does ERCOT Review, Verify and Approve RMR Costs? (In response to questions that were asked during PRR 632 discussions) Prepared for the
ERCOT RMR Basics Ino González Supervisor, S&B Market Analysis.
May 20, TAC Report to the ERCOT Board May 20, 2003.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
NPRR514, Seasonal Generation Resource Wholesale Market Subcommittee April 12, 2013 Amanda Frazier.
PRS - RPRS Task Force Status Summary - August 14, PRS RPRS Task Force Status Summary Prepared for WMS and PRS August 2006.
Is Reactive Power Worth Anything? The sun sets on a lightless New York City – August 14th Reactive & Voltage Maintenance Joint Proposal by TexGenCo/Calpine.
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
A Strawman for Discussion by Dottie Stockstill & Greg Ramon Special ERCOT Board Meeting June 24, 2003.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
March 19, 2008 WMS WMS Procedures Review Nieves López ERCOT Market Rules.
Discussion of Reliability Must-Run (RMR) Protocol Provisions ERCOT Technical Advisory Committee November 6, 2002.
RCWG Update to WMS May 6, Real-Time Mitigation During Exceptional Fuel Events Option 3 – Increase MOC’s during Cold Weather Events When ERCOT.
December 18, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott January 6, 2015 TAC Update to RMS 1.
MIG TF Voting Items Market Participant Notification Period (Transmission outage) – =1 Year Interconnection Date for Protocol Considerations – First Interconnection.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
1 TAC Report to the ERCOT Board June 21, TAC Summary 8 PRRS 8 PRRS Withdrawal of PRR 552 Withdrawal of PRR 552 Potomac Recommendations Potomac.
Unit-Specific Bid Limits based on Modified Generic Cost.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2007.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee October 9, 2003.
1 TAC Report to the ERCOT Board February 16, 2005.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee February 2, 2006.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee December 5, 2002.
Technical Advisory Committee Presentation to the ERCOT Board of Directors March 21, 2007.
Report to TAC July In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG DSWG MCWG MCWG MWG MWG QMWG QMWG VCWG VCWG Task Forces Task.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee November 2, 2006.
Frequency Control Task Force Presentation to the ERCOT Technical Advisory Committee June 1, 2006.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee September 4, 2003.
1 TAC Report to the ERCOT Board November 14, 2006.
1 PRR #409 Voltage Support Service from Generating Resources Timeline Date Received 4/25/2003 Date Posted 4/28/2003 Comments Due 5/19/2003 PRS Review Date.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
OOMC and Local RPRS Settlement Alignment January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements.
2004 CSCs & Zones. Goals for 2004 Increase ERCOT market efficiency Reduce out-of-merit energy and capacity deployments Reduce uplift of local congestion.
1 Summary of TAC Procedures May 5, Revision of TAC Procedures Project began in October 2004 to incorporate the Commercial Operations Subcommittee.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
Jan 22, TAC Report to the ERCOT Board January 22, 2003.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
February 25, 2016 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 1, 2016 TAC Update to RMS 1.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Reliability-Must-Run (RMR) Cost Evaluation and Settlement Basis Ino González ERCOT RMR Workshop May 24, 2016.
WMS UPDATE CMWG n CMWG has completed their data collection and evaluation of congestion n Based on this evaluation WMS recommends that the same CSCs with.
Proposed Market Solution for Bates RMR Exit Strategy Frontera Power Station.
Technical Advisory Committee Presentation to the ERCOT Board of Directors April 18, 2007.
Is Reactive Power Worth Anything?
TAC Report to the ERCOT Board
Exceptional Fuel Costs in LMP
TAC Report to the ERCOT Board
Resource Cost Working Group
RMR Update November 6, /05/2002.
Load Distribution Factor Calculation for Market Applications and Studies a Presentation for NATF 9/21/ NATF 1 Texas Nodal.
Amending the Performance Framework
©2010 Pearson Education, Inc. Publishing as Prentice Hall
Presentation transcript:

RMR Task Force Decision Points for ERCOT Technical Advisory Committee April 3, 2003

Six Issues to be Resolved Criteria/Process RMR Categories Compensation Level Cost Allocation Transmission Planning Process Economic Trade-Offs

Process RMR TF provided options for the six concerns to PRS PRS reviewed and made recommendations TAC considers PRS recommendations and decides on high level options for the open issues (Decision Points) TAC decisions guide language finalization PRR returns for TAC/BOD approval in May

Decision Point Criteria/Process – Allows for multi-year contracts if significant capital expenditures required – CCGTs treated as a single unit unless separate operation possible – Qualification for RMR Applicant Applicant attestation that resource is uneconomic to remain in service Unavailable at least 180 days

Decision Point Criteria/Process – Treatment of RMR Applicant Non-selected applicant prohibited from future use unless reinstated during suspension period –ERCOT not accept schedules or bids during suspension period –ERCOT may reinstate under certain circumstances –Owner may petition PUC for reinstatement

Decision Point Criteria/Process – RMR Replacement Options ERCOT to report on cost-effective replacement options 90 days after execution If a cost-effective replacement option exists, ERCOT will establish an implementation timeline

PRS Recommendation Non-selected RMR applicant would not be prohibited from operating in the market after ERCOT rejects the application – Fits with the “Cost Plus” methodology Accept other provisions

Decision Point RMR Categories – Short-term RMR Need (180 days during off- peak season only) – Annual RMR Need

PRS Recommendation Accept both seasonal and annual RMR concepts and reflect in pricing

Decision Point Compensation Level Proposals – Short- Term Contract – Owner compensated for costs avoided by seasonal mothballing – Owner provides cost information to ERCOT

Decision Point Compensation Level Proposals – Annual Contract – Proxy Price Uses existing structure with lower payment components (Standby Price at 55% of SCGT; Change in fuel heat rate calculation)

Decision Point Compensation Level Proposals – “Cost Plus” Initial monthly payments based on estimate of eligible costs then adjusted to actual 10% Incentive Factor applied to non-fuel eligible costs Eligible Costs include labor, materials and supplies to operate the unit Eligible Costs do not include return on equity, G&A, allocated general plant, taxes, interest expense, etc. Fuel also based on estimate of cost with true-up Eliminates start-up payment

PRS Recommendation Adopt short-term pricing at cost Adopt “cost plus” methodology

Decision Points Cost Allocation – Options Available Proposal to allocate local congestion costs, including RMR, on a more local basis Continue ERCOT-wide uplift of all congestion costs, except for CSC congestion

PRS Recommendation RMR TF not to address the cost allocation issue

Resolved Issue Transmission Planning Process – Reviewed the developing ERCOT transmission planning process – Provided input concerning openness and communication – Reported to TAC ERCOT already implementing with announcement of transmission planning meetings

Issue Being Addressed Economic Trade-Offs – Reviewed RMR/OOM Pricing – Goal is to align incentives between market and OOM/RMR RMR should not be an economic alternative to OOM or the market ERCOT should not have an incentive to overly rely on RMR – RMR TF concluded OOMC needs to be addressed Evaluating proposals