Planetary Missions Division Dvk, 26 Jun 2002 Pointing scenario - presented at the SWT #10 Daily schedule Overall status/How to proceed Status of inputs.

Slides:



Advertisements
Similar presentations
How Your Research Administration Team Supports You From Start to Finish Michelle Melin-Rogovin, Manager of Research Administration Research Administration.
Advertisements

Online Postgraduate Admissions Update for Postgraduate Forum – 22 January 2010 Kate Ward.
PAGE Quick Guide to the FedRAMP Readiness Process 1 August 2014 Presented by: FedRAMP PMO
Solar System Division DVK, 10 Jul 2001 Rosetta Science Operations The planning concept - current status Detlef Koschny Space Science Department ESA/ESTEC.
Introduction to CS 491 / 2 Senior Design Project I / II Prof. Dr. H. Altay Güvenir.
Jnan B2C Features Hotel Reservation - B2C Features  Hotel Search on country, city wise  Hotel sort options  Filter search option  Hotel rates  Hotel.
Philae Science Team Meeting Venice, 30 Mar. – 1 Apr Rita Schulz - Rosetta - Mission Status.
Facilitate by: Mr. Ok Libounna Director for Financial Affair, Church World Service (CWS)
Genius online Appraisal Management System 1. Appraiser Configuration Getting Started Appraisal Management let the user to effectively conduct a users.
Comments on this template -Leave time for questions -Leave time for demonstration (at the final LRR) -Use your actual hardware in the presentation -Practice.
Minor bodies observation from Earth and space: asteroid (2867)Steins A. Coradini, M.T. Capria, F. Capaccioni, and the VIRTIS International Team.
Sources and screens applicant resumes for qualifications Other General Responsibilities: - Virtual Recruiter acts as primary point of contact to candidate,
RSOC System Testing Status - 1 RSOC System Test Concept –Covered in RO-EST-PL-5013 –Status to be presented at key system reviews (GSRR) Connectivity Tests.
Information Systems OUR MISSION: align, deliver and run IS like a business Northwestern Mutual Data Center Dave McGuffey Managed Deploy & Application Checkout.
“Joint planning” session Preliminary instrument operation & science plans of SOT/XRT/EIS for several months after the launch. Instrument checkout and Performance.
Submission doc.: IEEE /0643r0May 2008 Terry L Cole (AMD)Slide 1 WG Technical Editor’s Mid-Plenary Report (May) Date: Authors:
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
Introduction to CS Senior Design Project I / II Prof. Dr. H. Altay Güvenir.
AGS RSVP Weekly Meeting P. Pile 16 September 2004 AGS RSVP Weekly Meeting, 16 Sep 2004 AGS Project Office - status of funding, comments on RSVP
Base Plan Development Overview 2007 Transmission Summit July 31, 2007 New Orleans, Louisiana.
BUDGET INFORMATION SEMINAR IOC Meeting February 12, 2009.
SOWG # 6, 20/01/2015 ESAC Agenda  Finalization of the service 20 specifications  Test plans for the service20 at spacecraft level  Instruments.
Oregon Passenger Rail Leadership Council Meeting June 6, 2012.
Planetary Missions Division Dvk, 16 Jul 2002 Interfaces - presented at the SWT #10 To clarify the situation with interfaces, formats, etc. Summary: There.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
NAME 2004 Field Operations and Procedures NAME Special Session Field Operations Center Concept: Define requirements for, and conduct the day-to-day operations,
CHANGE CONTROL PROCESS SEPTEMBER 22, /16/2015 Purpose  a methodical approach for capturing, managing and implementing IT changes  ongoing management.
Presented to Wisconsin Department of Transportation presented by Traffic Operation Infrastructure Plan Team 3/10/08 Traffic Operation Infrastructure Plan.
DEX Publication Project OASIS PLCS TC Telecon 22 January 2008 Trine Hansen.
Solar System Division DVK, 10 Jul 2001 Rosetta Science Operations Experimenter to RSOC interfaces Detlef Koschny Space Science Department ESA/ESTEC
1/106 December 2001Rosetta SOWG Status of the Rosetta Project TestBed (PTB) P. van der Plas Modelling and Simulation Section ESA/ESTEC ESA/Estec 6 December.
1.Please pick-up a Scientific Method handout-Outbox 2.Look over the handout (it is double- sided). You will fill this in with your group as you finish.
P. Mokashi IES Team Meeting, SwRI 29 May IES (SwRI) Develop sequences (flight and EQM test) Develop tables, macros and patches if necessary Test.
DEX Publication Project OASIS PLCS TC Face to Face meeting 10 March 2008 Trine Hansen.
Run 14 RHIC Machine/Experiments Meeting 6 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
ESA UNCLASSIFIED – For Official Use HSO-OP - Solar and Planetary Missions Division Solar Orbiter Instrument Operations, Data Handling and FDIR Ignacio.
After receiving the confirmation , use the link and Login Id provided to retrieve your password.
Notes on this template You may reformat this to fit your design, but make sure you cover the information requested in this template. Presentations should.
0 Evaluation of Standards Harmonization Process for HIT Chicago, IL. January 23, 2008 HITSP Project 2008 Work Plan and Schedule Contract HHSP EC.
ULTIPRO RECRUITMENT: LISTS Prepared by Ordette Allen.
Adaptive Software Development Process Framework. Version / 21 / 2001Page Project Initiation 2.0 Adaptive Cycle Planning 5.0 Final Q/A and.
Planetary Missions Division Miguel Almeida David Frew Mehran Sarkarati RSSD/STOC A Comparison of Two Science Operations Planning Concepts Decentralized.
The road to the first E2E tests
19 May 2010, ESOC Eberhard Grün and Harald Krüger
RSOC Overview at SWT #26, 11/12 June 2009
OSIRIS Solar System Simulator
Instrument Teams to SOC Test Specifications
OSIRIS operation summary
ROSETTA SWT 27th ESOC, 2-4 December 2009
Pre-landing Orbiter Observations
<workgroup name>
OSIRIS Science Team Meeting Agay 15. – 17. November 2005
Introductory Remarks and Meeting Goals
Introduction to CS Senior Design Project I / II
Lutetia geometry and timeline
OSIRIS operation summary
Mars Swingby (MSB) information
Detlef Koschny Research and Scientific Support Department ESA/ESTEC
OSIRIS Full Team Meeting
Status of the Planning Working Group’s (PWG) Efforts
WG – Chemistry – mineralogy elemental
PM 584 Competitive Success/snaptutorial.com
PM 584 Education for Service/snaptutorial.com
Introduction to CS Senior Design Project I / II
Multi-Sectoral Nutrition Action Planning Training Module
First and last name D E P T O F L First and last name A B R Y M
Eighth Grade Science Mrs.Nelson.
Bourke properties Houston, Whitney relocation info 23/02/2019.
Drafting Group: Final Meeting Drafting Group: 1st Meeting
Presentation transcript:

Planetary Missions Division Dvk, 26 Jun 2002 Pointing scenario - presented at the SWT #10 Daily schedule Overall status/How to proceed Status of inputs Detlef Koschny and the Science Operations Team Research and Scientific Support Department ESA/ESTEC

Planetary Missions Division Dvk, 26 Jun 2002 Daily schedule  Day 1 (Th, 24 Mar 2003): CONSERT checkout and interference analysis  Day 2 (Fr, 25 Mar 2003): First pointing/slewing, switch on experiments, check experiments  Day 3 (Mo, 28 Mar 2003): Point at star fields and bright stars, co-alignment and distortion  Day 4 (Tu, 29 Mar 2003): Point at star fields and bright stars, co-alignment and distortion  Day 5 (We, 30 Mar 2003): Straylight test, 180 deg sun angle to 90 deg sun angle  Day 6 (Th, 31 Mar 2003): Straylight test, 90 deg sun angle to 45 deg sun angle  Day 7 (Fr, 01 Apr 2003): RSI operations  Day 8 (Mo, 04 Apr 2003): Straylight test, 45 deg sun angle to 20 deg sun angle  Day 9 (Tu, 05 Apr 2003): Planets, Stars and molecular clouds  Day 10 (We, 06 Apr 2003): Planets, Stars, and molecular clouds  Day 11 (Th, 07 Apr 2003): Contingency  Day 12 (Fr, 08 Apr 2003): Contingency

Planetary Missions Division Dvk, 26 Jun 2002 General status  Technical note describing the scenario in Issue Draft h. Contains  Geometry info in graphical form (tables available on Rosetta/Mission Scenario Design/Scenario library/Pointing).  Our understanding of your requests, based on SOWG input, s, etc.  Needs an estimated one more week to wrap up, convert to Master Science Plan  From your side: Prepare TC sequences – we need to fill in the names of the TC sequences (In some cases, ESOC is preparing this)!  How to proceed:  Face to face discussions (this afternoon?)  Monday I will send out the updated ITL with the Pointing Skeleton  – phone discussion to finalize it  Tuesday: Telecon RSOC-RMOC – discussion about pointing with Flight Dynamics  Finalize by 10 July, we finish Master Science Plan and send to ESOC

Planetary Missions Division Dvk, 26 Jun 2002 Status of inputs  ALICE: No formal input, only A’Hearn’s input from SOWG 1 year ago  COSIMA: No requests  CONSERT: Input on procedure level, incorporated in our skeleton – needs final comments from CONSERT  GIADA: Inputs available, TC sequence names tbd  MIDAS: Inputs from SOWG, iteration needed – provide TC sequences  MIRO: Top-level input available from SOWG, Sam to check TN and Skeleton and send updated (“English prosa”) requests  OSIRIS: Top-level input incorporated in our skeleton – Nick to fill in TC sequence names  RPC: Inputs from SOWG, iteration needed  RSI: Requirements understood, pointing requests to be formulated by SOT  ROSINA: No requests  VIRTIS: Inputs available, incorporated in our skeleton – needs brush-up from SOT and filling in of detailed TC sequences