10.March.2004, phone A.Fabich 1 Technical drawings of TT2A and adjacent galleries Detail – CDD number Overview surface, ----PDP111990001 Overview TT2/TT2A/ISR,

Slides:



Advertisements
Similar presentations
WP2: Targets Proposed Outline Work Programme Chris Densham.
Advertisements

Harold G. Kirk Brookhaven National Laboratory Targetry Plans and Status MUTAC Review FNAL March 17, 2006.
ISS, 23 September 2005E. Gschwendtner, CERN1 Beam Instrumentation at CNGS 1. Introduction 2. Layout 3. Beam Instrumentation 4. Summary.
Harold G. Kirk Brookhaven National Laboratory The MERIT High-Power Target Experiment Muon Collider Design Workshop BNL December 3-7, 2007.
Primary Target Systems for a Muon Collider / Neutrino Factory. What has the experimental effort taught us thus far. N. Simos, H. Kirk, S. Kahn, P. Thieberger,
13 March MERcury Intense Target (MERIT) Experiment Layout A.Fabich for CERN AB-ATB.
31.March.2004 C. A. Martins, CERN AB/PO 1 Analysis of the possibility of using of a ALICE/LHCb type power converter in TT2A target test by Carlos DE ALMEIDA.
NTOFF11 Experiment Beam Window Assessment Hg Jet Interaction with the 15 Tesla Field Hydrodynamic Analysis of Hg in Supply/Plenum/Jet Hg Jet Interaction.
Concept for the New Detector Chamber at the ESR Ion beam Internal Target Region  Lab *)  Flange axis Covered  range Flange size in mm A90° – 80°83°95°
MERIT review, Dec. 2005CERN AB-ATB1 CERN Installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
NFMCC Meeting - 13 March 2006 I.Efthymiopoulos, A.Fabich, CERN AB-ATB-EA1 MERcury Intense Target (MERIT) Experiment Installation Issues I. Efthymiopoulos.
2.April 2004A.Fabich, H.Kirk Summary for proposal of TT2A target test H.Kirk, A.Fabich March 2004 week 9 morning: Cryogenics,
30.July 2004A.Fabich, CERN1 Target R&D A.Fabich, CERN.
March 2006I.Efthymiopoulos, CERN1 MERcury Intense Target Experiment Installation Issues I. Efthymiopoulos – CERN, AB Dept. Thanks to: A.Fabich, H.Haseroth,
Video 7.Dec. 2004A.Fabich, CERN1 CERN P186 Video Conference Access to TT2A during PS extraction POSSIBLE, see also memo at homepage: subsystem/safety/radiation.
The MERIT experiment at the CERN PS Leo Jenner MOPC087 WEPP169 WEPP170.
16.Feb.2005MC meeting, LBNL1 CERN infrastructure A.Fabich, CERN AB-ATB All information available at
Wayne R. Meier Lawrence Livermore National Lab Per Peterson UC Berkeley Updated Heavy Ion Driver Parameters for Snowmass Point Design ARIES Meeting July.
Harold G. Kirk Brookhaven National Laboratory The High-Power Target Experiment at CERN Muon Collaboration Meeting LBNL February 16, 2005.
Harold G. Kirk Brookhaven National Laboratory The High-power Target Experiment at CERN NUFACT’04 Osaka, Japan July 27, 2004.
BINP for FAIR Yu.Shatunov Moscow May Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings.
17.March Connection to the CERN Power System of the TT2 mercury target project by Karsten KAHLE (TS-EL)
Status of the Transfer of CRYRING to FAIR MSL, 2 February 2009 Håkan Danared.
Eric Prebys USPAS, Knoxville, TN, Jan , 2014.
05/30/08J. Dunne -- SANE Collaboration Meeting 1 Beamline Status Upstream beamline –Chicane –SEM –Rasters –Girder Downstream beamline –Helium bag –Extension.
André Augustinus 10 September 2001 Common Applications to Prototype A two way learning process.
17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)
Last time we defined a crystal as a solid containing translational symmetry. The directions of translation can be used to from a unit cell. A primitive.
16th March 2005, ENG target A.Fabich, CERN AB/ATB 1 Status of the TT2A target experiment Status of the TT2A target experiment A.Fabich CERN AB/ATB ENG/BENE.
Proposal for Experiment S291: " Residual radioactivity induced by U ions - experimental investigation and longtime predictions" GSI, Darmstadt: G.Fehrenbacher,
Rad T 110 Electromagnetic Radiation. The Wave Equation Velocity = frequency x wavelength –Remember, photons all travel at the speed of light, 186,000.
W. Scandale 1 Status of UA9 Walter Scandale CERN CC09 5 th workshop on crystal channeling March 2009.
K. Riisager, TA8 ISOLDEEURONS PCC-Meeting, Mainz (Germany), April 2006 Recent highlights from ISOLDE News from the facility –Users meeting, February.
MG - IEFC meeting 22/01/20101 Linac 3 shielding S. Gilardoni, M. Giovannozzi, S. Baird, R. Brown, S. Damjanovic, T. Otto, M. Widorski, Acknowledgements:
Jürgen Florenkowski GSI, Darmstadt Agenda Annual Report Meeting EU construction ( CNI ) contract "DIRAC-PHASE-1" for the FAIR project September 26, 2006.
Installation issues - update, July 2006A.Fabich1 MERIT installation: Update July 2006 A.Fabich CERN AB-ATB July 2006.
GlueX Collaboration Meeting. Jefferson Lab. September 9 – 11, Review of Tagger System.
FP6 Design study "DIRAC secondary beams" Project "NUSTAR":Experiments with stored radioactive beams Super-FRS high-power production target has to cover.
N_TOF Technical Report INTC, CERN 21 May 2007 P. Cennini AB-ATB n_TOF Technical Coordinator Status of the old Target Removal Status of the old Target Removal.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Discussion and preliminary conclusions LIU-SPS ZS Electrostatic Septum Upgrade Review M.J. Barnes.
10/9/2007 Global Design Effort 1 Optical Matching Device Jeff Gronberg / LLNL October 9, 2007 Positron source KOM - Daresbury This work performed under.
IEEE NSS 2007 D.Kramer 1 Very High Radiation Detector for the LHC BLM System based on Secondary Electron Emission Daniel Kramer, Eva Barbara.
July 2005A.Fabich, CERN AB-ATB1 MERIT (ntof11) experiment: Diagnostics A.Fabich CERN AB-ATB July 2005.
Crystal tests in AB/ATB/EA (previously SL-EA) H.W.Atherton,C.Biino, M.Clément, N.Doble, K.Elsener, L.Gatignon, P.Grafstrom, J.B.Jeanneret, U.Uggerhoj,
6 April 2006Malika Meddahi 1 CNGS Project: primary beam 1.Project Overview 2. Proton beam line overview and status 3. Target status 4. Commissioning preparation.
1 M. Sullivan IR update IR Update M. Sullivan for the 3 rd SuperB workshop SLAC June14-16, 2006.
Working group on photon vetoes Meeting on June 7 th : 1.Status of Geant4 simulations 2.Discussion on LAV structure 3.Discussion on readout 4.News on Spaghetti.
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
S. Bettoni, R. Corsini, A. Vivoli (CERN) CLIC drive beam injector design.
Antihydrogen Workshop, June , CERN S.N.Gninenko Production of cold positronium S.N. Gninenko INR, Moscow.
Overview of Wire Compensation for the LHC Jean-Pierre Koutchouk CARE-HHH Meeting on beam-beam effects and beam-beam compensation CERN 08/28/2008.
1 NBI Rh. Jones (CERN - AB/BDI) CNGS Target Area Beam Position Monitors OUTLINE 1.Recap of Requirements & Layout 2.Monitor Candidates -Secondary.
1 NFMCC Friday Meeting January 4, 2008 Optical Diagnostic Results of MERIT Experiment at CERN HeeJin Park.
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
Linac4 BCC 14/10/2010 Linac4 Measurement and Dump Lines BCC on the Linac4 Transfer Line Status.
March 2006I.Efthymiopoulos, CERN1 MERcury Intense Target Experiment Installation Issues I. Efthymiopoulos Thanks to: A.Fabich, H.Haseroth, F.Haug, J.Lettry,
Studies at BINP Alexander Krasnov
Target R&D A.Fabich, CERN 30.July 2004 A.Fabich, CERN.
MERcury Intense Experiment Experiment Layout
Pulsed DC System Facilities
of secondary light ion beams
Pure  exposure for e/ separation
Status on the PS/SPS  MERIT (nTOF11) interface
The Proposed TT2A Target Experiment
Beam Tests of Ionization Chambers for the NuMI Neutrino Beam Monitoring System MINOS.
Luminometer Integration at IR2
Present and Future test facilities for High-intensity Targetry CERN
Beam Halo Considerations for Back Angle Running
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Presentation transcript:

10.March.2004, phone A.Fabich 1 Technical drawings of TT2A and adjacent galleries Detail – CDD number Overview surface, ----PDP Overview TT2/TT2A/ISR, ----ES TT2A deflection chamber, ----SOG

10.March.2004, phone A.Fabich 2 18kV cellule

10.March.2004, phone A.Fabich 3

10.March.2004, phone A.Fabich 4 About 60 m from target place to surface

10.March.2004, phone A.Fabich 5 Alternative: Dump D3 Placed just upstream of TT2A in TT2 –On the other side of the wall Interference with SPS running on access Longer distance to surface –esp. difficult for LN2 supply Kept in mind, but not strongly considered!

10.March.2004, phone A.Fabich 6 Power Supply Contact person/credits: Carlos DE ALMEIDA MARTINS, AB/PO Concentrates on evaluating a solution “available” at CERN: power supply Alice/LHCb 950 V, 6000 A size: ~10 m x 4 m x 3m, 15 tons installed in six pieces transformer (TRASFOR, IT), EDMS ( converter (Schneider Elec., FR), EDMS price/piece: 400 kChF (100 kChf+300 kChF) 1 Euro = 1 US-$ = 1.5 ChF for the TT2A target experiment

10.March.2004, phone A.Fabich 7 Available cellules (=expensive to install): currently investigated –Free cell available in building 269 –Still to be verified: building 193 & kV-peak current would be 154 A. Cables are not the major investment, but installation is. The low voltage line designed for about 2kA. One spare transformer is available and could be used. Another one and the converters have to be purchased or rented from Alice/LHCb (to be verified).

10.March.2004, phone A.Fabich 8 Cavitation in Liquid targets Cavitation was already “observed” at ISOLDE –Unfortunately only indirect observation by splash velocity Does it reduce the secondary particle yield? – Most probable not an issue for American design, but for facilities using “long” pulses Very simple and unique! N.Tahir, GSI Darmstadt, Germany 2D-simulation of heavy ion beam in solid targets → creation of voids predicts creation of voids of beam size within ~100 ns!

10.March.2004, phone A.Fabich 9 Interaction Efficiency measure interaction efficiency either by –Radiation monitors –Disappearance of primaries Pick-up monitor downstream of target –Appearance of secondaries total particle yield within Partly coverage of solid production angle sufficient Off-axis Detector –Simple, e.g. scintillator –radiation hard or installed far, S.Gilardoni

10.March.2004, phone A.Fabich 10 Tasks for proposal List of radio-isotopes (S.Gilardoni) Personal radiation plan nToF: contact and receiving O.K. needed question: waste management of batteries? 15 m 3 = 35 tons of hazardous waste!!!

10.March.2004, phone A.Fabich 11 Pulse list Which parameters to vary and how? –Magnetic field (0-15, 3 T) –Pulse intensity (1-20, 4 TP) –Pulse length (0.5-20, 0.5  s) –Spot size –Beam position (  5, 1 mm) Get a realistic number of pulses needed!?