STATUS UPDATE FOR CPRA January 26, 2011.  Study combines Cong. Boustany Recon with LCA Chenier Plain Effort  Cost Share Agreement signed in Jan. 2009.

Slides:



Advertisements
Similar presentations
US Army Corps of Engineers Budgeting Process
Advertisements

Restoring and protecting Louisiana’s coast January 18, 2011 CPRA Meeting David Peterson Asst. Attorney General and AG Designee to CPRA Civil Division Lands.
Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
Update on Southwest Louisiana Projects Office of Coastal Protection and Restoration.
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
GRS Update June 18, Welcome to New Team Members Addie Compton Kate Kim.
US Army Corps of Engineers BUILDING STRONG ® LOUISIANA COASTAL AREA (LCA) PROGRAM UPDATE June 16, 2010 Presented by: Bren Haase, OCPR Mark Wingate, USACE.
US Army Corps of Engineers BUILDING STRONG ® Louisiana Coastal Area Modification of Davis Pond Study Overview Governor’s Advisory Commission on Coastal.
Mid-Barataria Diversion - Status Update committed to our coast Andrew Beall Project Manager Governor’s Advisory Commission Meeting December 5, 2012.
Fiscal Year 2013 Annual Plan BRIEFING TO: COASTAL PROTECTION AND RESTORATION AUTHORITY Baton Rouge, LA January 18, 2012.
1 April 2010 TX SET Timeline Project Conceptualization 11 weeks Market Requirements 12 weeks ERCOT Requirements 12 weeks Conceptual Design 6 weeks Detail.
US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® Project Planning with the U.S. Army Corps of Engineers (USACE) Presenter Name Presenter Title.
EPA Update- Bob Judge Maine Air Quality Monitoring Committee April 18, ) NAAQS schedule 2) Budget 3) Technical Systems Audit.
Briefing to the Central Valley Flood Protection Board on Status of the FCSA July 12, 2013 Central Valley Integrated Flood Management Study.
Module 19 STEP 9 Completion of the Feasibility Study Module 19 STEP 9 Completion of the Feasibility Study Civil Works Orientation Course - FY 11.
April, 2008 Office of Coastal Restoration & Management PROJECT UPDATE Office of Coastal Restoration & Management PROJECT UPDATE.
1 Delta Levees Investment Strategy Delta Stewardship Council Central Valley Flood Protection Board Levees Workshop July 10, 2015.
Coastal Texas Protection and Restoration Project
US Army Corps of Engineers BUILDING STRONG ® North Atlantic Coast Comprehensive Study U.S. Army Corps of Engineers Coastal Storm Risk Management Planning.
1 Technological Innovations and Future Vision of Technical Support Louisiana Coastal Protection and Restoration and Mississippi Coastal Improvements Program.
Integrated Ecosystem Restoration and Hurricane Protection: Louisiana’s Comprehensive Master Plan for a Sustainable Coast.
LCA Mississippi River Hydrodynamic and Delta Management Study (MRHDMS) Carol Parsons Richards River Studies Manager Governor’s Advisory Commission on Coastal.
Module 27 Continuing Authorities Program Module 27 Continuing Authorities Program Civil Works Orientation Course - FY 11.
US Army Corps of Engineers BUILDING STRONG ® SAFCA Board Update Dan Tibbitts Senior Project Manager Common Features Levee Programs Branch Sacramento District.
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
Options for CBP Agreement and EC Membership For Principals’ Staff Committee Consideration March, 2013.
Land Building Sediment Diversion at Myrtle Grove: Evolution & Status Update Brian Vosburg Geologist Governor’s Advisory Commission Meeting August
Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009.
Morganza to the Gulf of Mexico Project State & Local Views and Path Forward Jerome Zeringue CPRA.
Oil Spill Restoration Planning – NFWF Proposal No.1 Kyle Graham Deputy Director CPRA July 17, 2013 committed to our coast.
Coastal Restoration Project Selection in Louisiana: From CWPPRA to CIAP The Challenges of Natural Resources Economics & Policy Conference New Orleans,
Increase Atchafalaya Flow to Terrebonne Governor’s Advisory Commission Meeting 7 August 2013 committed to our coast.
Briefing to the Central Valley Flood Protection Board June 28, 2013 Status of State-Led Basin-Wide Feasibility Studies.
SOUTHWEST COASTAL AND SOUTH CENTRAL PROJECTS – Update and Path Forward CPRA Meeting January 22, 2013 committed to our coast.
US Army Corps of Engineers South Atlantic Division One Corps Serving The Army and the Nation US Army Corps of Engineers South Atlantic Division One Corps.
Base Plan Development Overview 2007 Transmission Summit July 31, 2007 New Orleans, Louisiana.
Update On Mississippi River Delta Management Plan Presented at August 20, 2009, Meeting of Governor’s Advisory Commission on Coastal Protection, Restoration.
Update on the SOUTHWEST COASTAL LA Project Governor’s Advisory Commission Meeting August 7, 2013 Abbeville, LA committed to our coast.
Coastal Restoration Updates September 10, 2007 Coastal Restoration Updates September 10, 2007 Louisiana Department of Natural Resources Louisiana Department.
LCA Comprehensive Study Louisiana Coastal Area, Louisiana- Comprehensive Coastwide Ecosystem Restoration Feasibility Study.
Mississippi River Long Distance Sediment Pipeline Project Louisiana Office of Coastal Protection and Restoration Coastal Protection and Restoration Authority.
Oil Spill Restoration Planning Part 2 (RESTORE Act, Criminal, NRDA, SEPs) Kyle Graham Deputy Director CPRA May 15, 2013 committed to our coast.
BUILDING STRONG ® Mississippi River Ship Channel Gulf to Baton Rouge, LA Propeller Club for Port of New Orleans 24 September 2015.
US Army Corps of Engineers BUILDING STRONG ® NATIONAL SHORELINE MANAGEMENT STUDY: COASTAL SYSTEMS PORTFOLIO INITIATIVE (CSPI) Initiatives on a Systems.
STATUS UPDATE FOR CPRA September 21,  We are 2.5 years into the Feasibility Study  Study is being cost shared between the State and the.
Consistency with the 2012 Coastal Master Plan: Guidelines for Restoration Projects Receiving State Funding Bren Haase CPRA Board Meeting September 18,
Mitigation Directorate FEMA’s Mitigation Directorate and Hurricane Emergency Management The Mitigation Directorate supports Hurricane risk assessment and.
Fiscal Year 2009 Annual Plan: Ecosystem Restoration and Hurricane Protection in Coastal Louisiana Draft.
SDC Update June 5, SDC Update – June 2012 Investment Plans submitted to OCIO for approval – Core Network – Firewall – Storage OB2 Heat Reduction.
VISION 2020 NYC COMPREHENSIVE WATERFRONT PLAN This material was prepared for the New York State Department of State, with funds provided under Title 11.
Implementing the Master Plan Kyle Graham Deputy Executive Director CPRA June 20, 2012 committed to our coast.
LCA Program State Concerns Moving Forward February 25, 2010 Kyle Graham Governor’s Office Coastal Activities.
Maryland’s Coastal Resiliency Assessment Nicole Carlozo, MD DNR October 14, 2015 Good afternoon. I’m here today to provide some information on Maryland’s.
US Army Corps of Engineers Sacramento DistrictIntroductionIntroduction Sacramento River Bank Protection Project: Phase II Supplemental Authorization –
1 Hydraulic and Hydrologic Considerations in Planning.
2017 Coastal Master Plan Overview Karim Belhadjali
NOAA Fisheries Update MAFAC Meeting Paul Doremus DAA for Operations September 23, 2014.
1 Delta Risk Management Strategy Delta-Suisun Marsh Branch Department of Water Resources SCWC/SCWD MEETING JUNE 27, 2007.
Texas GLO & US Army Corps Join on Texas Upper Coast Storm Barrier Study.
RECREATION AUTHORITY  P.L , Section 4 of the Flood Control Act of 1944, as amended  P.L , “…require cost-sharing…”  P.L , “…est.
CPRA Program Update ACEC, New Orleans Chapter April 14th, 2016
Project Updates Louisiana Water Synergy Project May 19, 2016.
Overview of MSBA Building Process and Project Timeline
Louisiana’s Coastal Protection and Restoration Update
CPRA Program Update ACEC, New Orleans Chapter April 14th, 2016
Expert Panel on Diversion Planning and Implementation: Meeting #3
Louisiana Coastal Area
Back-End Payor Sub-Group
2023 Coastal Master plan committed to our coast
FUNDS PROVIDED TO TEXAS
Presentation transcript:

STATUS UPDATE FOR CPRA January 26, 2011

 Study combines Cong. Boustany Recon with LCA Chenier Plain Effort  Cost Share Agreement signed in Jan  Scoping meetings held in Mar  Feasibility Scoping Meeting – June 2010  Study GOAL = a Comprehensive Restoration and Protection Plan for Southwest Coastal LA

 We continue to refine the vision of the State Master Plan for Southwest Louisiana  Measure screening and evaluation is underway  Ecosystem benefits and Engineering cost for measures are being developed  H&H Modeling is underway  The Project Delivery Team meets weekly

 Measure types under consideration include:  Shoreline stabilization  Unique natural features restoration  Marsh creation/restoration  Hurricane risk reduction  Hydrologic and salinity control  The study team will combine the best performing and cost effective restoration and risk reduction measures into alternatives

 Feasibility report guidance is more risk adverse than at study initiation  Review plan changes  Sea level rise requirements  Project Management Plan may be revised once H&H modeling is complete  President’s Budget for FY 2011 does not include funds for Southwest Coastal

SCHEDULE Tentatively Selected Plan – Oct 2011 Alternative Formulation Briefing – June 2012 Draft Feasibility Report – Sept 2012 The Report will be actionable: a quality authorization document

Contact Information =