Quality Control of Ship Repair Tripartite Meeting Beijing 1 November 2005.

Slides:



Advertisements
Similar presentations
Andy Alderson – Head of RINA UK Chairman IACS EG/Coatings
Advertisements

COMPANY MAINTENANCE MANUAL
THE ROLE OF INSURANCE REQUIREMENTS WITHIN AN ORGANIZATION By Aaron Hardiman, MBA, ARM.
Services overview September 2012 l Copyright © 2011 HD Tyres (Pty) Ltd.
ASPRS 2005 Annual Conference, Baltimore, Maryland Camera Calibration, Characterization and Contracting Guidelines: An Quality Assurance Perspective U.S.
Speech by Chinese Shipbuilding Industry ( CSNAME &CANSI ) Contents 1. The acceptation of IMO PSPC standard 2. Preparation done by Chinese shipbuilding.
1 “APPROVED PARTS” PRESENTED BY DON E. GARDNER AVIATION SAFETY INSPECTOR CHARLOTTE FSDO #33 (704)
Our Services. Services Vessel Inspection 1. Sale and Purchase 2. Condition Assessment 3. Pre-charter 4. On-Hire and Off Hire.
Completion Outstanding work and Remedying Defects In order that the Works and Contractor's Documents, and each Section, shall be in the condition required.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
QLF Contract Quality Clauses Working Group QUALITY LEADERSHIP FORUM CONTRACT QUALITY CLAUSES WORKING GROUP Ken Crane MSFC September 24, 2002.
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT Defects Liability [Construction Contract Administration] Chapter 11.
Future Defence Aviation Safety Regulation Module 3 EMAR Part M – Continuing Airworthiness Requirements May 2015.
Chapter 1 Introduction. 1-1 THE CONSTRUCTION INDUSTRY construction contracting is a very competitive business with a high rate of bankruptcy. construction.
Coating Performance Standard A Review PCE - PSPC Workshop Amsterdam February 2007 Session 1.
COMPETENCY CERTIFICATION WITHIN THE INDUSTRY Hazardous Area Standardisation - A case study from Australia 3 What is Competency Competency comprises the.
FROSIO Certification system
S3: Module D Physikalisch-Technische Bundesanstalt Session 3: Conformity Assessment Module D Peter Ulbig, Harry Stolz Belgrade, 31 October.
Shop-Fabricated Tank Inspection Chris Bashor Minnesota Pollution Control Agency June, 2001.
Review of Draft AC 021 – Maintenance Contracting Draft AC 022 – Task and Shift Handovers Nie Junjian Airworthiness Inspector COSCAP-NA.
Construction Defect Mitigation Construction Cost Recovery Construction Litigation Consultants, LLC Jerry Peck Slide 1 of 12 slides / Total.
Client Name is.... Dr Lynda Speed
Tripartite Discussions 31st Oct – 1st Nov 2005, Beijing Quality control on new buildings - Role and authority of Class Speaker – Robert Smart LR IACS Council.
Cefic Workshop Good Practices for Ship Vetting Brussels 12 October 2011.
October SYS 1 Quality Audit and ISO9000 Quality Standard Kinnison, Chapter 17.
1 18 International Payments and Related Issues. Summary: 18.1 Payment Currency Clauses Mobilization and Progress Payments Insurance Issues.
Construction Materials and Workmanship. All workmanship, materials, equipment, and articles incorporated into the work are to be of the best available.
ISO 9001 – an overview Tor Stålhane IDI / NTNU. ISO 9001 and software development ISO 9001 is a general standard – equally applicable to software development.
Project Guidelines for MBA Fourth Semester Students.
Exercise 1 Tor Stålhane IDI / NTNU. Intro The strength of ISO 9001 and many other standards is that they focus on “What shall be done” and leave “How.
2.1 Reduction of GHG emissions Energy Efficiency Design Index Tripartite – September 2009 Pierre C. Sames Chairman IACS EG/ENV.
PSPC/Coating Technical File (CTF)
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
1) Complete all steps of the verification process Two webinars available on the Verification Process: Verification Process – What is involved?
Buying a Car. Objectives  Students will:  be able to find a car that fits your needs.  be able to decide whether a new or used car is right for you.
Imagination at work. David Echenberg P&W Legal Counsel November 20 th, 2015 Session II – Contract Negotiation.
Contracts Management Governance Mona El-Chami, Senior Financial Management Specialist World Bank November 2013 Tripoli, Libya.
2013 NPMA Spring Conference Value Through Professional Asset Management Subcontract Control and Liability Wayne Norman, Pam McFarland, Brandon Kriner.
KENYA NATIONAL BUREAU OF STATISTICS
Coatings Issues Tripartite Nov08. Key Developments IMO Guideline for Maintenance & Repair of Coatings SOLAS amendment for coating of cargo oil tanks of.
Intellectual Property Rights Reinhard Lüken CESA Secretary General Tripartite Beijing, 9-10 November 2008.
LAW OF BAILMENT.
Calcasieu Parish Mechanical Treatment Plant Inspection Program Calcasieu Parish Division of Planning and Development November, 2011.
YOUR KEY TO SUCCESS AS A 203K CONTRACTOR k Contractor 101 Workshop 80% OF SUCCESS …
Federal Service for Environmental, Industrial and Nuclear Supervision LEGAL REQUIREMENTS ON EXPLOSION PROTECTED EQUIPMENT FOR THE GAS AND PETROLEUM ACTIVITIES.
R equirements of I SO There are eight clauses in ISO 9001:2000.  Clause 1- Scope  Clause 2- normative reference  Clause 3 – Terms and definitions.
Wholesale Revenue Metering Standard - Hardware November 2003.
Quality Management: Mutually beneficial supplier relationships.
Tripartite Discussions 31st Oct – 1st Nov 2005, Beijing Quality control on ship repairs Speaker – Robert Smart LR IACS Council Member Agenda Item
Designed for Functionality, Engineered for Reliability 1.
REPAIR & MAINTENANCE Marina Zanne, M.Sc.
Mike Ellis Executive Director – Property + Projects
PRESENTATION TO THE PORTFOLIO COMMITTEE
JET Repair Center, Inc. FAA/JAA Certified Repair Station No. J48R410Y
Gas Regulator Inspection & Renewal Record
Sheridan RFP Proposal for the Purchase of Printers for HMC 1 & 2
What is a National Provider Identifier?
Third Party Activities for FH1 Project
ISO 9001:2015 Auditor / Registration Decision Lessons Learned
TANKER SAFETY and the ROLE of CLASS Germanischer Lloyd, Hamburg
Quality Management Systems – Requirements
Quality Control Personnel Training
Scenario 1 Three weeks ago, I bought myself a video game console. Unfortunately, it is no longer working. The box says the product carries a one-year warranty.
Minimizing risks in advance: possible contractual solutions
Quality Assurance for Emulsified Asphalt Surface Treatments
Construction Contract Administration
Prime Factors for Successful Preservation Treatments
Why is organic certification needed?
FISKERSTRAND HOLDING AS
Access to data requirementS
Presentation transcript:

Quality Control of Ship Repair Tripartite Meeting Beijing 1 November 2005

Abstract Two types of repair: 1)Planned in connection with Special Surveys, which always includes coating work and machinery overhaul, but may also include steel replacement. 2)In connection with accidents.

Quality Control Many repair yards are ISO certified. On some repair yards the ISO certificate is not worth the paper it is printed on. Use references for Q.C. Long term contracts – larger owners

Repair Contract When setting up the contract, Owners may want to include certain clauses. There is no guarantee, however, that the yard will accept the clauses.

Repair Contract

Quality Control Quality of repairs is to some degree dependent on geography. So is the price of repairs!

Quality Control - Coating Owner should have a coating inspector on-site Make sure also coating supplier representative is available.

Quality Control - Machinery Enrol specialists for specialized jobs – repair of turbochargers e.g. should not be left to the yard alone.

Quality Control - Steel Steel for replacement/repair should as far as practically be cut in a workshop, not on-site. Class should ensure that the right steel quality is used.

Quality Control Yards are entitled to delegate work to subcontractors. Yards cannot delegate the liability!

Quality Control Yards are responsible for carrying out the work. The Owner is responsible for obtaining class approval of the work!

Repair Contract Example of a clause: Steel replacement shall be carried out in accordance with IACS Recommendation 47 ”Shipbuilding and Repair Quality Standards” – Part B.

Prudent Approach ”You don’t get what you EXPECT!” ”You only get what you INSPECT!”

Thank you!