NWP Activities at INM José A. García-Moya SMNT – INM 27th EWGLAM & 12th SRNWP Meetings Ljubljana, October 2005.

Slides:



Advertisements
Similar presentations
Recent Experiences with the INM Multi-model EPS scheme García-Moya, J.A., Callado, A., Santos, C., Santos, D., Simarro, J., B Orfila. Modelling Area –
Advertisements

Page 1 NAE 4DVAR Oct 2006 © Crown copyright 2006 Mark Naylor Data Assimilation, NWP NAE 4D-Var – Testing and Issues EWGLAM/SRNWP meeting Zurich 9 th -12.
Introduction to data assimilation in meteorology Pierre Brousseau, Ludovic Auger ATMO 08,Alghero, september 2008.
COSMO-SREPS COSMO Priority Project C. Marsigli, A. Montani and T. Paccagnella ARPA-SIM, Bologna, Italy.
Meteorologisches Institut der Universität München
1 00/XXXX © Crown copyright Use of radar data in modelling at the Met Office (UK) Bruce Macpherson Mesoscale Assimilation, NWP Met Office EWGLAM / COST-717.
C ontacts: Marit Helene Jensen, Norwegian Meteorological Institute, P.O.Box 43 Blindern, N-0313 OSLO, NORWAY. HIRLAM at met.no.
Ensemble activities in COSMO C. Marsigli, A. Montani, T. Paccagnella ARPA-SIM - HydroMeteorological Service of Emilia-Romagna, Bologna, Italy.
Rapid Refresh and RTMA. RUC: AKA-Rapid Refresh A major issue is how to assimilate and use the rapidly increasing array of off-time or continuous observations.
Eidgenössisches Departement des Innern EDI Bundesamt für Meteorologie und Klimatologie MeteoSchweiz Institut für Physik der Atmosphäre On the Value of.
Verification of Numerical Weather Prediction systems employed by the Australian Bureau of Meteorology over East Antarctica during the summer season.
Global Forecast System (GFS) Model Previous called the Aviation (AVN) and Medium Range Forecast (MRF) models. Global model and 64 levels Relatively primitive.
Francesca Marcucci, Lucio Torrisi with the contribution of Valeria Montesarchio, ISMAR-CNR CNMCA, National Meteorological Center,Italy First experiments.
HIRLAM-6 plan and work MoU, Motivations, Targets Data assimilation, 3D-VAR and 4D-VAR Observation usage Parameterisation Dynamics System and embedding.
The ELDAS system implementation and output production at Météo-France Gianpaolo BALSAMO, François BOUYSSEL, Jöel NOILHAN ELDAS 2nd progress meetin – INM.
Short-Range Ensemble Prediction System at INM José A. García-Moya & Carlos Santos SMNT – INM COSMO Meeting Zurich, September 2005.
Moisture observation by a dense GPS receiver network and its assimilation to JMA Meso ‑ Scale Model Koichi Yoshimoto 1, Yoshihiro Ishikawa 1, Yoshinori.
NWP Activities at INM Bartolomé Orfila Estrada Area de Modelización - INM 28th EWGLAM & 13th SRNWP Meetings Zürich, October 2005.
Page 1© Crown copyright 2007SRNWP 8-11 October 2007, Dubrovnik SRNWP – Revised Verification Proposal Clive Wilson Presented by Terry Davies at SRNWP Meeting.
COSMO Annual Meeting September 2005 Zurich (Switzerland) Short-Range Numerical Weather Prediction Programme.
10° COSMO GENERAL MEETING Plans and State of Art at USAM/CNMCA Massimo Ferri.
How can LAMEPS * help you to make a better forecast for extreme weather Henrik Feddersen, DMI * LAMEPS =Limited-Area Model Ensemble Prediction.
Verification and Case Studies for Urban Effects in HIRLAM Numerical Weather Forecasting A. Baklanov, A. Mahura, C. Petersen, N.W. Nielsen, B. Amstrup Danish.
Data assimilation and observing systems strategies Pierre Gauthier Data Assimilation and Satellite Meteorology Division Meteorological Service of Canada.
COSMO General Meeting, Offenbach, 7 – 11 Sept Dependance of bias on initial time of forecasts 1 WG1 Overview
2nd SRNWP Workshop on Short Range EPS 7-8 April 2005, Bologna Aula Prodi Piazza San Giovanni in Monte.
COSMO-SREPS Priority Project C. Marsigli ARPA-SIM - HydroMeteorological Service of Emilia-Romagna, Bologna, Italy.
Status report from the Lead Centre for Surface Processes and Assimilation E. Rodríguez-Camino (INM) and S. Gollvik (SMHI)
LAPS __________________________________________ Analysis and nowcasting system for Finland/Scandinavia Finnish Meteorological Institute Erik Gregow.
Latest results in verification over Poland Katarzyna Starosta, Joanna Linkowska Institute of Meteorology and Water Management, Warsaw 9th COSMO General.
The latest results of verification over Poland Katarzyna Starosta Joanna Linkowska COSMO General Meeting, Cracow September 2008 Institute of Meteorology.
HIRLAM 3/4D-Var developments Nils Gustafsson, SMHI.
26 th EWGLAM & 11 th SRNWP meetings, Oslo, Norway, 4 th - 7 th October 2004 Stjepan Ivatek-Šahdan RC LACE Data Manager Croatian Meteorological and Hydrological.
Short-Range Ensemble Prediction System at INM José A. García-Moya SMNT – INM 27th EWGLAM & 12th SRNWP Meetings Ljubljana, October 2005.
An air quality information system for cities with complex terrain based on high resolution NWP Viel Ødegaard, r&d department.
Interoperability at INM Experience with the SREPS system J. A. García-Moya NWP – Spanish Met Service INM SRNWP Interoperability Workshop ECMWF –
Multi-model Short-Range Ensemble Forecasting at Spanish Met Agency (AEMET) J. A. García-Moya, A. Callado, P. Escriba, C. Santos, D. Santos, J. Simarro.
Plans for Short-Range Ensemble Forecast at INM José A. García-Moya SMNT – INM Workshop on Short Range Ensemble Forecast Madrid, October,
Kain-Fritsch/Rasch-Kristjanson in Hirlam Javier Calvo With contributions from Karl-Ivar Ivarsson & Colin Jones.
SREPS Priority Project COSMO General Meeting Cracov 2008 SREPS Priority Project: final report C. Marsigli, A. Montani, T. Paccagnella ARPA-SIM - HydroMeteorological.
Page 1© Crown copyright 2004 SRNWP Lead Centre Report on Data Assimilation 2005 for EWGLAM/SRNWP Annual Meeting October 2005, Ljubljana, Slovenia.
NOAA’s Climate Prediction Center & *Environmental Modeling Center Camp Springs, MD Impact of High-Frequency Variability of Soil Moisture on Seasonal.
Multi-model Short-Range Ensemble Forecasting at Spanish Met Institute
NWP at the Italian Weather Service: CURRENT STATUS AND PERSPECTIVES Massimo Bonavita, Lucio Torrisi, Fabrizio Ciciulla and Antonio Vocino UGM-CNMCA, Rome.
Page 1© Crown copyright 2005 Met Office Verification -status Clive Wilson, Presented by Mike Bush at EWGLAM Meeting October 8- 11, 2007.
Progress Report!for 2003 INM Operational system in use at the end of 2003 (I) The operational system is still based on HIRLAM version.
Page 1 Developments in regional DA Oct 2007 © Crown copyright 2007 Mark Naylor, Bruce Macpherson, Richard Renshaw, Gareth Dow Data Assimilation and Ensembles,
Short-Range Ensemble Prediction System at INM García-Moya, J.A., Santos, C., Escribà, P.A., Santos, D., Callado, A., Simarro, J. (NWPD, INM, SPAIN) 2nd.
1 INM’s contribution to ELDAS project E. Rodríguez and B. Navascués INM.
Vincent N. Sakwa RSMC, Nairobi
PP CONSENS Merging COSMO-LEPS and COSMO- SREPS for the short-range Chiara Marsigli, Tiziana Paccagnella, Andrea Montani ARPA-SIMC, Bologna, Italy.
10th COSMO General Meeting, Cracow, Poland Verification of COSMOGR Over Greece 10 th COSMO General Meeting Cracow, Poland.
Rapid Update Cycle-RUC. RUC A major issue is how to assimilate and use the rapidly increasing array of offtime or continuous observations (not a 00.
Status of the NWP-System & based on COSMO managed by ARPA-SIM COSMO I77 kmBCs from IFSNudgingCINECA COSMO I22.8 kmBCs from COSMO I7 Interpolated from COSMO.
WG4 Oct 2006 – Sep 2007 plans COSMO General Meeting, 21 September 2006 Pierre Eckert.
ALADIN 3DVAR at the Hungarian Meteorological Service 1 _____________________________________________________________________________________ 27th EWGLAM.
OSEs with HIRLAM and HARMONIE for EUCOS Nils Gustafsson, SMHI Sigurdur Thorsteinsson, IMO John de Vries, KNMI Roger Randriamampianina, met.no.
© Crown copyright Met Office Review topic – Impact of High-Resolution Data Assimilation Bruce Macpherson, Christoph Schraff, Claude Fischer EWGLAM, 2009.
Progress in development of HARMONIE 3D-Var and 4D-Var Contributions from Magnus Lindskog, Roger Randriamampianina, Ulf Andrae, Ole Vignes, Carlos Geijo,
SMHI operational HIRLAM EWGLAM October , OSLO Lars Meuller SMHI
met.no – SMHI experiences with ALARO
Rapid Update Cycle-RUC
COSMO Priority Project ”Quantitative Precipitation Forecasts”
Daniel Leuenberger1, Christian Keil2 and George Craig2
Status of SREPS - Sept Full two runs a day from April 2006.
Rapid Update Cycle-RUC Rapid Refresh-RR High Resolution Rapid Refresh-HRRR RTMA.
Preliminary test for the development of a 2.8km ensemble over Italy
NWP Strategy of DWD after 2006 GF XY DWD Feb-19.
SRNWP-PEPS COSMO General Meeting September 2005
Short Range Ensemble Prediction System Verification over Greece
Presentation transcript:

NWP Activities at INM José A. García-Moya SMNT – INM 27th EWGLAM & 12th SRNWP Meetings Ljubljana, October 2005

October th EWGLAM & 12th SRNWP Meetings2 Introduction Operational activities. Computer resources Hirlam as operational model. Wave model. Verification. Research in NWP: Hirlam project. Data Assimilation Coupling dynamic-physic in Hirlam Physical parameterizations SREPS

October th EWGLAM & 12th SRNWP Meetings3 Computer resources Cray X1e 15 nodes, 8 MSP’s each node 4 SSP’s each MSP 320 Gb memory 2.3 TF peak performance Official acceptance: June 2005

October th EWGLAM & 12th SRNWP Meetings4 Cray X1e MSP

October th EWGLAM & 12th SRNWP Meetings5 Hirlam operational model ONR 0.16 deg latxlon, 40 levels 72 hours forecast, 4 times a day 3DVAR BC’s from ECMWF HNR and CNN 0.05 deg latxlon, 40 levels 36 hours forecast, 4 times a day 3DVAR BC’s from ONR

October th EWGLAM & 12th SRNWP Meetings6 ONR integration area

October th EWGLAM & 12th SRNWP Meetings7 HNR – CNN integration areas

October th EWGLAM & 12th SRNWP Meetings8 Verification 2005 Standard verification against observations. Verification against Spanish High Resolution precipitation network. Monthly comparison ONR-HNR models for Spain.

October th EWGLAM & 12th SRNWP Meetings9 Geopotential June-August 2005

October th EWGLAM & 12th SRNWP Meetings10 MSLP June-August

October th EWGLAM & 12th SRNWP Meetings11 Precip. by thresholds POD-FAR

October th EWGLAM & 12th SRNWP Meetings12 Wave operational model WAM 4 for Atlantic and Mediterranean High resolution shallow water model

October th EWGLAM & 12th SRNWP Meetings13 Wave operational model

October th EWGLAM & 12th SRNWP Meetings14 High Resolution Wave operational model

October th EWGLAM & 12th SRNWP Meetings15 Hirlam Project – Data Assimilation 3DVAR in operational models. Assimilation of GPS data (TOUGH project). Test of Hirlam 4DVAR in the Cray X1e. Soil moisture analysis comparison between Hirlam reference system and 1DVAR version (ELDAS project). Mesoscale Rapid Update Cycle of analysis of surface parameters. Assimilation of VAD winds from INM radar network.

October th EWGLAM & 12th SRNWP Meetings16 Spring period: 15 April-15 May 2004 Impact of introducing 31 new GPS sites ETS and TSS show that increasing the number of GPS sites improves model precipitation. Verification with INM Climate stations (upscaled to 22km). PP thresholds (0.1, 0.3, 1., 3., 10., 30., 100. mm in 24 hours)

October th EWGLAM & 12th SRNWP Meetings17 Hirlam Project – Dynamics Different strategies of coupling dynamics-physic in Hirlam. Stability and same meteorological quality with larger time step.

October th EWGLAM & 12th SRNWP Meetings18 Hirlam Project – Physics Surface processes: Snow OI analysis. ECOCLIMAP database in Hirlam. New formulation of snow processes using two additional tiles: snow over open land Snow over forest

October th EWGLAM & 12th SRNWP Meetings19 Hirlam Project – Physics Convection: New moist scheme based on Kain-Fritsch convection and Rasch-Kristjannsson large scale implemented into the HIRLAM reference system. Forecast % more expensive and even more on vector computers (vector optimization in progress). Improvement of precipitation over Iberia.

October th EWGLAM & 12th SRNWP Meetings20 True Skill Statistic + Equitable Threat Score over Iberia (2-3 months)

October th EWGLAM & 12th SRNWP Meetings21 SREPS - Multi-model Multi-boundaries Models: Hirlam. HRM MM5 UM Boundaries ECMWF UM AVN GME

October th EWGLAM & 12th SRNWP Meetings22 Ensemble 72 hours forecast four times a day (00, 06, 12 y 18 UTC). Characteristics: 4 models. 4 boundary conditions. 4 last ensembles (HH, HH-6, HH-12, HH-18). 16 member ensemble every 6 hours Time-lagged Super-Ensemble of 64 members every 6 hours.

October th EWGLAM & 12th SRNWP Meetings23 SREPS BCs / Model AVNECMWFGMEUM HirlamXXXX HrmXXXX MM5XXXX UMOOOX

October th EWGLAM & 12th SRNWP Meetings24 Road Map Research to find best ensemble for the Short Range Jun 04 – Jun 05 Building Multimodel System Jun 05- Dec 05 Mummub n/16 members Daily run non- operational Mar 06Mummub 16/16 members Full operations Jun 06Mummub+4lag 64 members First try