Welcome to MM305 Unit 7 Seminar Dr. Bob Project Management.

Slides:



Advertisements
Similar presentations
3 Project Management PowerPoint presentation to accompany
Advertisements

WBS: Lowest level OBS: Lowest level
Project Management Projects are unique, one-time operations designed to accomplish a specific set of objectives in a limited timeframe Project managers.
Finding the Critical Path
PLANNING ENGINEERING AND PROJECT MANAGEMENT
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
3 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry Render.
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
1 Topics to cover in 2 nd part ( to p2). 2 Chapter 8 - Project Management Chapter Topics ( to p3)
PROJECT MANAGEMENT. Outline What is a “project”? Project Management Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time.
Project Scheduling Basic Approach. projectA project is a collection of tasks that must be completed in minimum time or at minimal cost. activitiesIt is.
© 2006 Prentice Hall, Inc.3 – 1 Operations Management Chapter 3 – Project Management Chapter 3 – Project Management © 2006 Prentice Hall, Inc. PowerPoint.
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
University of Mediterranean Karpasia
1 Project Management Principles ΥΠΕΥΘΥΝΟΣ: Θ. ΜΑΝΑΒΗΣ Lecture 3 – Planning and Scheduling.
Project Scheduling Basic Approach. projectA project is a collection of tasks that must be completed in minimum time or at minimal cost. activitiesIt is.
MGMT 483 Week 8 Scheduling.
Network exercise (P2) Consider the PERT/CPM network shown below. D A 2
Chapter 3 (Continued) Outline Recap CPM (continued)  Assign time estimates to each activity  Compute the longest time path through the network.
Project Management Chapter 13
Prepared by Lee Revere and John Large
Chapter 10 Project Scheduling: PERT/CPM
6. Project Management.
Project Management Techniques.
Project Scheduling Professor Stephen Lawrence Leeds School of Business University of Colorado Boulder, CO
Operations Management
Operations Management
© 2008 Prentice-Hall, Inc. Chapter 13 To accompany Quantitative Analysis for Management, Tenth Edition, by Render, Stair, and Hanna Power Point slides.
3 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 3 3 Project Management PowerPoint presentation to accompany Heizer and Render Operations.
Roberta Russell & Bernard W. Taylor, III
To accompany Quantitative Analysis for Management, 8e by Render/Stair/Hanna 13-1 © 2003 by Prentice Hall, Inc. Upper Saddle River, NJ Chapter 13.
Project Scheduling Professor Stephen Lawrence Graduate School of Business Administration University of Colorado Boulder, CO
Project Management Chapter 3 BUSI 2106 – Operations Management.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
MANA 705 DL © Sistema Universitario Ana G. Méndez, All rights reserved. W6 6.2 Operation Management Operation Management Managing Projects Techniques.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
WEEK 4 Introduction to Project Management 1. Communication Plan Objectives Objective is to determine: ◦ Who needs to know what? ◦ How will they be told?
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Lecture 09 Project Management ISE Dept.-IU Office: Room 508.
PROJECT BUDGETING The overall goal in the budgeting process of a project is to determine how much money is to be spent each week or each month. PERT /
3 - 1© 2011 Pearson Education 3 3 Managing Projects PowerPoint presentation to accompany Heizer and Render Operations Management, 10e, Global Edition Principles.
3 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall  Complex and temporary task of many related activities. (not ‘business as usual’)  May.
1 Project Management Seminar Project Scheduling. 2 Importance of Project Management Three Components of Project Management Project Evaluation and Review.
Project Management Techniques
To accompany Quantitative Analysis for Management, 7e by Render/Stair 13-1 © 2000 by Prentice Hall, Inc., Upper Saddle River, N.J Quantitative Analysis.
1 1 © 2003 Thomson  /South-Western Slide Slides Prepared by JOHN S. LOUCKS St. Edward’s University.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
1 OMGT 3123 Project Management  Project Controlling  Project Management Techniques: PERT And CPM  The Framework Of PERT And CPM  Network Diagrams And.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
OPSM 301 Operations Management Class 18: Project Management: Introduction and CPM Koç University Zeynep Aksin
Operations Management Project Management Chapter 3.
Operations and Project Management Session 3 Extra Some Additional Details on CPM and PERT.
Welcome to MM305 Unit 7 Seminar Dr. Bill Wood Project Management.
Project Management Project Controlling
Learning Objectives When you complete this chapter, you should be able to : Identify or Define: Work breakdown structure Critical path AOA and AON Networks.
Time Planning and Control Activity on Node Network (AON)
Project Management Chapter 13
Project Scheduling Chapter 14.
Projects: Critical Paths
PROJECT MANAGEMENT WITH CPM/PERT.
Time Planning and Control Activity on Node Network (AON)
Project Scheduling Network Optimization can be used as an aid in the scheduling of large complex projects that consist of many activities A project is.
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Welcome to MM 305 Unit 8 Seminar!
Prepared by Lee Revere and John Large
Time Planning and Control Activity on Node Network (AON)
General Foundry Example of PERT/CPM
Slides Prepared by JOHN LOUCKS
Presentation transcript:

Welcome to MM305 Unit 7 Seminar Dr. Bob Project Management

1.Define the project and all of its significant activities or tasks 2.Develop the relationships among the activities and decide which activities must precede others 3.Draw the network connecting all of the activities 4.Assign time and/or cost estimates to each activity 5.Compute the longest time path through the network; this is called the critical path 6.Use the network to help plan, schedule, monitor, and control the project Six Steps of PERT/CPM The critical path is important since any delay in these activities can delay the completion of the project

General Foundry Example of PERT/CPM Network for General Foundry A Build Internal Components H Inspect and Test E Build Burner C Construct Collection Stack Start F Install Control System Finish G Install Pollution Device D Pour Concrete and Install Frame B Modify Roof and Floor Figure 7.1

Activity Times In some situations, activity times are known with certainty. In many projects there is uncertainty about activity times PERT employs a probability distribution based on three time estimates for each activity A weighted average of these estimates is used for the time estimate and this is used to determine the critical path CPM assigns just one time estimate to each activity and this is used to find the critical path We will use the CPM method in this class

How to Find the Critical Path General Foundry’s network with expected activity times A2A2C2C2 H2H2E4E4 B3B3D4D4G5G5 F3F3 StartFinish Figure 13.3

How to Find the Critical Path To find the critical path, we need to determine the following for each activity in the network 1.Earliest start timeES 1.Earliest start time (ES): the earliest time an activity can begin without violation of immediate predecessor requirements 2.Earliest finish timeEF 2.Earliest finish time (EF): the earliest time at which an activity can end 3.Latest start timeLS 3.Latest start time (LS): the latest time an activity can begin without delaying the entire project 4.Latest finish timeLF 4.Latest finish time (LF): the latest time an activity can end without delaying the entire project

General Foundry’s ES, EF, LS and LF times A20202A20202 C22424C22424 H E44848E44848 B30314B30314 D43748D43748 G5 813 F StartFinish Activity Time Earliest Time Latest Time

Planning and Scheduling Project Costs: Budgeting Process The overall approach in the budgeting process of a project is to determine how much is to be spent every week or month This can be accomplished in four basic budgeting steps 1.Identify all costs associated with each of the activities then add these costs together to get one estimated cost or budget for each activity 2.In large projects, activities can be combined into larger work packages. A work package is simply a logical collection of activities. 3.Convert the budgeted cost per activity into a cost per time period by assuming that the cost of completing any activity is spent at a uniform rate over time 4.Using the ES and LS times, find out how much money should be spent during each week or month to finish the project by the date desired

QM for Windows Cost Budgeting Single Time Estimate Input Screen

QM for Windows Cost Budgeting Single Time Estimate Solved

QM for Windows Cost Budgeting Single Time Estimate Solved Chart Note the tabs

Using Technology Appendix C (Page ): Using POM-QM for Windows Appendix D (Page 307): Using Excel QM Appendix 7.1 (Page 272)