W ORK B REAKDOWN S TRUCTURE (WBS). W ORK B REAKDOWN S TRUCTURE  A method to organize the project total scope of work in a hierarchical structure where.

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

Project management software is a term covering many types of software, including scheduling, cost control and budget management, resource allocation,
Project Activity Planning
Work Breakdown Structures
Project Management 6e..
Chapter 3 Managing the Information Systems Project
Advanced Project Management - CPH
Chapter 10: Project Schedule Planning
تکنیک های تجزیه کار فرشاد آقابزرگی هوش تجاری.
Chapter 5 Project Planning
Projmgmt-1/23 DePaul University Tracking the Progress of Your Project In MicroSoft Project Instructor: David A. Lash.
Inspiring Your Next Success! ® Company Confidential - Copyright 2008 Hitachi Consulting 1 Work Plan Development Or answering the question: “So... what.
Project Time Management
Project Management Session 7
Engineering Design Development. Turner College and Career High School.
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
Project Scheduling & Budgeting CEE 402 Engineers Without Frontiers Lecture 6 February 26, 2003.
Work Breakdown Structure Workshop
PROJECT SCOPE, SCHEDULE, AND RESOURCE MANAGEMENT
Gantt Chart Engineering Design Development. Turner College and Career High School.
Chapter 5 Planning. 222 Learning Objectives  Clearly define the project objective  Develop a work breakdown structure  Develop a network diagram 
The Gantt Chart in Project Management. What is a Gantt Chart?  A type of chart that shows the Work Breakdown Structure (WBS) in terms of the start and.
Project Management and Scheduling
Planning & Scheduling Your Projects 1. Planning Elements Work Breakdown Structure (WBS) ◦Identifying the tasks and organizing them Scheduling the WBS.
Chapter 9. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
Project Management Software Tools Cheryl A. Wilhelmsen Lee Ostrom.
GANTT Charts. What is a GANTT chart? A Gantt chart is a type of bar chart that illustrates a project schedule. Gantt charts illustrate the start and finish.
Project Management Methodology Project monitoring and control.
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
Edward B. Farkas, Managing Director, Project Management Practice
Defining the Project CHAPTER FOUR PowerPoint Presentation by Charlie Cook Copyright © 2014 McGraw-Hill Education. All Rights Reserved.
BSBPMG503A Manage Project Time Manage Project Time Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
Open Workbench By Wilmer Arellano Spring Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle.
Module 6 Session 6.1 Visual 1 Module 6 Preparing the Work Breakdown Structure (WBS), Responsibility Matrix, and Master Summary Schedule Session 6.1 Preparing.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Unit Guide C ertificate IV in Project Management Qualification Code.
Work Breakdown Structure WBS
Week 6: Project Management E1102 – Design Fundamental Using Advanced Computer Technologies Spring 2010.
Chapter 5 Sem I, 2003/2004Prepared by: Jafri Mohd Rohani1 Project Planning “ If you don’t plan for the project, you are planning for failure” “ Plans act.
Define plancontrol BudgetQuality Time BUS 4017 HR. Welcome to: Project Management Week 4. Professor Fred Pentney.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Lecture4 : Project planning Lecturer: Kawther Abas 447CS – Management of Programming Projects.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 7 Project Manager’s Toolkit for Time Management.
Ch. 41 Project control. Ch. 42 Work Breakdown Structure WBS describes a break down of project goal into intermediate goals Each in turn broken down in.
Resources Performance time Project Planning Phase : Generating Tasks & Identifying Responsibilities 1.
Geog 469 GIS Workshop Project Management.
Work Breakdown Structure Kathy S. Schwaig. What is a Work Breakdown Structure (WBS)? A WBS is a logical hierarchy of work packages involved in a project.
Slide 1 Project Management Chapter 4. Slide 2 Objectives ■ Become familiar with estimation. ■ Be able to create a project workplan. ■ Become familiar.
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Unit Guide C ertificate IV in Project Management Qualification Code.
Project Schedule PLAN IT!. Project Schedule Project Schedule is based on Work Breakdown Structure (WBS) Define the WBS correctly or the Project Schedule.
GLOBAL SCHOOL OF PROJECT MANAGEMENT UNIVERSITY FOR INTERNATIONAL COOPERATION Ing. Osvaldo A. Martínez Gómez, MAP, MSc. Essential Topics - Project Management.
PRJ566 Project Planning & Management Work Breakdown Structure.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Define plancontrol BudgetQuality Time BUS 1040 Welcome to: Project Management Week 4. Professor Fred Pentney Team slogan ? Give me a “B”?
GE 121 – Engineering Design Engineering Design GE121 Managing The Design Process Part II Lecture 11B.
Microsoft Project 2010 ® Tutorial 1: Planning a Project.
SOFTWARE PROJECT MANAGEMENT
Project Schedule & Gantt Chart Unit 4 – Virtual Project.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Event Project Management By: Zhou Chunlin School of Tourism, Conference and Exhibitions Henan University of Economics and Law.
IT-301 Project Management I: Unit 4: Cost Management.
SOW / Open Workbench By Wilmer Arellano Spring 2008.
Project Management SAI’s Class. Project Management Task Cadets will create a project management plan and their project. a. Define the stages of project.
Survey Training Pack Session 17 – Budgeting and timelines for survey design and implementation.
Creating a Work Breakdown Structure with Microsoft Project.
Chapter 9 Planning. 222 Learning Objectives  clearly defining the project objective  developing a work breakdown structure  developing a network diagram.
Project Management Chapter 3.
PERT & GANTT CHARTS An Introduction.
WORK BREAKDOWN STRUCTURE
Work Breakdown Structure
Presentation transcript:

W ORK B REAKDOWN S TRUCTURE (WBS)

W ORK B REAKDOWN S TRUCTURE  A method to organize the project total scope of work in a hierarchical structure where each level represents an increased detail of the level above it.  The items at the lowest level in a WBS are referred to as Work Packages  Work packages may be further decomposed into work activities.  The WBS is used to help in project planning and control as well as to develop a common understanding of the scope of the project.

W ORK B REAKDOWN S TRUCTURE

C RITERIA FOR WBS ‡ The major components should indicate the deliverables of the project ‡ Lower level components should be measurable to allow scheduling, budgeting, and evaluating progress ‡ Breakdown must allow assignment of responsibility for work items

H OW TO BUILD A WBS Begin with the Plan, focusing on Objectives and Deliverables Break the main product(s) down into sub-products Set the structure to match how you’ll manage the project Lowest level not too detailed, not too large Identify support activities Check for completeness - is all the effort included? Develop a coding structure if needed Assign work package managers

G ANTT CHART A Gantt chart is a type of bar chart, developed by Henry Gantt, that illustrates a project schedule.bar chartHenry Ganttproject schedule Gantt charts illustrate the start and finish dates of the terminal elements and summary elements of a project.project

G ANTT C HART / B AR C HART

G ANTT CHART Gantt chart can provide following optional information too, Planned vs. actual view of the project % completion of activities Overall project progress/ status Activities on critical path