The Research of One Engine Inoperation for RNP Presented by Wang Zhong.

Slides:



Advertisements
Similar presentations
Jeffrey T. Williams Manager, RNAV & RNP Group Air Traffic Organization
Advertisements

2017/3/28 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
RNAV Procedures AIXM Procedures Seminar 1-2 Sept 2010.
Javier Perez Diestro Air Navigation International Director
PBN ICAO HQ Activities Overview
Click to edit Master text styles –Second level Third level –Fourth level »Fifth level 8/25/ A CO 2 versus noise trade-off study for the evaluation.
PBN and the Cockpit Workshop
Procedure Design Considerations
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
31st Transportation Working Group Meeting Lima, Peru August 2008 CAAC 1 New techniques and procedures CAAC’s Progress on PBN.
PROCEDURE DESIGN CRITERIA
Lecture 3: Take-off Performance
Continuous Climb Operations (CCO) Saulo Da Silva
METEOROLOGICAL INFORMATION FOR GENERAL AVIATION IN SLOVENIA.
PBN Plan Development Aviation Industry Forum 18 November 2009.
Federal Aviation Administration The Benefits and Challenges of Implementing Performance Based Navigation (PBN) Instrument Flight Procedures By: Presented.
PBN Airspace Concept Workshop ReviewReview. Review of Workshop 2 ✈ 10 day PBN Airspace Design Workshop ✈ ICAO Doc 9992: PBN in Airspace Design ✈ Plan,
Enroute Design 1 BEIJING, CHINA; 30 JUN-11 JUL 2014.
Predicting Performance
Presented to: By: Date: Federal Aviation Administration Performance Based Navigation in USA Program Status and Processes ICAO Asia and Pacific Region Performance.
Products and Services Three - Dimensional ATC Aerodrome Simulators Airline Operational Control Service (AOC) Training (ATC and Engineer) Flight Inspection.
Airline PBN Operations & Desired Entry Competency Elizabeth Bjerke University of North Dakota.
Performance Based Navigation Approval and Training
APAC PBN Seminar, Bangkok, 8-10 June 2015 The Business Aviation Perspective presented by Captain Gabriel Thomas Boyda / MJETS* representing the International.
International Training: Area Navigation Fundamentals
Performance Based Navigation Industry Forum Issues Workshop Presentation to Industry Forum 18 November 2009.
Federal Aviation Administration 0 0 Required Navigation Performance (RNP) in the United States Presentation to: US/Europe International Aviation Safety.
Introduction to PBN Seminar ICAO PBN Implementation 1.
International Training: Area Navigation Pre-flight
Property of Lear Siegler
Performance Based Navigation Aviation Industry Forum 18 November 2009.
True Performance EFB Pro. What does this presentation cover? A look at methods for calculating performance HOW & WHY OF PERFORMANCE CALCULATIONS PRODUCT.
National Transportation Safety Board Airplane Performance Daniel R. Bower, Ph.D. Airplane Performance Specialist Daniel R. Bower, Ph.D. Airplane Performance.
AABI Annual Meeting Preparing Flight Education Graduates for NextGen, ADS-B, and PBN/RNP JIM MINER E190 TRAININGSTANDARDSSUPERVISOR.
EUR Flight Planning Guidance
New Approach  Aircraft specific tables and charts See:
Note: This Performance Based Navigation (PBN) Operational Approval Handbook has been developed by CASA Australia in coordination with ICAO and.
Approval Guidance for RNP Procedures with AR February 10, 2015 Federal Aviation Administration Approval Guidance for RNP Procedures with AR C-384 Presentation.
© 2009 Aviation Supplies & Academics, Inc. All Rights Reserved. Principles of Helicopter Flight Chapter 15 Maneuvers.
Airspace Update Gatwick Airport Airspace Seminar 2016 Charles Kirwan-Taylor Director of Corporate Affairs and Sustainability 1 Tuesday, 10 May 2016.
1 Introduction of EGNOS operations: the perspective of an Air Navigation Service Provider METIS Workshop Benefits of EGNOS in Civil Aviation Istanbul 18.
PBN development in France
Performance Based Navigation The Future
Допълнение 7 на PANS-ATM (ICAO Doc 4444)
PlaneWrong AGM Thursday 13th October
Erwin Lassooij PBN Programme Manager 30 January 2014
AERONAUTICAL RADIO OF THAILAND LTD.
A case study at Gothenburg Landvetter Airport
Airline PBN Operations & Desired Entry Competency
The Norwegian PBN Implementation Plan Arne Lindberg Inspector ANS
Workshop on preparations for ANConf/12 − ASBU methodology
2018/6/11 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
Continuous Climb Operations (CCO) Saulo Da Silva
Performance Based Navigation: Navigation Specifications
Note: This Performance Based Navigation (PBN) Operational Approval Handbook has been developed by CASA Australia in coordination with ICAO.
PBN and the Cockpit Workshop
Kabul RNAV Visual & RNP-AR Process & Benefits
PBN Airspace Concept Workshop
Mr. Kevin Lam Director of Airport Infrastructure & Air Navigation
Continuous Climb Operations (CCO) Saulo Da Silva
Oceanic and International Operations
Oceanic and International Operations
Selected Performance Examples
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
Pre-Solo Training Program
Performance Based Navigation –Civil Aviation Authority Actions
PLAN for 8th PBN PD Course
PBN ICAO HQ Activities Overview
RNAV – process in Tartu How EAVA can co-operate with service providers ONE example - still in progress,,
Presentation transcript:

The Research of One Engine Inoperation for RNP Presented by Wang Zhong

Content Introduction The Criterion for EOSID RNP1’s EOSID Conclusions

Introduction CAAC ’s PBN Roadmap – Near term( ) 30% airports have the ability of PBN operations – Medium term ( ) All transport airports have the ability of PBN operations – long term ( ) Present situation –Total airports 196 –RNAV 23 –RNP APCH 59 –RNP AR 15

Special Airports

AC & Regulations Notice for designing the departure procedure of one engine inoperation (AC-FS )

Criterion for EOSID Conventional Procedure RNP AR procedures

Conventional Protection Area 45° 900m D’ D’ D D 90m 12.5% 900m Initial protection area of departure Procedure turning protection area Departure Splay Area EU-OPS Heading change<15°  600m Heading change>15°  900m

RNP AR Protection Area 90m 12.5% 2xRNP RF leg protection area 2xRNP RNP-AR 0.3  1111m

RNP1 EOSID Protection Area Fly-over Fly-by Procedure turning area constructing model Out boundary not constant RNP 1  1111m

RNP1 EOSID Turning Area Constructing Fly-over waypoint –The earliest turning point =-ATT –The latest turning point= ATT+c Fly-by waypoint –The earliest turning point =-ATT+ R*tan(A/2) –The latest turning point= ATT+c- R*tan(A/2) ATT=0.8*XTT

RNP1 EOSID Wind Model Key point: Turning area changed by the wind factor Wind: ICAO wind: 30kt RNP1 reference Doc 9905 Consider the worse wind condition

Turning Degree Wind model 15°30°45°60°75°90°105°120° ICAO wind RNP1 wind Example: Above the airport: 2000ft Instrument Air Speed : 205 kt. Bank angle : 15° Wind spiral radius RNP1>ICAO

Dazhou airport, southwest of china

14 EOSID RNP 1 SID RNP 1 SID DX801 DX402

EOSID Validation Simulator Validation –B (22k) – Max weight, max temperature – Max weight, max temperature, max crosswind. – Min weight, min temperature, max crosswind. – Min weight, min temperature, max headwind. – Max weight, min temperature, max tailwind Flight Validation

Conclusions No specification or advisory circular about the RNP 1 on EOSID in China New wind model and RNP APCH turning construction model Simulator and flight validation prove the effectiveness