Summary of the Paris SKA Meeting 4-8 September 2006 R. T. Schilizzi.

Slides:



Advertisements
Similar presentations
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
Advertisements

SKADSMTAvA A. van Ardenne SKADS Coördinator ASTRON, P.O. Box 2, 7990 AA Dwingeloo The Netherlands SKADS; The.
Lima, Peru, 5 December 2013 Smart-Cities: An EU-Wide approach Colette Maloney Head of Unit, Smart Cities and Sustainability, DG CONNECT European Commission.
The Karoo Array Telescope Adrian Tiplady v1.0, v1.1, v2.0, v2.1 …
Paul Alexander DS3 & DS3-T3 SKADS Review 2006 DS3 The Network and its Output Data Paul Alexander.
Schediwy: Advantages and Disadvantages of Sparse Aperture Arrays Fermilab: October 2009.
Chapter 10 Schedule Your Schedule. Copyright 2004 by Pearson Education, Inc. Identifying And Scheduling Tasks The schedule from the Software Development.
© 2005 by Prentice Hall Appendix 2 Automated Tools for Systems Development Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F.
Comparison of SKA Survey Speeds John D. Bunton, CSIRO TIP Figures of Merit SKA survey bandwidth can be large e.g. HI for redshifts up to 4. Thus it is.
SKA South Africa Overview Thomas Kusel MeerKAT System Engineering Manager April 2011.
Rational Unified Process
Software Project Transition Planning
Dominion Radio Astrophysical Observatory DVA-1 Reflector Development Timeline Gary Hovey NRC-HIA Dominion Radio Astrophysical Observaotry.
National Astronomy and Ionosphere Center © Germán Cortés M 2008 SKA TDP Antenna Optics By Germán Cortés M. Cornell University Ithaca NY 14853, USA National.
Name1 SKA(DS) System Design Aspects 4 th SKADS Workshop, Lisbon, 2-3 October 2008 SKA(DS) System Design Aspects: building a system Laurens Bakker.
Waste Select Committee 6 June Introduction 1 Waste Select Committee Report - Recycling In Norwich: 25 th January Recommendations endorsed.
This project is funded by the EUAnd implemented by a consortium led by MWH Logical Framework and Indicators.
Appendix 2 Automated Tools for Systems Development © 2006 ITT Educational Services Inc. SE350 System Analysis for Software Engineers: Unit 2 Slide 1.
Ian McCrea STFC Rutherford Appleton Laboratory Chilton, Oxfordshire, UK On behalf of the EISCAT_3D Project Consortium.
Steve Torchinsky SKADS Science Overview Lisbon 2007 Jan 12 SKADS Science Overview.
DVA Series Work Flow P. Dewdney Apr 15, SPDO DVP Work Flow 2 DVA-1 CPG.
SKA Introduction Jan Geralt Bij de Vaate Andrew Faulkner, Andre Gunst, Peter Hall.
SKA – The Reference Design Peter Hall SKA International Project Engineer, ISPO Next-Generation Correlators Workshop Groningen, June.
Road to MeerKAT KAT-7 DBE Alan Langman. meerKAT Overview Objectives of meerKAT Location Location Location MeerKAT Engineering Specification Prototypes.
Transition from SKADS to PrepSKA Richard Schilizzi Lisbon, 3 October 2008.
Rosie Bolton1 SKADS Costing work 4 th SKADS Workshop, Lisbon, 2-3 October 2008 SKADS Costing work: Spreadsheets to scalable designs Rosie Bolton Dominic.
BIS3324 Group Assignment – Schedule, guideline & templates (2015-Jan Semester)
3rd September 2006SKADS Workshop 2006Mike Garrett 1 DS2 - Science & Data Simulations Mike Garrett (JIVE)
Paul Alexander & Jaap BregmanProcessing challenge SKADS Wide-field workshop SKA Data Flow and Processing – a key SKA design driver Paul Alexander and Jaap.
CRISP & SKA WP19 Status. Overview Staffing SKA Preconstruction phase Tiered Data Delivery Infrastructure Prototype deployment.
EVLBI and the Australian SKA Pathfinder (ASKAP) Prof. Steven Tingay Curtin University of Technology Perth, Australia 7th eVLBI workshop SHAO, 2008 June.
Rosie Bolton SKADS Workshop April 10th 2008 SKADS Costing work: beyond the benchmark scenario Rosie Bolton Paul Alexander, Andy Faulkner and SKADS Costing.
2 nd convergence workshop: introduction R. T. Schilizzi Penticton 22 July 2004.
SKA System Design Kobus Cloete 9 December 2010 AAVP Workshop "Exploring the Universe with the world's largest radio telescope"
INGAS SPA2 Meeting, Regensburg, October 13 th 2011 INGAS INtegrated GAS Powertrain 1 SPA2 Meeting Regensburg, Month 37, Turbo DI CNG Engine Alois Fürhapter,
SKA Dishes, CSIRO February 2013 SKA Dish Verification Antenna #1 Gary Hovey Astronomy Technology Program – Penticton 12 February 2013.
Andrew Faulkner 2 nd SKADS Workshop October 2007 SKADS Benchmark Scenario Andrew Faulkner.
Peter Wilkinson1 Conclusions 4 th SKADS Workshop, Lisbon, 2-3 October 2008 SKADS aims to –Demonstrate SKA Scientific Viability and Readiness –Demonstrate.
Peter Wilkinson SKADS Workshop: Paris 10 October nd SKADS Workshop: Introduction “What is it about?” Peter Wilkinson University of Manchester.
Experts in numerical algorithms and High Performance Computing services Challenges of the exponential increase in data Andrew Jones March 2010 SOS14.
MeerKAT DBE Past Present Future Alan Langman 28 September 2009.
Arecibo Frontiers – 12 Sep Beyond the Frontiers: The Road From Arecibo to The Radio Synoptic Survey Telescope (RSST) Steven T. Myers National Radio.
1 - RAP-11/17/08 SSEC Agenda Suggestions Preparations for SSEC2 at Cape Town Bob Preston.
Director’s update CSIRO Astronomy and Space Science Lewis Ball CASS Chief 11 June 2013.
Australian SKA Pathfinder (ASKAP) David R DeBoer ATNF Assistant Director ASKAP Theme Leader 06 November 2007.
The Allen Telescope Array Douglas Bock Radio Astronomy Laboratory University of California, Berkeley Socorro, August 23, 2001.
Topic 6 Managing stage boundaries
The SKA: Next Week, the Next 3 Years & Beyond Jim Cordes, Cornell University 24 August 01  Concepts  Science Goals & Payoffs  Configurations, Modes.
Paul Alexander 2 nd SKADS Workshop October 2007 SKA and SKADS Costing The Future Paul Alexander Andrew Faulkner, Rosie Bolton.
Galileo Mission Consolidation & Maritime Needs December 18 th GISS, Brussels Status of Galileo Mission High Level Documents.
Developing Technology for Inertial Fusion Energy David H. Crandall Advisor to the Under Secretary for Science On National Security and Inertial Fusion.
Rosie Bolton 2 nd SKADS Workshop October 2007 SKADS System Design and Costing: Update and next steps Rosie Bolton University of Cambridge.
Rick PerleyEVLA Phase II Definition Meeting Aug 23 – 25, The Expanded Very Large Array Phase II Baseline Plan and Constraints.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
GEO Work Programme 2016 WGISS#40 HARWELL (UKSA) 28 SEP - 02 OCT 2015 MIRKO ALBANI, ESA.
Square Kilometre Array eInfrastructure: Requirements, Planning, Future Directions Duncan Hall SPDO Software and Computing EGEE 2009.
CHANGE READINESS ASSESSMENT Measuring stakeholder engagement and attitude to change.
Impact Research 1 Deploying Wireless LANs for Business Benefit Summary Document.
Torbay Council Partnerships Review August PricewaterhouseCoopers LLP Date Page 2 Torbay Council Partnerships Background The Audit Commission defines.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Doc.: IEEE Submission March 2007 Bruce A Bosco, Motorola Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
6 May 2009Lynn Baker AWG Meeting LA1 TDP Antenna and Feed Plan Lynn Baker Antenna Working Group Meeting Los Angeles, CA May 6, 2009.
Appendix 2 Automated Tools for Systems Development
Mid Frequency Aperture Arrays
Proposals and Progress Reports
Business System Development
Aperture Array Station Processing
SKADS White Paper - Technologies -
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
A High Intensity Neutrino Oscillation Facility in Europe
Presentation transcript:

Summary of the Paris SKA Meeting 4-8 September 2006 R. T. Schilizzi

science drivers engineering solutions cost (area, frequency range, FoV, baseline length) funding timeline governance operations impact on the community Main issues for the SKA project

science drivers engineering solutions cost (area, frequency range, FoV, baseline length) funding timeline governance operations impact on the community Main issues for the SKA project = discussed in Paris

What did we do? n SKADS day, impressive range of topics n Information exchange and discussion on Pathfinders and SKADS: status, issues, timeline n EWG Task Force meetings n Reference Design revisited n Magnificent Memos and science-engineering trade-offs n Phase 1 science and engineering issues n Discovery Space; uniqueness and complementarity of science case n Operational issues

What have we achieved? n Preliminary system design documents (170 pages) – major achievement n Pathfinder updates and review n Preparation for Concept Design Review in Jan 08 n Magnificent Memos Must have frequency range MHz Must have long baselines at ν < 1 GHz Multiple simultaneous FoV – no strong science driver (yet) Transient buffer – no immediate hurry to implement Revisit question of filling factor of central core at all frequencies Re-examine fraction of total collecting area on long baselines Optimize survey speed as function of frequency instead of separate optimizations for Aeff, Ω, Tsys (new Memo to be written by SWG)

Reference design n Was taken apart and put back together again Present RD: ambitious with fallbacks Alternative RD: low-risk with enhancements (low-risk = “super-LOFAR” + SD with single pixel feeds) n Recognized that AA and SD-PAF are both on the “innovation path” and need rapid demonstration n Engineers feel present RD is OK if roll-out staged Roll-out could be via low-risk path assuming science limitations are acceptable n Dont have to decide now, but need to have a coherent story for Concept Design Review and US decadal review submission n Recognized differences in EU and US approaches to presenting major projects for funding n Innovation is an important motivator for engineers But so are short timelines!

SKA development n SKA can be built up in stages, in terms of numbers of collectors and baselines, but also survey speed and frequency coverage - need science “ killer-apps ” to drive each stage n Each build stage should be forward compatible – with minimum throw-away n We already “ know ” : Dishes will be part of the solution (40 years experience in high DR imaging) At the low frequency end, aperture arrays will be the most cost-effective solution. n Phased array technology is too great a science multiplier to throw away at this stage

Phase 1 One of the hot topics of the meeting! n “Flagship” science from Phase 1 only if it has Aeff/Tsys = 2000 TBD survey speed 70 MHz<v<3(10?) GHz full FoV down to arcsec resolution Further discussion needed. n Phase 1 configuration: central core + 50 km comprising small dishes ( m 2 AA in the core as next step after EMBRACE?) n Quick return science as input for further funding for full array? n SKA-P1 is an important technology innovation platform n Design could change based on the P-1 experience

Beyond Phase 1 n Is science from “low risk” design a sufficient step forward? (SWG to investigate) n “Strawman” science OK (Aeff/Tsys = ) if increase fraction of collecting area in core, but still keep maximum baseline at >= 3000 km Possible stages of development n Stage1 (2014): 10% SKA, core + 50 km baselines, v<10 GHz n Stage 2 (2020): Aeff/Tsys = 10000, v =3000km n Stage 3 (date?): increase collecting area on long baselines, include high frequencies

Reference Design Cost n Current estimate: 2 B€ in component costs n Needs to be reduced to 800 M€ to meet target cost of 1.3 B€ for an operational array n Cost estimation via ISPO, SKADS, KAT, TDP crucial to engineering decisions and top-level science decisions

Hot issues for SKA operations n A year in the life of the SKA n SKA culture – program or user facility n Power consumption (Mr Fusion) a major issue even for 100 km baselines Need to include decisions on operational issues in overall timeline

Going forward n Phase 1 science case ongoing n Science simulations ongoing n SKADS, pathfinders – key results needed by end-07 n Cost estimates crucial n Risk analysis needed n Update timeline diagram n Work breakdown structure for the complete project adopted as a means of increasing internal and external coherence with entries for SKADS, the Pathfinder projects, and the US Technology Development Program n Operational issues now part of SWG and EWG as well n Next SWG-EWG-OWG gathering is planned in October 2007 in Manchester