Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 Timing Outline System Concept Review Requirements.

Slides:



Advertisements
Similar presentations
XFEL 2D Pixel Clock and Control System Train Builder Meeting, DESY 18 February 2010 Martin Postranecky, Matt Warren, Matthew Wing.
Advertisements

01/11/2002SNS Software Final Design Review1 V123S Event Link Encoder, Transmission System and PLL Receiver Thomas M. Kerner (BNL) SNS Global Controls.
Stephanie Allison LCLS Event System 14 June LCLS Event System Outline HW Block Diagram Timing Requirements Time Lines EVG.
Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21,
Stephanie Allison/John Dusatko EPICS Collaboration Meeting May 1, Timing and Event System for the LCLS Electron Accelerator*
Ernest Williams FAC November 2008 Control Systems Software Section 1 Controls System Installation Status Ernest Williams for Controls Department.
Stephanie Allison Integration with the SLC Control April 7, 2005 Introduction PNET Receiver VME Module SLC-Aware IOC Existing.
Stephanie Allison Facility Advisory Committee Meeting Apr 16, 2007 Timing and Event System S. Allison, M. Browne, B. Dalesio, J.
Stephanie Allison LCLS Integration with SLC October 12, 2004 Integration with SLC LCLS Facility Advisory Committee Oct 12, 2004 Introduction.
Dayle Kotturi LCLS Diagnostics and Commissioning Workshop September 23, 2004 LCLS Controls and Data Acquisition September 23, 2004.
Stephanie Allison Integration with the SLC Control Oct 27, Introduction Demo SLC-Aware IOC Plans for Next 12 Months.
SNS Integrated Control System SNS Machine Protection System EPICS Workshop April 27, 2005 Coles Sibley.
Dayle Kotturi Facility Advisory Committee Meeting October 12, 2004 Injector/Linac Controls An overview of the status of each of.
Ron Akre, Dayle Kotturi LCLS LLRF April 16, 2007 Linac.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
Patrick Krejcik LCLS November 11-12, 2008 SLAC National Accelerator Laboratory 1 Post-commissioning Controls Enhancements.
Data Acquisition and Control Systems HYTEC ELECTRONICS LIMITED Motor Control and Power Drive Support Graham Cross.
ICS – Software Engineering Group 1 SNS Power Supply Control Sheng Peng.
28 June 2004 ATLAS SCT/Pixel TIM FDR/PRR Martin Postranecky TIM OVERVIEW1 ATLAS SCT/Pixel TIM FDR/PRR 28 June 2004 Physics & Astronomy HEP Electronics.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
Overview of SINAP Timing System Electronics Group Beam Diagnostics & Control Division SINAP.
SNS Integrated Control System SNS Timing Master LA-UR Eric Bjorklund.
LCLS Timing Software and Plan 1 Controls Timing Workshop EPICS Collaboration Meeting SLAC LCLS Timing Software and Plan April Kukhee Kim.
Dayle Kotturi Lehman Review May 10-12, 2005 Low Level RF Outline Scope Local feedback loop requirements Solutions Costs How this.
John Dusatko 2012 EPICS Timing Workshop The SLAC Timing System April 24, The Accelerator Timing System at SLAC: Experiences, Ideas & Future Plans.
Micro-Research Finland Oy Timing System Developments Jukka Pietarinen EPICS Collaboration Meeting Shanghai March 2008.
LCLS-II Linac LLRF Control System – L2, L3 Zheqiao Geng Preliminary Design Review May 7, 2012.
Micro-Research Finland Oy Timing System Modules Jukka Pietarinen EPICS Collaboration Meeting, Argonne, June 2006.
Micro-Research Finland Oy MRF Timing System Jukka Pietarinen Timing Workshop CERN February 2008.
Dayle Kotturi Lehman Review May 10-12, 2005 LCLS Timing Outline Scope SLC Master Pattern Generator Introducing the PNET VME receiver.
EPICS Collaboration Meeting Fall PAL October 22 ~ 26, 2012 LCLS-I/LCLS-II Timing System Low Level Kukhee Kim for LCLS Timing Team ICD Software,
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
1 Timo Korhonen PSI 1. Concepts revisited…again 3. New (Diamond) cards features and status 4. EPICS interface 5. Conclusions SLS & Diamond Timing System.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 LLRF Outline System Concept Review Requirements.
EPICS Collaboration Meeting Fall PAL October 22 ~ 26, 2012 LCLS Timing System (pattern design, evGUI, and high level) Mike Zelazny for LCLS Timing.
EPICS Collaboration Meeting Timing Workshop April 24, 2012.
Stephanie Allison LCLS Controls Software Meeting Dec 6, 2007 How To Set Up for the Event System on an IOC with an EVR(s) Assumes.
The recent history and current state of the linac control system Tom Himel Dec 1,
Stephanie Allison SLC-Aware April 5, 2005 Introduction Description Issues Progress Plans for 2005 SLC-Aware IOC LCLS Collaboration,
Stephen Norum LCLS Oct. 12, LCLS Machine Protection System Outline Overview of interim MPS Update on the interim MPS.
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
LCLS Control Group FAC – 06 Installation October 27/28, Plans for 2006 Installation October 27, 2005 Installation.
Ron Akre, Dayle Kotturi Lehman October 24-26, 2006 Linac.
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 SLC Aware IOC BSAC* Facility Requirements Review *Beam Synchronous.
John Dusatko USPAS Fundamentals of Timing & Synchronization January 25, 2008 / Santa Rosa, CA 1 The LCLS Timing & Event System -
Calliope-Louisa Sotiropoulou FTK: E RROR D ETECTION AND M ONITORING Aristotle University of Thessaloniki FTK WORKSHOP, ALEXANDROUPOLI: 10/03/2014.
ESS Timing System Plans Timo Korhonen Chief Engineer, Integrated Control System Division Nov.27, 2014.
The Totem trigger architecture The LONEG firmware archtecture
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
ATF/ATF2 Control System
LCLS Timing Software and Plan
Timing and Event System S. Allison, M. Browne, B. Dalesio, J
LLRF Controls Outline Requirements External Interfaces Schedule Design
Event Displays for EVR IOCs
LCLS Timing Outline Scope The order of things
Fill-pattern Control System for KEKB
LCLS Event System - Software
EPICS Collaboration Meeting
Timing and Event System for the LCLS Electron Accelerator
LCLS Timing Outline Scope The order of things
Linac Coherent Light Source (LCLS) LLRF Preliminary Design Review LLRF Monitor and Control System September 26, 2005 Ron Akre.
SLS & Diamond Timing System update
Beam Synchronous Acquisition on IOC
Timing and Event System S. Allison, M. Browne, B. Dalesio, J
Digitally subtracted pulse between
EVG-to-EVR Data Transfer (Dayle Kotturi)
Breakout Session: Controls
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Timing and Event System Status DOE Review of the LCLS Project SC5 - Controls Systems Breakout Session S. Allison, M. Browne, B. Dalesio, J. Dusatko,
Presentation transcript:

Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 Timing Outline System Concept Review Requirements Personnel Engineering requirements Interfaces Alternatives Test plan Preliminary Design Review Block diagram Quality control and reliability Safety hazards

Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 Requirements Timing triggers are sent to devices to synch acquistions and measurements down the beamline Triggers are synched to the RF clock Input timing patterns (PNET SLCNET) arrive at 360 Hz, 1/120 sec in advance of when they are executed Late updates (during 1/120 sec prior to execution), for eg, MPS status updates, are also accepted Pnet pattern does not include everything. Eg. EPICS timestamp, LCLS MPS rate-limit must be appended on.

Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 Personnel Customers = Patrick Krejcik + Paul Emma need timing control system thru BC1 by Dec 06 Hardware = Dave Brown, COTS products Software = Dayle Kotturi

Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 Engineering Requirements As per requirements slide !?

Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 Interfaces PNET to LCLS MPG 128 bit 360 Hz including PP, YY, incl/excl mask and a 4 bit countdown to pulse id rollover LCLS MPG to EVG MPS to LCLS MPG EVG to EVRs EVRs to EVR transition modules EVR transition modules to devices

Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 Alternatives PNET SLCNET is unique to SLAC. No VME COTS modules exist. VME PNET Receiver had to be built and device driver written to meet Controls Group VME standard Given VME PNET Receiver, COTS products could then be used to propagate the timing info to devices. To take advantage of existing hardware modules and EPICS software, we chose to follow SLS and Diamond

Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 Test Plan

Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 Block Diagram

Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 Quality control and reliability PNET Receiver was tested over the summer for weeks at a time to look for dropped packets. Device driver performs checksum- like tests on front of pattern, end of pattern and front-to-end synching. If any of these 3 types of errors are found, counter is incremented, but comparator is reset to current value and operation continues.

Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 Safety hazards 110V AC Connector Require “Electrical Safety 251” completion for plugging/unplugging Hazards - Shock Mitigation - Don’t touch conductors when plugging into outlet Multi-mode fiber optic cable Don’t look directly into cable to determine presence of signal