All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.

Slides:



Advertisements
Similar presentations
CMS-UK Oversight Committee 17/5/04 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE EE crystals.
Advertisements

US CMS DOE/NSF Review: May 8-10, US CMS Cost & Schedule Mark Reichanadter US CMS Project Engineer DOE/NSF Review 8 May 2001.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
1 st International Conference "Discoveries of Higgs and Supersymmetry to Pioneer Particle Physics in the 21st Century" Concluding Remarks (LHC Status)
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
J. Leonard, U. Wisconsin 1 Commissioning the Trigger of the CMS Experiment at the CERN Large Hadron Collider Jessica L. Leonard Real-Time Conference Lisbon,
Detector Systems Update MICO March 3, MICE Detector Systems  CKOV u CKOV humidity (HIH4000) and temperature (LM35) sensors in hand for installation.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
From Olivier to commissioning team plans for the start-up of regular operations of LHCb 30/06 to 4/07 : Global commissioning week, all detectors, full.
Slide David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP Vendor Day 30 th April.
US CMS DOE/NSF Review: May 8-10, Endcap Alignment Dick Loveless DOE/NSF Review 9 May 2001.
US CMS Collaboration Meeting, May 19, PWO Crystal ECAL Ren-yuan Zhu California Institute of Technology May 19 th 2001.
Endcap Integration Workshop: June 11-14, CSC Commissioning Andrey Korytov.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
Report to the Collaboration & Some News from June 07 CMS Week India-CMS Collaboration Meeting BARC, Mumbai July 2007 A. Gurtu Tata Institute of Fundamental.
r1Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling YB+2 and YB+1, extension to minus wheels and YB0, cables between UXC55 and USC55.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
Status Report M. Della Negra US CMS Collaboration Meeting Riverside, 19 May Civil Engineering and Magnet 2. Tracker 3. ECAL 4. Muon DTs and RPCs.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
MICE VC Alain Blondel 1 MICE NEWS MICE VC 161 Agenda Overall schedule Magnetic field mitigation review Status of things.
Michel Della Negra/Karlsruhe May PbWO4 Crystals: Energy Resolution  m /m = 0.5 [  E1 /E 1   E2 /E 2  cot(  /2)  ] H   Simulation (100.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
Сессия Ученого Совета ОФВЭ 25 декабря 2008 Проект CMS в 2008 В.В.Сулимов.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
T. Orimoto, ECAL in CRUZET 1 ECAL in CRUZET CRUZET Data Analysis Jamboree 30 May 2008 Toyoko Orimoto California Institute of Technology On behalf of the.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
CMS ECAL DCS 10.Oct S.Zelepoukine ICALEPCS CMS ECAL DCS 1 The Detector Control System for the Electromagnetic Calorimeter of the CMS Experiment.
Activity related CMS RPC Hyunchul Kim Korea university Hyunchul Kim Korea university 26th. Sep th Korea-CMS collaboration meeting.
1J. Gu CERN CSC Meeting July 2008 DAQMB/FEBs Readiness for First Beam Jianui Gu The Ohio State University.
CMS 1.Goal of the experiment CMS is a general purpose apparatus for LHC designed to study the physics of p-p collisions at the center-of- mass energy of.
Woochun Meeting 3/26/2007. News March 27, 2007 Structures supporting the inner “cold mass” of one of the three magnets within its.
ECAL Off detector Electronics Workshop Lisbon April T. Camporesi ECAL activity sites 2005 Integration (now) 904 (now) Cosmic ray calibration (May)
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
1 Towards Phase 2 TP releases 2013 Didier Contardo, Jeff Spalding Status of current simulations studies and ongoing issues Needs for TP preparation.
Status of HO Installation Shashi Dugad Tata Institute of Fundamental Research India-CMS Collaboration Meeting, Chandigar April 2007.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
Totem Gas Systems ( T1, T2 ) F. Hahn and S. Haider PH / DT1.
Beampipe Installation Status Ray Veness For the Beampipe team in AT/VAC and TS-MME.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
Short summary of ATLAS week. Really a lot has happened since the last ATLAS Plenary in Paris! Giant steps in the detector hardware construction, assembly,
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
CMS ROC Report Patricia McBride May 26, 2005.
(University of Sofia “St. Kliment Ohridski”)
Technical Coordination Parallel Session November 2011, FNAL
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
Approved Plots from CMS Cosmic Runs (mostly CRUZET, some earlier)
LHC Experimental Vacuum Systems Status October ‘07
10/month is the present production rate 2 FTE + sporadic contributions
HCAL Commissioning and Related Activities
CMS RPC Endcap RE1 Status Report
ATLAS Muon Spectrometer and
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
UK CMS Oversight Committee Mtg
RPC Readiness for installation
Plans for the 2004 CSC Beam Test
CSC Electronics Installation and Commissioning CSCE I&C
Presentation transcript:

All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule

All CMS 30 May07 TSV2 News on the Machine Update on Triplets From CERN Homepage and Fermilab Today. Proposed to add to each Q1 magnet and each Q3 magnet a set of four cartridges that can absorb the longitudinal force generated during the pressure test. The solution was presented to a team of experts during a review at CERN on April 24 and 25. Since then the design of the cartridge system has been refined and parts needed for the cartridges and their installation have been ordered. The installation of the cartridges in the Q1 and Q3 magnet of at least one inner triplet is scheduled to be complete in early June, in time for the next pressure test. DG, DDG and LHC Project Leader to meet soon. Most likely will be given information soon afterwards.

All CMS 30 May07 TSV3 CMS progress UX: 2 DT sectors in YB0 commissioned with cosmics. All 18 EB- SMs inserted, YB0 services installation ongoing (showing ~ 3 week delay). Started installing tracker radial cable trays this week and start cabling of S1 towards the end of this week/beginning next week. HF+ commissioned. Conducting a global run now SX: YB-1 commissioned using cosmics (almost done), RE-2 chambers mounted - testing and commissioning. Cabling of YB-2 will finish soon. RPC HV cabling end-June. Tracker: Cosmics data being taken. Started process of going cold last week. Taking cosmics at 10C. ECAL: EB- installed, 25 SMs integrated (electronics). 20 supercrystals mounted on ‘Dee4’. Over EE 2500 crystals delivered. Finalize schedule for final order (this week).

All CMS 30 May07 TSV4 SX: DT Commissioning YB-1 The Minus-end Muon Systems in SX5 being commissioned using cosmics

All CMS 30 May07 TSV5 UX: DT Commissioning YB0 Sector 12

All CMS 30 May07 TSV6 HF+ in UX Commissioned Bunch crossings, 1bx =25ns Eta towers Phi towers Average response of towers to LED signals Average LED event shape HF+ connected to FEDs in USC

All CMS 30 May07 TSV7 EB- Installation Completed (22 May)

All CMS 30 May07 TSV8 Tracker “Chilling Out” Thurs 24 May 18:00

All CMS 30 May07 TSV9 All 20 Supercrystals mounted on “Dee4”

All CMS 30 May07 TSV10 YB0 Services Installation

All CMS 30 May07 TSV11 Overall CMS Schedule: v35.3 March April May June July Aug. Sep. Oct. Nov. 1) Detector Installation, Commissioning & Operation First Global Readout Test Barrel ECAL Inserted Tracker Inserted Trigger/DAQ Ready for System Commissioning CMS Ready to Close 2) Preparation of Software, Computing and Physics Analysis HLT exercise complete Pre-CSA07 Computing Software Analysis Challenge 2007 Physics Analyses completed CSA07 All CMS Systems Ready for Data Taking

All CMS 30 May07 TSV12 Points for Discussion Discuss new optimized CMS schedule during MB of 11 June - also use for AR, CMS Week and CR (involve wide constituency) Annual Reviews: June, agenda sent out this morning. CMS Week: June, Plenary sessions in 2 parts. Under construction. SLHC: need to prepare the next steps. Formulate a proposal by June MB ? RPC_RE Workshop: 25, 26 June at CERN - invite all interested parties. SLIMOS shifts - several incidents point to the need to start such shifts - will now actively canvas for volunteers (must not be solely people usually busy at Point 5 or on other critical path activities) Publications Conference Committee Constitution MoA’s