Max-Planck- Institut für Plasmaphysik Karsten Liesenberg / AS-T Visit NCSX engineers 11/12 October 2007 Final assembly of Stellarator W7-X in the torus-assembly.

Slides:



Advertisements
Similar presentations
Fusion Experiment WENDELSTEIN 7-X
Advertisements

NCSX Machine Platform FDR June 15, 2005 Erik D. Perry.
RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
MICE- AFC Unit Mechanical Design of the Cold Mass Support System Oxford University Rohan Senanayake.
Vacuum Vessel Production Readiness Review
Heinz Grote1 Presentation to NSCX WENDELSTEIN 7-X Assembly Max-Planck- Institut für Plasmaphysik KKS-Nr.: 1-AD Dok-Kennz.: -Txxxx.0 Heinz Grote October.
Auto Welding Torque Test Machine Model : Fully automatic station for testing welded joint strength for laser or brazed welded blades according to the.
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Iron Shield Mounting Design Stephanie Yang.
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
MICE RF and Coupling Coil Module Integration Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
EMCal Meeting CERN – July 2 nd 2007 LPSC Status 1 J-F Muraz LPSC Status LPSC Status.  Assembly Hall. - Removal starts and is in progress. - Main infrastructure.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
The main function of the divertor is minimizing the helium and impurity content in the plasma as well as exhausting part of the plasma thermal power. The.
Robert Ruland MMF Layout, Workflow October 14, 2004 MMF Review 1 MMF Layout, Workflow Robert Ruland Magnetic Measurements Facility.
MICE Alignment and Support Structure Tony Jones and Yury Ivanyushenkov Engineering Department RAL.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Construction of Wendelstein 7-X Max-Planck-Institut für Plasmaphysik
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
Photogrammetry at WENDELSTEIN 7-X Unternehmung WENDELSTEIN 7-X Max-Planck- Institut für Plasmaphysik Torsten Bräuer1Meeting with NCSX, Greifswald,
Tracking Integration Challenges Y. meeting 2013/9/25.
Visit Gangway FromLHBIEP__0181 by Andre Coin ~ 2600 GANGWAY POSITION.
1 Dimensional Control for the National Compact Stellarator Experiment R. Ellis, A. Brooks, T. Brown, W. Reiersen, S. Raftopoulos, B. Stratton Presented.
Argonne National Laboratory is managed by The University of Chicago for the U.S. Department of Energy LCLS Girder Support Concept Design Sushil Sharma.
ELENA Support system 6/11/2014 Antti Kolehmainen on behalf of WP Support system
JLAB CLAS12 Torus Structure The cold mass is composed of 6 coils, each inside a coil case, joined together at the inner radius by a hub and at the outer.
Max-Planck- Institut für Plasmaphysik Device Assembly K.-H. Oelgemöller NCSX Engineers in IPP – Dokumentennummer NCSX.
Automated NOvA Fly Cutting Machine NFCM 07/09/2010Jonas F., Lukas G., Balazs M., Jonas S., Christian W. 1 Automated NOvA Fly Cutting Machine.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Hall D Integration Status GlueX Collaboration Meeting Indiana University, Ravi Anumagalla.
WENDELSTEIN 7-X Basismaschine Design Review Plasma Vessel Max-Planck- Institut für Plasmaphysik J. Reich, W7-X BasismaschineDesign Review Plasma Vessel.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
Max-Planck-Institut für Plasmaphysik 21 st IAEA Fusion Energy Conference, Chengdu, 16 – 21 October Experience Gained during Fabrication and Construction.
1 Field Period Assembly Office of Science Project Review Princeton Plasma Physics Laboratory Princeton, NJ November 2, 2005 T. Brown Princeton Plasma Physics.
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
Max-Planck- Institut für Plasmaphysik U. Schultz, Assembly- Technology Working package Port assembly 1 Working package Port assembly Uwe Schultz.
SC Project Review of NCSX, April 8-10, 2008 NCSX Machine Assembly E. D. Perry.
1 Assembly Tooling PU Workshop on NCSX Cost & Schedule Princeton Plasma Physics Laboratory Princeton, NJ Mar 1-4, 2007 T. Brown Princeton Plasma Physics.
How to move your horn.. 1.This one is a shot of the horn with the acorn nut removed. STEP 1.
AWB Dimensional Control Requirements for the Modular Coils and TF coils Field Period Assembly Peer Review October 11-12, 2006 Art Brooks.
A View of NCSX Structural System and Load Path for the Base Support Structure.
9/28/20051 Mike Viola 1, T. Brown 1, P. Heitzenroeder 1, F. Malinowski 1, W. Reiersen 1, L. Sutton 1, P. Goranson 2, B. Nelson 2, M. Cole 2, M. Manuel.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
Joint Institute for Nuclear Research Deformations and stresses in the flux return yoke A.Efremov, Yu.Lobanov, A.Makarov Darmstadt,
12 July 2007IRENG07 WG-A M. Breidenbach1 SiD Concept SiD is relatively modest in scale compared to the LHC detectors, and comparable to SLD: Tracker Radius.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Max-Planck-Institut für Plasmaphysik 1 ICEC 26- ICMC 2016 March 7-11, 2016, New Delhi, India Michael Nagel Cryogenic commissioning, cool down and first.
NCSX Vacuum Vessel Fabrication
First Wall Panel - Overview
Roller/rail - System for PANDA
MQXC Nb-Ti 120mm 120T/m 2m models
LABORAORY 1 TITLE: Power Generation OBJECTIVES:
MICE Partial Return Yoke Mechanical Design
SBS- Counterweight Support and Magnet Assembly - Status
Module roadmap to end of 2017
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
Installation step 4. (3 days)
EHN1 Neutrino Installation Plans
By Arsalan Jamialahmadi
Preparation of Components for the Mounting of
Max-Planck-Institut für Plasmaphysik, EURATOM Association, Teilinstitut Greifswald, D Greifswald, Germany Main-Components of the Wendelstein 7-X.
Alignment of the first two magnet system modules of Wendelstein 7-X
Torsten Bräuer and the Metrologyteam
Welds in the magnet system
On the accuracy of port assembly at Wendelstein 7-X
Assembly, survey, alignment of the CBM Dipole Magnet
Presentation transcript:

Max-Planck- Institut für Plasmaphysik Karsten Liesenberg / AS-T Visit NCSX engineers 11/12 October 2007 Final assembly of Stellarator W7-X in the torus-assembly hall Karsten Liesenberg Project Engineer / AS-T

Final assembly of Stellarator W7-X Max-Planck- Institut für Plasmaphysik Unternehmung WENDELSTEIN 7-X Karsten Liesenberg / AS-TVisit NCSX engineers 11/12 October Overview mounting stands in torus-assembly hall Mountingstand IIIa Mountingstand IV Machine base Mountingstand IVa

Final assembly of Stellarator W7-X Max-Planck- Institut für Plasmaphysik Unternehmung WENDELSTEIN 7-X Karsten Liesenberg / AS-TVisit NCSX engineers 11/12 October Mountingstand IVa (finished in 2005) Mountingstand IVa with outer vessel lower shell, magnet system and plasma vessel In Mountingstand IVa, the outer vessel lower shell and the magnet system are put together.

Final assembly of Stellarator W7-X Max-Planck- Institut für Plasmaphysik Unternehmung WENDELSTEIN 7-X Karsten Liesenberg / AS-TVisit NCSX engineers 11/12 October Machine base and temp. supports (finished in 2006) Supporting structure (1 module) assembly phase Supporting structure (1 module) operating phase Machine base Temp. supports On the machine base and further temporary supports the stellarator (dead weight approx kN ) is supported during the assembly phase and the operating phase.

Final assembly of Stellarator W7-X Max-Planck- Institut für Plasmaphysik Unternehmung WENDELSTEIN 7-X Karsten Liesenberg / AS-TVisit NCSX engineers 11/12 October Mountingstand IV (finished in 2007) Basis platform Alignment system Measuring column Adjustment of 1 module in mountingstand IV In mountingstand IV the final assembly of the stellarator will be done. All 5 modules are aligned with an accuracy by ≤1.5 mm in all directions and afterwards welds or bolts with each other. Module with cross beam

Final assembly of Stellarator W7-X Max-Planck- Institut für Plasmaphysik Unternehmung WENDELSTEIN 7-X Karsten Liesenberg / AS-TVisit NCSX engineers 11/12 October Adjustment test in mountingstand IV (in 2007) An adjustment test for 1 module was accomplished successfully with a 100 t dummy load (accuracy ≤1.5 mm). A further adjustment test takes place in November For a final adjustment of the module we want to test a movement in all directions with radius of 5 mm with help of the sliding bearings and hydraulic cylinders in the temporary supports and the cryofeets. Module with cross beam Dummy load