@ 2012, Cengage Learning Performance Evaluation Using Variances from Standard Costs LO 3 – Computing Direct Materials and Direct Labor Variances.

Slides:



Advertisements
Similar presentations
Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Chapter Eleven Standard Costs and the Balanced Scorecard.
Advertisements

Chapter 15 Fundamentals of Variance Analysis Learning Objectives 4.Prepare and use a profit variance analysis. 2.Develop and use flexible budgets.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Cost Accounting Horngreen, Datar, Foster Flexible Budgets, Variances, and Management Control: I Session 7.
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Standard Costs and Variance Analysis Chapter Ten & Eleven.
Using Variances under Standard Cost System
Variance Analysis Chapter 7 Prepared by Diane Tanner
Lecture 6 Cost Variances for Direct Costs. The derivation of the price and efficiency variances AP ACTUAL COST AQ AP = actual price per unit of input.
Budgets and Variances continued: Production variances.
LEARNING OBJECTIVE: Compute the variable manufacturing overhead rate and efficiency variances. Explain how direct materials standard and direct labor standards.
23 Performance Evaluation Using Variances from Standard Costs
Financial and Managerial Accounting
McGraw-Hill/IrwinCopyright ©2008 The McGraw-Hill Companies, Inc. All rights reserved. Fundamentals of Variance Analysis Chapter 16.
CHAPTER 8 Performance Evaluation. The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-2 Learning Objective LO1 To describe flexible and static budgets.
Chapter 23 Flexible Budgets and Standard Cost Systems
Material variances 1) Material cost variance 2) Material price variance 3) Material usage or quantity variance 4) Material mix variance 5) Material mix.
@ 2012, Cengage Learning Performance Evaluation Using Variances from Standard Costs LO 4 – Computing Factory Overhead Variances.
Deluxe Linens Deluxe Linens makes high-end sheets which they sell to major retail stores and on their website. The budgeted costs for materials and direct.
Standard Costs and Operating Performance Measures
1 Click to edit Master title style Performance Evaluation Using Variances From Standard Costs 7.
© The McGraw-Hill Companies, Inc., 2005 McGraw-Hill/Irwin 24-1 STANDARD COST SYSTEMS Chapter 24.
Standard Costing and Variance Analysis
@ 2012, Cengage Learning Performance Evaluation Using Variances from Standard Costs LO 2 – Understanding How Standards are Used in Budgeting.
AMIS 212 Introductory Managerial Accounting Professor Marc Smith CHAPTER 1 MODULE 1 Chapter 10 Module 2.
Performance Evaluation
Variance Analysis Chapter 8. Material Costs Total Quantity X price Total Quantity = good units X Standard Qty per unit.
Chapter 10. Are standards the same as budgets? A standard is the expected cost for one unit. A budget is the expected cost for all units. Standards vs.
Standard Costing System Chapter 4 Managerial Accounting Concepts and Empirical Evidence.
© The McGraw-Hill Companies, Inc., 2008 McGraw-Hill/Irwin Financial & Managerial Accounting The Basis for Business Decisions FOURTEENTH EDITION Williams.
Chapter 22 Performance Evaluation Using Variances from Standard Costs Accounting, 21 st Edition Warren Reeve Fess PowerPoint Presentation by Douglas Cloud.
Chapter 16 Fundamentals of Variance Analysis.
Chapter 10 Standard Costs and the Balanced Scorecard.
Hanson Inc. has the following direct material standard to manufacture one Zippy: 1.5 pounds per Zippy at $4.00 per pound Last week 1,700 pounds of material.
Flexible Budgeting Chapter 07, 08
Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
Direct Labor Variances Managerial Accounting Prepared by Diane Tanner University of North Florida Chapter 44.
©2014 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publically accessible website, in whole or in part.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Budgeting Student Version Describe budgeting, its objectives, and its impact on human behavior
Performance Evaluation and Using Variances Chapter M6.
 Total Quantity X price  Total Quantity =  good units  X  Standard Qty per unit.
AC239 Managerial Accounting Seminar 7 Jim Eads, CPA, MST, MSF Performance Evaluation Using Variances from Standard Costs 1.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Standard Cost Systems Chapter 23.
Chapter 9 Introduction to a Standard Cost System.
Accounting Principles Using Excel for Success PowerPoint Presentation by: Douglas Cloud, Professor Emeritus Accounting, Pepperdine University.
AC239 Managerial Accounting Seminar 7 Jim Eads, CPA, MST, MSF Performance Evaluation Using Variances from Standard Costs 1.
AC239 Unit 7 Chapter 23 Performance Evaluation Using Variances from Standard Costs.
Chapter 17 Inventory & Control What we will cover: n Standard costs n Variance Analysis.
Chapter 23 Flexible Budgets and Standard Cost Systems.
C Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, or posted to a publicly accessible website, in whole or in part.
Chapter 23 Flexible Budgets and Standard Cost Systems Demonstration Problems © 2016 Pearson Education, Inc.23-1.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
8-1 PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright © 2016 by McGraw-Hill.
Cornerstones of Managerial Accounting, 5e
Variance Analysis: Direct Labor and Direct Materials ACG
STANDARD COST.
Standard Costs and Variances
Performance Evaluation
Power Notes Chapter M6 Performance Evaluation, Variances from Standards Learning Objectives 1. Standards 2. Budgetary Performance Evaluation 3. Direct.
Chapter 22 Performance Evaluation Using Variances from Standard Costs
STANDARD COSTS AND VARIANCE ANALYSIS FOR DECISION MAKING
Prepared by: C. Douglas Cloud Professor Emeritus of Accounting Pepperdine University © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned,
Performance Evaluation Using Variances from Standard Costs
Topic Six by Dr. Ong Tze San
Variance Analysis Chapter 10.
© 2017 by McGraw-Hill Education
AMIS 212 Introductory Managerial Accounting
Power Notes Chapter 21 Performance Evaluation, Variances from Standards Learning Objectives 1. Standards 2. Budgetary Performance Evaluation 3. Direct.
Power Notes Chapter M6 Performance Evaluation, Variances from Standards Learning Objectives 1. Standards 2. Budgetary Performance Evaluation 3. Direct.
Presentation transcript:

@ 2012, Cengage Learning Performance Evaluation Using Variances from Standard Costs LO 3 – Computing Direct Materials and Direct Labor Variances

Direct Materials Variances  The total cost variance for direct materials and direct labor can be separated into the portion of a cost variance that is caused by price (rate) differences and the portion that is caused by quantity (time) differences. LO 3

Direct Materials Variances During June, Western Rider reported an unfavorable total direct materials cost variance of $2,650 for the production of 5,000 XL style jeans, as shown in Exhibit 2 and reproduced below. LO 3

Direct Materials Variances  The direct materials price variance is the difference between the actual price per unit and the standard price per unit, multiplied by the actual quantity used. LO 3

Actual Direct Materials Cost = Actual Price x Actual Quantity Actual Direct Materials Cost = ($5.50 per sq. yard) x (7,300 sq. yards.) Actual Direct Materials Cost = $40,150 Standard Direct Materials Cost = Standard Price x Standard Quantity Standard Direct Materials Cost = ($5.00 per sq. yard) x (7,500 sq. yards.) Standard Direct Materials Cost = $37,500 Actual costs ($40,150) – Standard costs ($37,500) = $2,650 Total Unfavorable Materials Variance LO 3 Direct Materials Variances

LO 3 Direct Materials Price Variance Direct Materials Price Variance = (Actual Price – Standard Price) x Actual Quantity Direct Materials Price Variance = ($ $5.00) x 7,300 sq. yds. Direct Materials Price Variance = $3,650 Western Rider paid $0.50 more per square yard of material than the standard. Unfavorable direct materials price variance

Direct Materials Variances  The direct materials quantity variance is the difference between the actual quantity used and the standard quantity at actual production, multiplied by the standard price per unit. LO 3

Direct Materials Quantity Variance Direct Materials Quantity Variance = (Actual Quantity – Standard Quantity) x Standard Price Direct Materials Quantity Variance = (7,300 sq. yds. – 7,500 sq. yds.) x $5.00 Direct Materials Quantity Variance = – $1,000 Western Rider used 200 square yards less than the standard. Favorable direct materials quantity variance

Direct Materials Variance Relationships LO 3 $3,650 U Direct materials price variance Actual quantity x Standard price 7,300 x $5.00 = $36,500 Actual quantity x Actual price 7,300 x $5.50 = $40,150 Standard quantity x Standard price 7,500 x $5.00 = $37,500 – $1,000 F Direct materials quantity variance Actual cost: Standard cost: $40,150 – $37,500 = $2,650 U Total direct materials cost variance

Direct Materials Variance Relationships LO 3 Actual quantity x Standard price 7,300 x $5.00 = $36,500 Actual quantity x Actual price 7,300 x $5.50 = $40,150 Standard quantity x Standard price 7,500 x $5.00 = $37,500 Actual cost: Standard cost: $40,150 – $37,500 = $2,650 U Total direct materials cost variance

Direct Labor Variances LO 3 During June, Western Rider reported an unfavorable total direct labor cost variance of $2,500 for the production of 5,000 XL style jeans, as shown in Exhibit 2 and reproduced below.

Direct Labor Variances LO 3 Actual Direct Labor Cost = Actual Rate per Hour x Actual Time Actual Direct Labor Cost = $10.00 per hr. x 3,850 hrs. Actual Direct Labor Cost = $38,500 Standard Direct Labor Cost = Standard Rate per Hour x Standard Time Standard Direct Labor Cost = $9.00 per hr. x 4,000 hrs. Standard Direct Labor Cost = $36,000 Actual costs ($38,500) – Standard costs ($36,000) = $2,500 Total unfavorable direct labor cost variance

Direct Labor Rate Variance  The direct labor rate variance is the difference between the actual rate per hours and the standard rate per hour, multiplied by actual hours spent to make 5,000 pairs of jeans. LO 3

Direct Labor Rate Variance LO 3 Direct Labor Rate Variance = (Actual Rate per Hour – Standard Rate per Hour) x Actual Hours Direct Labor Rate Variance = ($10.00 – $9.00) x 3,850 hours Direct Labor Rate Variance = $3,850 The unfavorable variance could have been caused by improper scheduling and use of employees. Unfavorable direct labor rate variance

Direct Labor Time Variance  The direct labor time variance is the difference between the actual direct labor hours and the standard direct labor hours to make 5,000 pairs of jeans, multiplied by the standard direct labor rate per hour. LO 3

Direct Labor Time Variance LO 3 Direct Labor Time Variance = (Actual Direct Labor Hours - Standard Direct Labor Hours) x Standard Rate per Hour Direct Labor Time Variance =(3,850 hours – 4,000 direct labor hours) x $9.00 Direct Labor Time Variance = – $1,350 If there had been an unfavorable time variance, it might have been caused by a shortage of skilled workers. Favorable direct labor time variance

Direct Labor Variance Relationships LO 3 Actual hours x Standard rate 3,850 x $9 = $34,650 Actual hours x Actual rate 3,850 x $10 = $38,500 $3,850 U Direct labor rate variance Standard hours x Standard rate 4,000 x $9 = $36,000 –$1,350 F Direct labor time variance Actual cost:Standard cost: $38,500 – $36,000 = $2,500 U Total direct labor cost variance

Direct Labor Variance Relationships LO 3 Actual hours x Standard rate 3,850 x $9 = $34,650 Actual hours x Actual rate 3,850 x $10 = $38,500 Standard hours x Standard rate 4,000 x $9 = $36,000 Actual cost:Standard cost: $38,500 – $36,000 = $2,500 U Total direct labor cost variance