1 Joint Hurricane Testbed (JHT) 2009 Update Transition from Research to Operations Jiann-Gwo Jiing Chief, Technical Support Branch, NHC JHT Director Chris.

Slides:



Advertisements
Similar presentations
GIS Executive Council and Advisory Committee Update November 2010.
Advertisements

WIOA Timeline and Action Plan for States
Joint Typhoon Warning Center Forward, Ready, Responsive Decision Superiority UNCLASSIFIED An Overview of Joint Typhoon Warning Center Tropical Cyclone.
Integrated Ocean Observing System (IOOS) Data Management and Communication (DMAC) Standards Process Julie Bosch NOAA National Coastal Data Development.
Implementation Council Meeting Structure and Resources Background: The Implementation Council (Council) roles and responsibilities are described in the.
The Joint Hurricane Testbed The Joint Hurricane Testbed is funded by the US Weather Research Program in NOAA/OAR's Office of Weather and Air Quality Chris.
1 Joint Hurricane Test Bed (JHT) 2005 IHC Update USWRP Dr. Jiann-Gwo Jiing JHT Director Technical Support Branch Chief, TPC/NHC 9 March 2005.
Enhancing Education Through Technology Round 9 Competitive.
Demonstration Testbed for the Evaluation of Experimental Models for Tropical Cyclone Forecasting in Support of the NOAA Hurricane Forecast Improvement.
1 WRF Development Test Center A NOAA Perspective WRF ExOB Meeting U.S. Naval Observatory, Washington, D.C. 28 April 2006 Fred Toepfer NOAA Environmental.
Hurricane Diagnostics and Verification Workshop Opening Remarks Mark DeMaria May 4-6, 2009 National Hurricane Center Miami, Florida.
University of Wisconsin-Madison Space Science and Engineering Center (SSEC) 26 October 2005 SSEC/CIMSS Administrative Overview from Wenhua Wu, Tom Achtor.
Grants Business Process Re-Engineering (BPR) Overview
1 EEC Board Policy and Research Committee October 2, 2013 State Advisory Council (SAC) Sustainability for Early Childhood Systems Building.
April 2, 2013 Longitudinal Data system Governance: Status Report Alan Phillips Deputy Director, Fiscal Affairs, Budgeting and IT Illinois Board of Higher.
Targeting strategies to improve hurricane track forecasts (JHT 03-05) PIs: Dr Sharanya J. Majumdar (University of Miami) Dr Sim D. Aberson (NOAA/AOML/HRD)
A LONG-RANGE PERSPECTIVE ON THE POTENTIAL ROLES OF MODEL TESTBEDS IN IOOS CHRIS MOOERS DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING PORTLAND STATE.
Federal Geographic Data Committee: Coordination Group Meeting Proposal: FGDC Annual Planning Process & Monthly Performance Management Reviews Submitted.
Watertown Public Schools School Committee June 24, 2013 Jean M. Fitzgerald, Ed.D. Superintendent Report on Goals.
Development of a Probabilistic Tropical Cyclone Genesis Prediction Scheme Jason Dunion1, John Kaplan2, Andrea Schumacher3, Joshua Cossuth4, & Mark DeMaria5.
A. Schumacher, CIRA/Colorado State University NHC Points of Contact: M. DeMaria, D. Brown, M. Brennan, R. Berg, C. Ogden, C. Mattocks, and C. Landsea Joint.
Development of a Real-Time Automated Tropical Cyclone Surface Wind Analysis: Development of a Real-Time Automated Tropical Cyclone Surface Wind Analysis:
Update on Storm Surge at NCEP Dr. Rick Knabb, Director, National Hurricane Center and representing numerous partners 21 January 2014.
The Nation’s Hurricane Program: An Interagency Success Story March 5 - 9, st Interdepartmental Hurricane Conference.
Office of the Federal Coordinator for Meteorology OFCM 66th Interdepartmental Hurricane Conference March 5 – 8, 2012 Charleston, SC.
January Software Research and Technology Infusion 14 January 2008 Presented by Lisa Montgomery, NASA Pavan Rajagopal,
Joint Hurricane Testbed An Update of the Joint Hurricane Testbed is funded by the US Weather Research Program in NOAA/OAR's Office of Weather and Air Quality.
1 NUOPC National Unified Operational Prediction Capability 1 Review Committee for Operational Processing Centers National Unified Operational Prediction.
An Improved Wind Probability Program: A Year 2 Joint Hurricane Testbed Project Update Mark DeMaria and John Knaff, NOAA/NESDIS, Fort Collins, CO Stan Kidder,
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
Hurricane Forecast Improvement Project (HFIP) Overview NOAA Hurricane Conference Ed Rappaport for Fred Toepfer and Bob Gall December 1, 2009.
Update on the Joint Hurricane Testbed Activities Update on the Joint Hurricane Testbed Activities Jiann-Gwo Jiing JHT Director NHC 7 March 2007 Shirley.
1 Joint Hurricane Testbed (JHT) 2010 Update Transition from Research to Operations Jiann-Gwo Jiing Chief, Technical Support Branch, NHC JHT Director Chris.
1 © 2000 Technology Commercialization Group LLC. All rights reserved TECHNOLOGY COMMERCIALIZATION GROUP, LLC P AUL G. W AUGAMAN L OUIS G. T ORNATZKY Higher.
MATOC Trial Phase Dec 2008 to Jun 2009 Presentation to the Transportation Planning Board Richard W. Steeg, PE Chair MATOC Steering Committee VDOT Regional.
Joint Hurricane Testbed (JHT) 2006 IHC Update USWRP Dr. Jiann-Gwo Jiing JHT Director TPC/NHC 22 March 2006.
Ligia Bernardet, S. Bao, C. Harrop, D. Stark, T. Brown, and L. Carson Technology Transfer in Tropical Cyclone Numerical Modeling – The Role of the DTC.
NOAA and Hurricanes Meeting the Challenge Scott Kiser – NOAA’s NWS Tropical Cyclone Program Manager Scott Carter – NOAA Legislative Affairs.
A. FY12-13 GIMPAP Project Proposal Title Page Title: Improvements to the Advanced Dvorak Technique Status: New – but continuing work from GIMPAP FY07-09.
1 11/25/2015 Developmental Testbed Center (DTC) Bob Gall June 2004.
NOAA Cooperative Institutes John Cortinas, Ph.D. OAR Cooperative Institute Program, Program Manager NOAA Cooperative Institute Committee, Chairperson.
Evaluation of Experimental Models for Tropical Cyclone Forecasting in Support of the NOAA Hurricane Forecast Improvement Project (HFIP) Barbara G. Brown,
1 Joint Hurricane Test Bed (JHT) Opportunities for Transfer of Research and Technology into Tropical Cyclone Analysis and Forecast Operations USWRP AMS.
1 Joint Hurricane Testbed (JHT) 2011 Update Transition from Research to Operations Jiann-Gwo Jiing JHT Director NHC Chris Landsea NHC Chris Landsea NHC.
UNIVERSITY OF TORONTO SCARBOROUGH 1265 Military Trail, Toronto, Ontario M1C 1A4 CAMPUS DESIGN AND DEVELOPMENT (CDD) COMMITTEE.
Slides for NUOPC ESPC NAEFS ESMF. A NOAA, Navy, Air Force strategic partnership to improve the Nation’s weather forecast capability Vision – a national.
4th IPWG Workshop Chinese Meteorological Agency, Beijing, China, October, 2008 MAINSTREAMING THE OPERATIONAL USE OF SATELLITE PRECIPITATION DATA.
Tropical Cyclone Operations & Research Mary M. Glackin Deputy Under Secretary for Oceans & Atmosphere | NOAA 62 nd Interdepartmental Hurricane Conference.
Improved SFMR Surface Winds and Rain Rates Eric W. Uhlhorn NOAA/AOML/Hurricane Research Division Bradley W. Klotz University of Miami/RSMAS/CIMAS and HRD.
1 Joint Hurricane Testbed (JHT) 2010 Update Transition from Research to Operations Jiann-Gwo Jiing Chief, Technical Support Branch, NHC JHT Director 64th.
EGEE JRU Workshop, Brussels, December 1 st, JRU RoGrid – Romanian Experience RoGrid Consortium RoGrid JRU set-up RoGrid JRU Implementation Internal.
BIO AC November 18, 2004 Broadening the Participation of Underrepresented Groups in Science.
64th Interdepartmental Hurricane Conference NOAA Tropical Program Delivering on the Promise of Partnerships Jack Hayes NOAA Assistant Administrator & Director,
Update on the NADP Atmospheric Mercury Initiative Developing a new coordinated and collaborative approach to atmospheric mercury monitoring A Briefing.
DTC Overview Bill Kuo September 25, Outlines DTC Charter DTC Management Structure DTC Budget DTC AOP 2010 Processes Proposed new tasks for 2010.
1 NCEP’s Climate Forecast System as a National Model “Where America’s Climate, Weather and Ocean Services Begin” 32 nd Climate Diagnostics and Prediction.
Development and Implementation of NHC/JHT Products in ATCF Charles R. Sampson NRL (PI) Contributors: Ann Schrader, Mark DeMaria, John Knaff, Chris Sisko,
Federal Geographic Data Committee Update NGAC Meeting September 23, 2010 Ivan DeLoatch, Executive Director.
1 Where the Rubber Meets the Road: Testbed Experiences of the Hydrometeorological Prediction Center David Novak 1, Faye Barthold 2, Mike Bodner 1, and.
1 National Centers for Environmental Prediction: Where America’s Climate and Weather Services Begin Louis W. Uccellini Director, NCEP January 28, 2004.
Impacts of Land Effects and Improvements in Modeling Landfall Using HWRF A Joint Hurricane Testbed (JHT) Program Robert E. Tuleya, Yihua Wu, VijayTallapragada,
Fall 2012 The Glen Rock Elementary Report Card Committee.
Fostering Collaboration Between Operational NWP and Academic Communities Isaac Ginis University of Rhode Island 61 st Interdepartmental Hurricane Conference,
Data Coordinating Center University of Washington Department of Biostatistics Elizabeth Brown, ScD Siiri Bennett, MD.
“Tropical Cyclone Operations and Research: Priorities for the Future” March 3 - 7, nd Interdepartmental Hurricane Conference.
SEAD-funded APEC-CAST Project Proposal Solicitation Update 39 th Meeting of the APEC Expert Group on Energy Efficiency & Conservation 28 February 2012.
WRN Workshop NWS Funding Opportunities
Executive Order No. 23 Update Air & Waste Management Association Conference November 16, 2018 Presentation will focus on the latest policy development.
CAMPUS DESIGN AND DEVELOPMENT (CDD) COMMITTEE
Presentation transcript:

1 Joint Hurricane Testbed (JHT) 2009 Update Transition from Research to Operations Jiann-Gwo Jiing Chief, Technical Support Branch, NHC JHT Director Chris Landsea NHC Chris Landsea NHC Shirley Murillo NOAA/HRD Shirley Murillo NOAA/HRD 63 rd Interdepartmental Hurricane Conference St. Petersburg, FL March 5, 2009

2 OutlineOutline Summary of JHT projects Summary of JHT projects Major activities at JHT & NHC Major activities at JHT & NHC Challenges ahead Challenges ahead Summary of JHT projects Summary of JHT projects Major activities at JHT & NHC Major activities at JHT & NHC Challenges ahead Challenges ahead

3 Summary of JHT projects ) Number of projects supported: 50 1) Number of projects supported: 50 – 41 completed, 30 accepted for operational implementation – Number of projects rejected: 5 – Number of projects completed but pending further investigation (decisions deferred): 5 – Number of projects in process: 9 2) Implementation 2) Implementation – Number of projects implemented: 26.5 Number of numerical modeling related projects implemented by EMC/NCO: 10 Number of numerical modeling related projects implemented by EMC/NCO: 10 Number of projects implemented by NHC: 16.5 Number of projects implemented by NHC: 16.5 – Number of projects accepted but not yet fully implemented by NHC: 3.5 Note: 1) Implementation is defined when a project is completed, accepted, and the technique installed on NCEP/NCO or NHC operational systems and runs on operational time frame. 1) Implementation is defined when a project is completed, accepted, and the technique installed on NCEP/NCO or NHC operational systems and runs on operational time frame. Some techniques were “implemented” on JHT platform for testing. Some techniques were “implemented” on JHT platform for testing. 1) Number of projects supported: 50 1) Number of projects supported: 50 – 41 completed, 30 accepted for operational implementation – Number of projects rejected: 5 – Number of projects completed but pending further investigation (decisions deferred): 5 – Number of projects in process: 9 2) Implementation 2) Implementation – Number of projects implemented: 26.5 Number of numerical modeling related projects implemented by EMC/NCO: 10 Number of numerical modeling related projects implemented by EMC/NCO: 10 Number of projects implemented by NHC: 16.5 Number of projects implemented by NHC: 16.5 – Number of projects accepted but not yet fully implemented by NHC: 3.5 Note: 1) Implementation is defined when a project is completed, accepted, and the technique installed on NCEP/NCO or NHC operational systems and runs on operational time frame. 1) Implementation is defined when a project is completed, accepted, and the technique installed on NCEP/NCO or NHC operational systems and runs on operational time frame. Some techniques were “implemented” on JHT platform for testing. Some techniques were “implemented” on JHT platform for testing.

present Major Activities Completion of 15 third round ( ) projects Completion of 15 third round ( ) projects – Completed in August 2007 – Final evaluation (NHC/EMC POCs & JHT) September-December 2007 September-December 2007 – Decision on acceptance for implementation (NHC and EMC Directors) Decisions made January 2008 Decisions made January 2008 – 4 criteria for acceptance – 12 projects accepted – 3 projects deferred pending further evaluation – Implementaton 11 implemented: 4 by EMC/NCO & 7 by NHC 11 implemented: 4 by EMC/NCO & 7 by NHC Completion of 15 third round ( ) projects Completion of 15 third round ( ) projects – Completed in August 2007 – Final evaluation (NHC/EMC POCs & JHT) September-December 2007 September-December 2007 – Decision on acceptance for implementation (NHC and EMC Directors) Decisions made January 2008 Decisions made January 2008 – 4 criteria for acceptance – 12 projects accepted – 3 projects deferred pending further evaluation – Implementaton 11 implemented: 4 by EMC/NCO & 7 by NHC 11 implemented: 4 by EMC/NCO & 7 by NHC

present Major Activities Factors Considered in Decisions on Acceptance/Operational Implementation Forecast or Analysis Benefit: expected improvement in operational forecast and/or analysis accuracy Forecast or Analysis Benefit: expected improvement in operational forecast and/or analysis accuracy Efficiency: adherence to forecaster time constraints and ease of use needs Efficiency: adherence to forecaster time constraints and ease of use needs Compatibility: IT compatibility with operational hardware, software, data, communications, etc. Compatibility: IT compatibility with operational hardware, software, data, communications, etc. Sustainability: availability of resources to operate, upgrade, and/or provide support Sustainability: availability of resources to operate, upgrade, and/or provide support Factors Considered in Decisions on Acceptance/Operational Implementation Forecast or Analysis Benefit: expected improvement in operational forecast and/or analysis accuracy Forecast or Analysis Benefit: expected improvement in operational forecast and/or analysis accuracy Efficiency: adherence to forecaster time constraints and ease of use needs Efficiency: adherence to forecaster time constraints and ease of use needs Compatibility: IT compatibility with operational hardware, software, data, communications, etc. Compatibility: IT compatibility with operational hardware, software, data, communications, etc. Sustainability: availability of resources to operate, upgrade, and/or provide support Sustainability: availability of resources to operate, upgrade, and/or provide support Cont.

present Major Activities Implementation (NHC) Implementation (NHC) Some relative easy Some relative easy Some very complicated Some very complicated NHC contributes ≥ 0.5 FTE/yr on implementation NHC contributes ≥ 0.5 FTE/yr on implementation JHT IT facilitator assists in the process JHT IT facilitator assists in the process NCEP/EMC and NCO also contributed NCEP/EMC and NCO also contributed Implementation (NHC) Implementation (NHC) Some relative easy Some relative easy Some very complicated Some very complicated NHC contributes ≥ 0.5 FTE/yr on implementation NHC contributes ≥ 0.5 FTE/yr on implementation JHT IT facilitator assists in the process JHT IT facilitator assists in the process NCEP/EMC and NCO also contributed NCEP/EMC and NCO also contributed Operational Centers are not funded for this task Cont.

7 Highlights of 3 rd Round Implemented Projects Topographic Wind Effects - Miller HWRF – Tuleya, Powell VORTRAC – Lee/Bell/Harasti GFDL – Bender OLD GFDL (2) NEW GFDL (4) OLD GFS (1) NEW GFS (3)

8 Highlights of 3 rd Round Implemented Projects Corrected Consensus Track Forecasts - Goerss Wind Radii Decay Model - Kaplan Inclusion of Dropsonde Moisture into GFS – Aberson/Dunion Revised SHIPS intensity forecast scheme – DeMaria/Knaff

9 Highlights of 3 rd Round Implemented Projects Wind Radii Decay Model - Kaplan Improvements to ATCF operating system - Sampson Enhancements to Wind Probability Products – Knaff/DeMaria SFMR - Carswell/Black

present Major Activities Second year funding renewal for 4 th round projects – April - June 2008 Second year funding renewal for 4 th round projects – April - June 2008 Testing of 4 th round projects Testing of 4 th round projects – Collaboration with PI – Programming – Establishing data flow – Generating output for forecaster use/evaluation Second year funding renewal for 4 th round projects – April - June 2008 Second year funding renewal for 4 th round projects – April - June 2008 Testing of 4 th round projects Testing of 4 th round projects – Collaboration with PI – Programming – Establishing data flow – Generating output for forecaster use/evaluation Cont.

11

12 B2: Model development/improvements B3: Physical processes in models on track, intensity and structure, and precipitation B6: Advanced, probabilistic guidance; optimal ensemble construction and configuration; C1: Observing strategies/capabilities C2: Observations to support model diagnostics and verification C3: New and/or improved observational technologies

present Major Activities Preparation for 5 th round projects Preparation for 5 th round projects 1.Draft Federal Funding Opportunity (FFO) (March 08) Centers priorities Centers priorities Evaluation criteria Evaluation criteria – FFO published early July – SC Review of Pre-applications (September) – PIs submitting full proposals (Oct 30) – SC Review of full proposals (completed) Preparation for 5 th round projects Preparation for 5 th round projects 1.Draft Federal Funding Opportunity (FFO) (March 08) Centers priorities Centers priorities Evaluation criteria Evaluation criteria – FFO published early July – SC Review of Pre-applications (September) – PIs submitting full proposals (Oct 30) – SC Review of full proposals (completed) Cont.

14 Challenges for 2009 Fifth round funding processes Fifth round funding processes – Rank and select proposals for funding (completed) – Work with Grants Office to fund selected projects – Find Point of contacts among NHC forecasters and support staff – Work with PIs to setup timelines for their projects Test and evaluation (with NHC & EMC) Test and evaluation (with NHC & EMC) – Prepare real-time testing & evaluation for 5 th round projects – Set up necessary software code and data flow. Completion of 4 th round projects Completion of 4 th round projects – Final reports for 4 th round projects – POC feedback – JHT final review/reports to NHC Director Implement newly accepted projects (TPC) Implement newly accepted projects (TPC) Fifth round funding processes Fifth round funding processes – Rank and select proposals for funding (completed) – Work with Grants Office to fund selected projects – Find Point of contacts among NHC forecasters and support staff – Work with PIs to setup timelines for their projects Test and evaluation (with NHC & EMC) Test and evaluation (with NHC & EMC) – Prepare real-time testing & evaluation for 5 th round projects – Set up necessary software code and data flow. Completion of 4 th round projects Completion of 4 th round projects – Final reports for 4 th round projects – POC feedback – JHT final review/reports to NHC Director Implement newly accepted projects (TPC) Implement newly accepted projects (TPC)

15 AcknowledgementsAcknowledgements JHT Steering CommitteeJHT Steering Committee Shirley Murillo, JHT Admin. Asst.Shirley Murillo, JHT Admin. Asst. Chris Landsea, JHT Admin. Asst.Chris Landsea, JHT Admin. Asst. Jose Salazar, JHT meteorologist/programmerJose Salazar, JHT meteorologist/programmer NHC and EMC forecaster and points of contactNHC and EMC forecaster and points of contact NHC/Technical Support Branch staffNHC/Technical Support Branch staff JHT principal investigators and other funded participantsJHT principal investigators and other funded participants John Gaynor (USWRP)John Gaynor (USWRP) NHC admin staffNHC admin staff JHT Steering CommitteeJHT Steering Committee Shirley Murillo, JHT Admin. Asst.Shirley Murillo, JHT Admin. Asst. Chris Landsea, JHT Admin. Asst.Chris Landsea, JHT Admin. Asst. Jose Salazar, JHT meteorologist/programmerJose Salazar, JHT meteorologist/programmer NHC and EMC forecaster and points of contactNHC and EMC forecaster and points of contact NHC/Technical Support Branch staffNHC/Technical Support Branch staff JHT principal investigators and other funded participantsJHT principal investigators and other funded participants John Gaynor (USWRP)John Gaynor (USWRP) NHC admin staffNHC admin staff

16 JHT Website Go to

17 Thank you

18 Supplemental Slides

19 4th Round (FY07-08) Recommended Funding Distribution Total $1.04M ($1.5M announced) Private Companies 24% NOAA 20% State and Private Universities 33% Navy (NPS, NRL) 11% NASA 12% (0%) (16%) (36%) (9%) (39%)

20 Logistics Dedicated physical space in operations, offices Dedicated physical space in operations, officesPersonnel NHC dedicating about 1.5 FTE spread across ~12 people NHC dedicating about 1.5 FTE spread across ~12 people – 0.5 FTE reimbursed by USWRP for quarter-time JHT Director and one quarter-time JHT administrative assistant – NHC contributing 1.0 FTE, including NHC member on JHT Steering Committee, forecasters, and technical support staff Forecaster and technical points of contact (POC) Forecaster and technical points of contact (POC) Programming, system administration, and network support Programming, system administration, and network support Administrative support Administrative support Computing Resources Network connectivity Network connectivity Operational data flow Operational data flowLogistics Dedicated physical space in operations, offices Dedicated physical space in operations, officesPersonnel NHC dedicating about 1.5 FTE spread across ~12 people NHC dedicating about 1.5 FTE spread across ~12 people – 0.5 FTE reimbursed by USWRP for quarter-time JHT Director and one quarter-time JHT administrative assistant – NHC contributing 1.0 FTE, including NHC member on JHT Steering Committee, forecasters, and technical support staff Forecaster and technical points of contact (POC) Forecaster and technical points of contact (POC) Programming, system administration, and network support Programming, system administration, and network support Administrative support Administrative support Computing Resources Network connectivity Network connectivity Operational data flow Operational data flow NHC Contributions to JHT

21 JHT Infrastructure Personnel Quarter-time Director (NOAA FTE) Quarter-time Director (NOAA FTE) 7-member Steering Committee 7-member Steering Committee – Three from NOAA (one TPC), two from DOD, and two from the academic community – TPC member serves as co-Chair Two quarter-time administrative assistants (NOAA FTE) Two quarter-time administrative assistants (NOAA FTE) One IT Facilitator (meteorologist/programmer) One IT Facilitator (meteorologist/programmer) Computing Resources Server and workstations Server and workstations Software SoftwarePersonnel Quarter-time Director (NOAA FTE) Quarter-time Director (NOAA FTE) 7-member Steering Committee 7-member Steering Committee – Three from NOAA (one TPC), two from DOD, and two from the academic community – TPC member serves as co-Chair Two quarter-time administrative assistants (NOAA FTE) Two quarter-time administrative assistants (NOAA FTE) One IT Facilitator (meteorologist/programmer) One IT Facilitator (meteorologist/programmer) Computing Resources Server and workstations Server and workstations Software Software

22

23 Primary Area of Focus # of Projects Improvements to dynamical models (for track, intensity, and precipitation forecasts) 5 Statistical intensity forecast guidance 1 Enhancements to observed data, assimilation 0 Tropical cyclone structure/wind/wave distribution 2 Track forecast guidance 1 Enhancements to operational environment 1 Total present Major Activities 4th Round Project Focus Areas Cont.

24