[IT INFRASTRUCTURE OVERVIEW] Paul Ashurst Executive Director, EIS Global Network Services IT Corporate.

Slides:



Advertisements
Similar presentations
Achieving Seamless IP Optical Network Integration OIF Interoperability Update Amy Wang, Avici Systems.
Advertisements

NASK RESEARCH AND ACADEMIC COMPUTER NETWORK Collocation at the NASK Collocation and Hosting Centre.
M A Wajid Tanveer Infrastructure M A Wajid Tanveer
Q4 2004On-Band Corporation 1 Satellite On-Demand Global IP Broadband Reseller/Service Overview.
IT’S HERE Bandwidth Technologies. Agenda Technologies for Bandwidth –Single Location DSL/Cable T1/Bonded T1 DS3/OC-N Ethernet Over Copper (EoC, EoFM)
ONE PLANET ONE NETWORK A MILLION POSSIBILITIES Barry Joseph Director, Offer and Product Management.
MUNIS Platform Migration Project WELCOME. Agenda Introductions Tyler Cloud Overview Munis New Features Questions.
Introduction to Unitas Global Managed IT Infrastructure Service Provider February 2012 North America Los Angeles, USA
Mary Sakaluk Iggy Filice Hamilton Public Library.
Fast Path Data Center Relocation Presented by: AFCOM & Independence Blue Cross April 8, 2011.
Windows Azure Conference 2014 Hybrid Cloud Storage: StorSimple and Windows Azure.
Business Continuity and DR, A Practical Implementation Mich Talebzadeh, Consultant, Deutsche Bank
UMF Cloud
Evolution of Enterprise Services in the Statistics Canada IT Environment Silver Buckler Chief, Managed Storage Section Informatics Technology Services.
ITSC Report From The CIO: Network Program Update 25 September 2014.
Data Centers and IP PBXs LAN Structures Private Clouds IP PBX Architecture IP PBX Hosting.
Bert Lathrop Director, IT Infrastructure 10/6/2011 WAN Management Fee - Billing Changes.
Agenda Network Infrastructures LCG Architecture Management
Presented by :- Stuart Tilley - Network & Systems Technician Conference – Network overview and proposed enhancement th March 2008.
Peering, network sharing, interconnects Eckart Zollner September 2014.
Concept & Practicality in London Borough of Newham VOIP.
1 November 2008 David Hall Sales Manager – New Business Data Centre Hosting for the M-Business.
EXPLORING Strategic Partnership “Collaboration” Prepared by NET6.
ITDelivery – IMT Italy ©2009. All rights reserved. Fausto Bramati, PMP® Executive Project Manager IBM ITALIA Hosted Contact Center in Egypt Rome, March.
IBM System Storage™ DS3000 Series
EMEA Media Centre “Content Lifecycle – a Greenfield approach” 7 September 2011.
Business Intelligence Appliance Powerful pay as you grow BI solutions with Engineered Systems.
Technical Policy and Standards Andy Gorton – Senior Architect: Institutional Networks.
Building and Maintaining Regional Optical Networks Gregg Shepperd Principle Services Product Manager, Fujitsu Internet2 Spring Conference April 25, 2007.
CRISP & SKA WP19 Status. Overview Staffing SKA Preconstruction phase Tiered Data Delivery Infrastructure Prototype deployment.
Delivering Circuit Services to Researchers: The HOPI Testbed Rick Summerhill Director, Network Research, Architecture, and Technologies, Internet2 Joint.
FY14 TV PROJECTS VISION VERSION 4 EMEA UPGRADES Date 03/09/2013.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Services in a Converged WAN Accessing the WAN – Chapter 1.
CLASS Information Management Presented at NOAATECH Conference 2006 Presented by Pat Schafer (CLASS-WV Development Lead)
MediaCentre Overview. Agenda What is the Media Center Why are we doing it? Current State and Process Schedule Questions What does the schedule look like?
Solutions for Today on the Network of Tomorrow ePort.
MediaCentre Overview. Agenda What is the Media Center Why are we doing it? Current State and Process Schedule Questions What does the schedule look like?
NSF ANNUAL REVIEW June 2010 Ocean Observatories Initiative OOI Cyberinfrastructure Terrestrial CyberPoPs Implementation Matthew Arrott, Mark James, Brian.
MediaCentre RFP Where we are, Where we are going.
ENTERPRISE TIER 1 SAN STORAGE UPGRADE March 2014.
 The End to the Means › (According to IBM ) › 03.ibm.com/innovation/us/thesmartercity/in dex_flash.html?cmp=blank&cm=v&csr=chap ter_edu&cr=youtube&ct=usbrv111&cn=agus.
PI in a Modern Power Plant – American National Power, Inc. PI User Conference ‘03 Presented by: Brian M. Wood, American National Power, Inc More Uses Than.
LiveOps Instant Business Continuity
CERN Computer Centre Tier SC4 Planning FZK October 20 th 2005 CERN.ch.
MediaCentre Overview. Agenda What is the Media Center Why are we doing it? Current State and Process Schedule Questions What does the schedule look like?
Network infrastructure at FR-CCIN2P3 Guillaume Cessieux – CCIN2P3 network team Guillaume. cc.in2p3.fr On behalf of CCIN2P3 network team LHCOPN.
ClinicalSoftwareSolutions Patient focused.Business minded. Slide 1 Opus Server Architecture Fritz Feltner Sept 7, 2007 Director, IT and Systems Integration.
VOLUMES. RFP Summaries Inbound to MC 14,500 hrs supplier programme content per annum is required into the MAM- managed disk storage. Equates to 40 hrs/day.
Simplifying Cloud Connectivity for Your Clients Presenter: Tom SharkeyTom Sharkey December 8,
LiveOps UK&EU Infrastructure Review. Introductions Review overall call flow – How does a call and associated data flow through various LiveOps platform.
INFINEON– Case Study by Mindspeed Communications.
MediaCentre Project Transition Planning/Support 18 January 2013.
VOLUMES. RFP Summaries Inbound to MC 14,500 hrs supplier programme content per annum is required into the MAM- managed disk storage. Equates to 40 hrs/day.
EMEA Media Center Inception Funding 12/17/2012. Problem Statement, Objective and Scope Problem Statement –SPE spends too much on outside vendors to process.
Lightning Talk - 10Gbps Efficiency Apnic Christchurch Roger De Salis - Director.
Introduction to the Cloud November 21, Agenda  Introductions  Overview from Community Foundation Capacity Building Path  Current State  What.
Dominique Boutigny December 12, 2006 CC-IN2P3 a Tier-1 for W-LCG 1 st Chinese – French Workshop on LHC Physics and associated Grid Computing IHEP - Beijing.
Configuring SQL Server for a successful SharePoint Server Deployment Haaron Gonzalez Solution Architect & Consultant Microsoft MVP SharePoint Server
Infrastructure Deployment Services Dell Networking Deployment Services.
Enterprise Vitrualization by Ernest de León. Brief Overview.
Chapter 1: Explore the Network
Enterprise Storage at Seton Hall University
IOT Critical Impact on DC Design
MUNIS Platform Migration Project
Welcome! Thank you for joining us. We’ll get started in a few minutes.
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
Building HPE Data Center Solutions HPE0-S51 Dumps PDF s51-dumps.html.
CloneManager® Helps Users Harness the Power of Microsoft Azure to Clone and Migrate Systems into the Cloud Cost-Effectively and Securely MICROSOFT AZURE.
AWS Cloud Computing Masaki.
ENA Cloud Services.
Presentation transcript:

[IT INFRASTRUCTURE OVERVIEW] Paul Ashurst Executive Director, EIS Global Network Services IT Corporate

IT INFRASTRUCTURE OVERVIEW Agenda Agenda Overview of key IT Infrastructure components Overview of key IT Infrastructure components MC: what we know and don’t know today MC: what we know and don’t know today Key IT deliverables Key IT deliverables Next steps for IT Next steps for IT

SPE Global Wide Area Network 75+ locations MPLS = any-to-any connectivity Riverbed WAN acceleration = 60% coverage Exponential growth in bandwidth usage….! 75+ locations MPLS = any-to-any connectivity Riverbed WAN acceleration = 60% coverage Exponential growth in bandwidth usage….!

SPTN Connectivity – Status Update DBB PHX Cap Marina del Rey / Studio Lot London Budapest CE 10 GE 2 x 10 GE GigE 2 x 10 GE 10 GE Chandler Datacenter Singapore SPENA Global MPLS WAN For simplicity, LA and London metro regions shown collapsed; multiple 10G paths exist within these regional metros. GigE *upgraded from 100Mb *upgraded from 622Mb 1 x 10 GE *upgraded from 622Mb *upgraded from 2 x 622Mb *upgraded from 100Mb 100M Madrid AXNEncompass GigE *upgraded from 100Mb

London connectivity Golden Square Internet Enterprise IT Systems Docklands 2 x GigE 2 x 10 GE *currently evaluating 10GE upgrade options 2 dark fibre pairs lit at 10GE. Diversely routed London North Route London South Route

EU Data Centre – Global Switch, Docklands 6 Tier 3 Data Centre. Fully redundant power & cooling Can sustain 72 hours power outage Dual 10Gb connectivity – full resiliency thru entire path Network Core & Distribution layers – scalable Future expansion can be geographically separate Hosts Vision and Provys for SPT EMEA Tier 3 Data Centre. Fully redundant power & cooling Can sustain 72 hours power outage Dual 10Gb connectivity – full resiliency thru entire path Network Core & Distribution layers – scalable Future expansion can be geographically separate Hosts Vision and Provys for SPT EMEA

MC: Core IT Infrastructure Deliverables The technical infrastructure will: The technical infrastructure will: Generate approx. 1TB per day of transcoded content Generate approx. 1TB per day of transcoded content Include 180 TB of disk storage and 2.1PB of tape storage Include 180 TB of disk storage and 2.1PB of tape storage receive approx. 1TB inbound data per day receive approx. 1TB inbound data per day Generate 1.6TB of new content will be transferred to playout, per day (this includes approx. 365GB/day of content to non-linear platforms) Generate 1.6TB of new content will be transferred to playout, per day (this includes approx. 365GB/day of content to non-linear platforms) The technical infrastructure will: The technical infrastructure will: Generate approx. 1TB per day of transcoded content Generate approx. 1TB per day of transcoded content Include 180 TB of disk storage and 2.1PB of tape storage Include 180 TB of disk storage and 2.1PB of tape storage receive approx. 1TB inbound data per day receive approx. 1TB inbound data per day Generate 1.6TB of new content will be transferred to playout, per day (this includes approx. 365GB/day of content to non-linear platforms) Generate 1.6TB of new content will be transferred to playout, per day (this includes approx. 365GB/day of content to non-linear platforms) Within Golden Square there will be new work areas developed Media Centre components will be used by staff in Golden Square, Budapest and Madrid. MC must interface with other applications & systems hosted elsewhere within SPE Media Centre – what do we know today? What will IT deliver? Build the Data Centre Network Infrastructure - ensure interoperability with the rest of the SPE network Amend/upgrade the Golden Square office network Ensure sufficient connectivity to & from Media Centre Allow for future expansion Build the Data Centre! Space, power, equipment racks, cabling etc.. Provide ongoing support

Media Centre – Next Steps for IT? What are the actual data centre power, space & cabling requirements? Refine IT scope further! What are the exact locations of the users? What are the client requirements per location? What are the projected future changes? Obtain vendor quotes for network Bill of Material + hosting setup and recurring charges Refine IT infrastructure delivery timeline (see next page for estimated) Develop IT Infrastructure Terms of Reference Mobilise Resources!

IT Infrastructure – Draft Implementation Timeline MONTH 5MONTH 4MONTH 3MONTH 2MONTH 1MONTH 6MONTH 7 IT Infrastructure Readiness IT Infrastructure Build-out Place Orders Testing & Sign-off Pre-stage configurations IT Design & Documentation Hypercare DC Facility Ready Project Greenlight Equipment Onsite DRAFTDRAFT MONTH 8MONTH 9MONTH 10

Connectivity to Sony Electronics