1 D0 Taking Stock By Anil Kumar CD/LSCS/DBI/DBA June 11, 2007.

Slides:



Advertisements
Similar presentations
ArrayExpress Oracle DBA Ahmet Oezcimen. Agenda 1. Tasks 2. System Overview 3. Oracle DB System 4. Database Monitoring 5. Database Security 6. Performance.
Advertisements

Introduction to Oracle
2 Copyright © 2005, Oracle. All rights reserved. Installing the Oracle Database Software.
Hosted by Case Study: How the Scotts Company Increase Systems Performance Jeannie Shimer Director, Platform Services The Scotts Company.
VMware Infrastructure Alex Dementsov Tao Yang Clarkson University Feb 28, 2007.
Presenter: Raman Chohan. AGENDA Oracle Best Practices Oracle Backups Why upgrade to Oracle 11? Performance Troubleshooting axiUm Pre-Upgrade Checklist.
F Fermilab Database Experience in Run II Fermilab Run II Database Requirements Online databases are maintained at each experiment and are critical for.
Virtual Network Servers. What is a Server? 1. A software application that provides a specific one or more services to other computers  Example: Apache.
Introduction to Oracle Backup and Recovery
NovaBACKUP 10 xSP Technical Training By: Nathan Fouarge
Backup & Recovery Concepts for Oracle Database
THE QUE GROUP WOULD LIKE TO THANK THE 2013 SPONSORS.
CERN IT Department CH-1211 Genève 23 Switzerland t Next generation of virtual infrastructure with Hyper-V Michal Kwiatek, Juraj Sucik, Rafal.
Castor F2F Meeting Barbara Martelli Castor Database CNAF.
1 Copyright © 2009, Oracle. All rights reserved. Exploring the Oracle Database Architecture.
MCITP Administrator: Microsoft SQL Server 2005 Database Server Infrastructure Design Study Guide (70-443) Chapter 1: Designing the Hardware and Software.
Online Databases Status Oracle 8i Servers, release Platform: Compaq Tru64 UNIX V5.1 (Rev. 732) Production DB d0onprd, on d0olc, 64 users, 34Gb.
Exam QUESTION CertKiller.com has hired you as a database administrator for their network. Your duties include administering the SQL Server 2008.
D0 DB Taking Stock ‘10 1 By Anil Garg – Database Services June 17, 2010.
Operating in a SAN Environment March 19, 2002 Chuck Kinne AT&T Labs Technology Consultant.
Fermilab Oct 17, 2005Database Services at LCG Tier sites - FNAL1 FNAL Site Update By Anil Kumar & Julie Trumbo CD/CSS/DSG FNAL LCG Database.
Online Database Support Experiences Diana Bonham, Dennis Box, Anil Kumar, Julie Trumbo, Nelly Stanfield.
D0 Taking Stock1 By Anil Kumar CD/CSS/DSG July 10, 2006.
SRUTHI NAGULAVANCHA CIS 764, FALL 2008 Department of Computing and Information Sciences (CIS) Kansas State University -1- Back up & Recovery Strategies.
15 Copyright © 2005, Oracle. All rights reserved. Performing Database Backups.
Chapter 8 Implementing Disaster Recovery and High Availability Hands-On Virtual Computing.
CDF Taking Stock ‘08 1 By Anil Kumar CD/LSCS/DBI/DBA July 16, 2008.
CERN - IT Department CH-1211 Genève 23 Switzerland t Tier0 database extensions and multi-core/64 bit studies Maria Girone, CERN IT-PSS LCG.
CD FY09 Tactical Plan Review FY09 Tactical Plans for Database Services J.Trumbo Sept. 24, 2008.
Databases March 14, /14/2003Implementation Review2 Goals for Database Architecture Changes Simplify hardware architecture Improve performance Improve.
15 Copyright © 2007, Oracle. All rights reserved. Performing Database Backups.
Oracle Advanced Compression – Reduce Storage, Reduce Costs, Increase Performance Session: S Gregg Christman -- Senior Product Manager Vineet Marwah.
Installation and Upgrade Campus-Booster ID : **XXXXX Copyright © SUPINFO. All rights reserved Solaris 10 installation.
Slim Ayadi, Majid Ounsy Tango Meeting Mai Mai 2009 Archiving News.
© 2008 Quest Software, Inc. ALL RIGHTS RESERVED. Perfmon and Profiler 101.
SLAC Site Report Chuck Boeheim Assistant Director, SLAC Computing Services.
06/22/2005CDF Taking Stock CDF Taking Stock By Anil Kumar CD/CSS/DSG June 22, 2005.
CERN Physics Database Services and Plans Maria Girone, CERN-IT
Module 3 Planning and Deploying Mailbox Services.
Proposed Server Infrastructure for the EGIS Initiative.
CD FY10 Budget and Tactical Plan Review FY10 Tactical Plans for Database Services Nelly Stanfield October 7, 2009 Database Services3425-v1.
Elizabeth Gallas August 9, 2005 CD Support for D0 Database Projects 1 Elizabeth Gallas Fermilab Computing Division Fermilab CD Grid and Data Management.
CERN - IT Department CH-1211 Genève 23 Switzerland t Oracle Real Application Clusters (RAC) Techniques for implementing & running robust.
Hosted SharePoint. Part 3/3: Office Live as a WSS solution Speaker Name Microsoft Corporation Hosted.
Oklahoma Department of Human Services Child Welfare Database Migration.
CERN IT Department CH-1211 Genève 23 Switzerland t Possible Service Upgrade Jacek Wojcieszuk, CERN/IT-DM Distributed Database Operations.
CDF DB Taking Stock ‘10 1 By Anil Garg – Database Services Aug 18, 2010.
The Million Point PI System – PI Server 3.4 The Million Point PI System PI Server 3.4 Jon Peterson Rulik Perla Denis Vacher.
CERN Database Services for the LHC Computing Grid Maria Girone, CERN.
CERN - IT Department CH-1211 Genève 23 Switzerland t High Availability Databases based on Oracle 10g RAC on Linux WLCG Tier2 Tutorials, CERN,
Greenlight Presentation Oracle 11g Upgrade February 16, 2012.
D0 Taking Stock1 By Anil Kumar CD/CSS/DSG June 06, 2005.
Overview of Oracle Backup and Recovery Darl Kuhn, Regis University.
Maria Girone CERN - IT Tier0 plans and security and backup policy proposals Maria Girone, CERN IT-PSS.
CNAF Database Service Barbara Martelli CNAF-INFN Elisabetta Vilucchi CNAF-INFN Simone Dalla Fina INFN-Padua.
CERN IT Department CH-1211 Genève 23 Switzerland t Next generation of virtual infrastructure with Hyper-V Juraj Sucik, Michal Kwiatek, Rafal.
BNL dCache Status and Plan CHEP07: September 2-7, 2007 Zhenping (Jane) Liu for the BNL RACF Storage Group.
19 Copyright © 2004, Oracle. All rights reserved. Database Backups.
March, Database Projects J.Trumbo CSS-DSG May,
February, Databases Project Update J.Trumbo LSC/DBI/DBA February 27, 2007.
Calgary Oracle User Group
ETL Validator Deployment Options
Understanding and Improving Server Performance
Database Services at CERN Status Update
By Anil Kumar CD/CSS/DSG June 06, 2005
Database Services at Fermilab
CERN Windows Roadmap Tim Bell 8th June 2011.
Introduction of Week 3 Assignment Discussion
TrueSight Capacity December 13, 2018 Architecture Review Mike West.
PerformanceBridge Application Suite and Practice 2.0 IT Specifications
Presentation transcript:

1 D0 Taking Stock By Anil Kumar CD/LSCS/DBI/DBA June 11, 2007

2 Outline  Infrastructure  Space Usage  Capacity Planning  Backup & Recovery  SAM Schema  Accomplishments  What’s Next  Concerns  Q & A

3 D0 offline Production/Integration Infrastructure  8 900MHz CPU 32G RAM  The machine has a Clariion 4500 hardware raid array  Oracle Server 10gR2 (64 bit) on Solaris 2.9 (64 bit)  Load Avg. 4-6 CPU usage ~53%, Memory Free : 50% ( 16GB)  Uptime excluding scheduled down times 100% Uptime since June, 2006 vs last year.

4 D0 offline production Luminosity  Sun v40z with 2 AMD 844MHz CPU, RHEL3 x86_64, 16G RAM  2 Ultra 160 RAID controllers  Oracle server 10gR2  Load Avg. 1 CPU usage ~3-60%, Memory Free : 20M  Uptime excluding scheduled down times 100% since June 2006

5 D0 offline development Infrastructure D0ora1  Sun E4500  MHz CPU, 4GB of RAM  Oracle 10gR2 64 bit on Solaris 2.9  Load Avg 1-2, CPU usage ~33%, Memory Free 19% D0lum1  Sun v40z with 2 844MHz AMD CPU  RHEL3 x86_64  16G RAM  Oracle server 10gR2  Load Avg 1, CPU usage ~4%, Memory Free 74M

6 Space Usage

7 Space Usage Summary  d0ofprd1 257 GB used. d0ofint1 185 GB used. 2TB available for int and production.  d0ofdev1 107 GB Used 165GB is available for use.  d0oflumd 298GB used doflumi 495MB used 170GB is available for d0oflumd and d0oflumi  D0oflump 627GB used 1 TB is available.

8 Capacity Planning  Next three years expected growth 300Gb SAM growth ~80Gb/year and other apps 10Gb/year (this exclude Luminosity DB ) We have around 2TB available.  Next three years Luminosity growth is 500Gb. There is 1TB available.

9 Back-up/Recovery  D0ofprd1  Daily, 4 days of archives.  Allocated 4TB, Used 1.2TB (2 copies), RMAN Back-up time -> 2 Hrs No Export. Both copies of rman backup to SAN. No local copy.  Backups taken to dcache 3x/week  D0lump  Daily, 4 days of archives  Allocated 3TB, Used 2.2 ( 2 copies), RMAN Back-up time -> 6 Hrs No Export. Both rman backup copies are on SAN. No local copy.  Backup to dcache daily.

10 SAM Schema  Production Deployments : Retiring Files v6_3 Indexes v6_4, v6_5,v6_6, v6_8, v6_9 Sequence Cache V6_7  Work-in-progress - v6_10 Global temporary tables.  Upgrade to Mini SAM as SAM Schema Evolved. -> This facilitate individual developers to have copy of SAM metadata and seed data available for server software rewrite if needed.  Discontinued supporting the postgres version of SAM schema as per last year taking stock meeting.

11 Accomplishments  Quarterly Database Security/OS patches Up-to-date.  Upgraded the d0 offline Lumi databases to 10gR2.  Upgraded the designer repository to 10gR2  Disk capacity upgrade for d0 offline lum db production db.  OS upgrade on d0online Db  Disk capacity Upgrade for d0online db machines.  Merged the monitoring of d0 online with central monitoring for all dbs.  Migrated the d0 online designer users to central designer repository.  Took over the System Support for d0 online db machines.  Deployed the rman enhancements to d0 online databases.  Deployed the rman_dcache for d0online prd databases.

12 Accomplishments  Depreciated the events on d0offline db. Recovered space ~800GB  Deployment SAM v6_0 through v6_8. This includes the SAM request system.  Began Testing and deployment of 3PAR SAN storage to replace clariion array.  Bundled the Redhat licenses into one P.O.  Deployed additional weekly schema analysis for SAM for tuning

13 What’s Next ?  Replacement of Aging Clariion Array with 3par SAN storage including int/prd d0 offline database instances to 3par array.  Take Over support for d0 online databases by end of June 2007  Upgrade the Oracle databases to version  ASO ( Advanced Security Option) Deployment

14 Concerns  Python Dcoracle to be built with Oracle 10g client. Oracle recommends client version should be same as Database Version. Any Oracle Patch may break Pyhton Dcoracle built with 8i client.  Single point of failure with D0 offline database.  Hardware for D0 DB server machines is very old. Should consider upgrading the hardware for d0 db servers.  Speaker Bureau schema in development db being used in production mode. This schema must be moved to production.  Not enough disk capacity on d0ofline lum dev/int machines to do production refresh. Note : Investigating hardware configuration if 3par array can be attached to d0lum1. This will facilitate the full integration refresh from production.

15 Q & A