MEP (Martian Environmental Pod) 3/15/2004 Aerospace Engineering Department University of Colorado-Boulder Interim Review #2.

Slides:



Advertisements
Similar presentations
All Russelectric 4 pole Open Transition ATS’s have a fully rated -break before make- switched neutral, identical in every way to the main power poles and.
Advertisements

Manufacturing Processes
Welding of Metals.
Injection Molding MFG 355.
UNIT -6 Rapid Tooling.
Rx190 Aero Edition. Great Creation Is In The Details.
Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
5 Engine Blocks. 5 Engine Blocks Learning Objectives Explain how to gain access to the components in a stationary engine. Explain how to remove a mobile.
The Electric Materials Company Right the First Time On Time Every Time.
EDM Collaboration Meeting, October 5-7, 2006 Valve R&D Steve Williamson UIUC.
Semiconductor Input Devices
A Canadian Hot Tub Factory Tour. You begin with a Quality Lucite Acrylic sheet. The shape is created by loading the sheet into a forming machine, heating.
CNG Refuelling station. A company located in Cherasco (Italy), is among the world leaders in the field of designing and manufacturing of components and.
Design and Manufacturing
MANUFACTURING (Lecture 2).
Injection Moldable Metal Alloys
Both the dome and slab design use a 5 gallon bucket in the middle to be used as a squat hole FINAL MOLD DESIGN.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
P09451 Mid-Project Review Bryan McCormick (ME) Project Manager Andy Freedman (ME) Heat Transfer/Fluids Analysis & Design John Kreuder (ME) Thermal Modeler.
MEP (Martian Environmental Pod) 2/16/2004 Aerospace Engineering Department University of Colorado-Boulder Interim Review.
Team BIOHAZARD Presents: Project CRUENTO. CRUENTO: Latin – to make bloody; stain with blood.
New Mexico FFA Agricultural Mechanics Career Development Event Plumbing.
Hg Delivery System Fabrication Status V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting May 5, 2006.
Materials.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Digital PECVD Machine Design and Construction Zlatan Ceric William Edwards Timothy Gurtler David Ogden Quan Tran Date:12/10/2010.
Sponsor/Customer: Dr. Ferat Sahin Multi Agent Bio-Robotics Lab Faculty Guide: Prof. George Slack Team Members: Matthew LeStrange – Electrical Engineering.
Before we use plastics we need to think about the following processes:
Arc Furnace Melting and Sand Casting of Aluminum and Copper James Bonnell James O’Brien Engr 45 Dec 8, 2004.
Total Solution For Industrial Automation. Power Plant Cogeneration Power Plant –Generate Electricity –Provides Steam & Warm Water DCS : Westinghouse Electric.
Presentation of HanKing
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
21/01/02 - ECAL Cooling - Arnaud Hormiere ST/CV 1 Development of ECAL COOLING PLANT Application to a Super Module.
Nanofocus AG 2012/07/19 Optical process tools for automotive Technical surface characterization to fulfill today’s customer demands 1.
RAINBOW HARDWARE CO., LTD. Supplying Taiwan’s best fasteners and customized hardware parts globally Since Sales Director, Justin Tsao
Pure Tungsten As a high performance materials, Pure Tungsten has high melting temperature, high density, low vapor pressure, low thermal expansion combined.
Microbial Detection Arrays Interim Review I February 6 th, 2007 Aerospace Senior Projects University of Colorado – Boulder Advisors: Dr. Forbes and Dr.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
MEP (Martian Environmental Pod) Fall 2003 Aerospace Engineering Department University of Colorado-Boulder Critical Design Review.
Oxy Acetylene Welding and Cutting
Digital PECVD Machine Design and Construction Zlatan Ceric William Edwards Timothy Gurtler David Ogden Quan Tran Date:10/25/2010.
Capstone Project: Solar Water Heater Andrew Black, Jack Nordloh and Jesse Weber.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
CW Thomas Thermoforming. CW Thomas Custom manufacturer of heavy gauge thermoformed plastic parts. ( START THICKNESS TO ) No proprietary products.
Introduction to Manufacturing Processes Pt. 2 © 2012 Project Lead The Way, Inc.Principles Of Engineering.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
Maggie Alvarado Diego Azevedo Raphael Santos Cavalcanti Natalie Levings Richard Robards Bruno Vieira.
Lithium Hydride Absorber Program C. M. Lei March 17, 2008.
Engine Disassembly manual. Oil plugs/ 10 mm wrench.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
Water Heaters 101 Residential Gas and Electric. Outline Basic water heater features Residential gas overview Residential electric overview Q&A.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
Staring “The Bridgeport Mill”
Ti/SS transitions A.Basti INFN-PISA*
LARP Phase II Secondary Collimator RC1
MICE Coupling Coil Update
Q Design & Technology Product Design U MACHINERY I Z.
USER-INTERFACE ASSEMBLIES & ELECTRONICS ASSEMBLY MANUFACTURER
LARP Rotatable Collimators for LHC Phase II Collimation
SNS PPU Cryomodule Instrumentation
Designing and Manufacturing of a hand operated plastic injection moulding machine envisioned for the mesoscale range. Freddy Travieso
Electronics Contract Manufacturing Service Topscom provide an extensive turnkey electronics manufacturing service range of fabrication, engineering and.
Make your CORRUGATOR run BETTER
Su-Jin Kim Gyeongsang National University
Su-Jin Kim Gyeongsang National University
SNS PPU Cryomodule Instrumentation
SC1R Cold Box PDR Assembly Sequence
Technologies Teacher Answers to Practical Activities 1-3
Presentation transcript:

MEP (Martian Environmental Pod) 3/15/2004 Aerospace Engineering Department University of Colorado-Boulder Interim Review #2

Request for Action RFAAuthorSolution Cannot weld aluminum shaft to petals PaloKey the aluminum shaft and aluminum sleeve No welding near acrylic parts

x 10 Electronics Package Platform Mounting Box Greenhouse Thermal Petals

Design Changes Greenhouse/Pressure System –Molding tool design Thermal Shield/Structure –Keyed aluminum shaft and aluminum sleeve –New assembly order Electronics/Software –Trimpot

Molding Tool New design allows for the use of a furnace instead of internal heater Shelled out to reduce heating time Rolling method is done by hand on top of grooved plate

Keyed Shaft and Sleeve Keyed aluminum shaft to eliminate the need for welding Key –0.1’’ x 0.2’’ x 0.3’’ Aluminum shaft –Depth: 0.1’’ Aluminum sleeve –Depth: 0.2’’

New Assembly Order

Greenhouse/Pressure System Molding tool is complete Tested for functionality: –Control valve –Regulator and CO 2 tank

Thermal Shield/Structure Completed petals using new epoxy Machined parts for petals Machined electronics box parts

Electronic Setup

Software Setup

Electronics Testing Verified functional operation of: –Pressure transducer –Thermistor –Determined conversion coefficient –LabView

Current Issues Laser cutter availability/reliability –Solution: sand edges for even mating surface Outdoor testing -Solution: car inverter for power supply and data acquisition system

To Be Completed: Greenhouse/Pressure System Molding plate (3/19/04) Shape Kapton for deployable greenhouse (3/31/04) Construct greenhouse around acrylic rings (4/2/04)

To Be Completed: Thermal Shield/Structure Finish constructing thermal shield (3/19/04) Machine and construct base structure (3/28/04) Machine aluminum shaft and sleeve (3/31/04)

To Be Completed: Electronics Integration of Trimpot (3/28/04) Finish Circuit (4/2/04) –Copper Custom Plate

Integration Fasten greenhouse to mounting box (3/28 – 3/31) Assemble final structure (3/28 – 4/2) Integrate pressure and power sources with electronics package (3/28 – 4/2)

Schedule Progress

DateCompanyPartsPhone NumberAmount 12/15/2003Kinko'scopies $ /15/2003Kinko'scopies $ /17/2003Colorado Plastic Products Inc.acrylic, epoxy $ /15/2004R.S. Hughes Company Inc.epoxy $ /20/2004Omega Engineering Inc.thermistor, pressure transducer $ /21/2004Maxon Precision Motors Inc.motors, gearboxes $ /22/2004R.S. Hughes Company Inc.epoxy gun, mixing nozzles $ /27/2004American DurafilmKapton $ /28/2004McGunkin Hardware Inc.clamps, aluminum rods, key $ /28/2004Colorado Plastic Products Inc.acrylic $ /28/2004R.S. Hughes Company Inc.mixing nozzles $ /28/2004The Lee Companycontrol valve $0.00 1/30/2004Radio Shackelectronics $ /31/2004Radio Shackelectronics $ /31/2004Fistell'srelay switch $ /9/2004Colorado Plastic Products Inc.acrylic $ /12/2004The Beverage Factorycarbon dioxide tank $ /25/2004McGunkin Hardware Inc.clamps, gas line $ /1/2004Colorado Plastic Products Inc.acrylic $ /10/2004Hobbytown USA Inc.CA glue $46.37 Total:$1,532.54

Questions?