Takashi Matsushita Imperial College T. Matsushita 1 Quality Control of Station Assembly.

Slides:



Advertisements
Similar presentations
Takashi Matsushita Imperial College T. Matsushita 1 Station 5 status.
Advertisements

MICE Collaboration MTG IIT – Feb 2002 The Fiber Tracker Option for MICE Spectrometers The D0 Central Fiber Tracker – Experience and Implications for MICE.
G.Barber: Mice Tracker Meeting New York1 Plans for Sci-Fi Prototyping. Contents:- Mechanical Layout of Sci-Fi Design of the Fibre Optic Connectors.
Takashi Matsushita Imperial College T. Matsushita 1 Quality Assurance 16/05/06.
Takashi Matsushita Imperial College T. Matsushita 1 Station five – assembly/QA.
Status of MICE Tracker System H. Sakamoto, Osaka University (on behalf of the MICE Collaboration) International Muon Ionization Cooling Experiment (MICE)
1 Scintillating Fibre Cosmic Ray Test Results Malcolm Ellis Imperial College London Monday 29 th March 2004.
Takashi Matsushita Imperial College T. Matsushita 1 Station 5.
Scintillating Fiber and Ribbon Production Update Alan Bross MICE Tracker Phone Meeting September 8, 2006.
Takashi Matsushita Imperial College T. Matsushita 1 Quality Assurance; status 18/05/06.
MICE Video MTG 9/25/2002 MICE Fiber Tracker Design Update Requirements and Proposed Detector Implementations A. Bross Fermilab.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
Cosmic Ray Analysis 1M.Ellis - CM23 - Harbin - 15th January 2009  Not enough time to go into detail, so just a quick summary of the status since CM22:
T. Matsushita 1 Station 5 as of 28 Nov 2006 All planes bundled All planes connectorised All planes glued Fibres potted Ready for cut/polishing Shift takers;
Tracker QA P. Kyberd, M. Takahashi 1 Quality Assurance for SciFi Tracker (Brunel, FNAL, IC, Osaka) A status report: A procedure for ensuring the quality.
Takashi Matsushita Imperial College T. Matsushita 1 Engineering (Mechanical) Geoff Barber.
Final Tracker Connection Map Version 1 1 Connection Mapping for the Final Mice Trackers Geoff Barber November 2005 TM – 03 Jul 06 TM – 21 Jul 06.
Takashi Matsushita Imperial College T. Matsushita 1 Full tracker station assembly/QA, schedule.
Takashi Matsushita Imperial College T. Matsushita 1 Station5 in UK.
Scintillating Fiber, Ribbon Production, Cryo Update Alan Bross MICE Tracker Meeting IC November 8, 2006.
G.Barber Mice Tracker Mechanical Progress Imperial Tracker Update Contents:- Components Station Layout Light Guide Map QA Patch Panel Alignment.
Mantle Clock. Beginning Steps Cut 2 piece 20 x 5 to make the 2 sides and top/bottom Cut 1 10 ¾ and 1- 9 from each 20 piece. This will make a side and.
MICE Tracker Update Alan Bross NFMCC Friday Meeting November 10, 2006.
Takashi Matsushita Imperial College T. Matsushita 1 Tracker Status.
Data Acquisition and Error Analysis for Pepperpot Emittance Measurements Simon Jolly Imperial College DIPAC ‘09.
Waveguide for Station 5 M. Yoshida (Osaka Univ.).
1 SciFi Results and Comparison Malcolm Ellis, for the MICE Scintillating Fibre Group Abingdon, 31 st October 2003.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
Tracker QA Paul Kyberd Quality Assurance A status report: A procedure for ensuring the quality of the finished tracker has been designed following our.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
G.Barber: Mice-International Meeting Plans for Sci-Fi Prototyping. Contents:- Mechanical Layout of Sci-Fi Design of the Fibre Optic Connectors.
Sci-Fi Tracker: Progress Report Malcolm Ellis, MICE Video Conference Wednesday 6 th October 2004.
Fiber Tracker Update Edward McKigney Imperial College July 3 rd, 2002.
MINERvA Mini-Review Debbie Harris Jeff Nelson Kevin McFarland Jeff’s slides version 1.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
ECAL LED monitoring system upgrade Pavel Shatalov ITEP, Moscow, Russia Yuri Guz IHEP Protvino, Russia.
Takashi Matsushita On behalf of IC/Brunel team Imperial College T. Matsushita 1 Preparation for station five Construction/bundling/connectorisation.
All DØ Meeting, 12/01/00 Central Fiber Tracker Light Guide Performance Thomas Nunnemann Fermilab 90 days before RunII … (a.k.a. 12/01/00)
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
Takashi Matsushita Imperial College T. Matsushita 1 Station5 Assembly/QA status, schedule.
Light Loss Tests Update Aron Fish 22/02/06 Mice Tracker Phone Conference.
Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06.
1M. Ellis - 17th May 2007 SciFi Decoding (Everything you never wanted to know but couldn’t avoid going over and over)  VLSB Data (unpacking to AFE, MCM,
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
David Bailey Gluing. Silicon /pcb assembly Previously Using Sony Robot and precision dispenser Have established acceptable glue dot parameters Dot electrical.
Tracker Summary Alan Bross MICE CM17 CERN February 25, 2007.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
M. Takahashi, 21 January, 2016 Station Acceptance (SA)
Final Tracker Connection Map Version 1 1 Connection Mapping for the Final Mice Trackers Geoff Barber November 2005 TM – 03 Jul 06 TM – 21 Jul 06.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration Installation requirements & Procedure.
T. Matsushita 1 Scintillating fibre tracker The scintillating fibre tracker reconstructs muon tracks before and after the MICE cooling section in 4 T magnetic.
Glenn Lopez P0Dule Production Planning. Glenn Lopez Overview Eventually want a detailed procedure for P0Dule production Workspace layout is efficient.
1 Light Yield results from the KEK tracker test using G4MICE M. Ellis Tracker Phone Meeting 25 th January 2006.
MICE Phone Meeting 26 October Status report of Waveguides for Station5 Hideyuki Sakamoto Contents Review of production process Present status Plans.
G.Barber Mice Tracker Mechanical Progress Tracker Update Contents:- Components Station Layout Light Guide Map QA Patch Panel Alignment of Tracker.
T. Matsushita 1 News Ribbons - i Inspection at IC All five ribbons have production date Two ribbons have mold ID + production ID (e.g. mold4#1) One ribbon.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Date of download: 5/27/2016 Copyright © 2016 SPIE. All rights reserved. Schematic diagram of experimental setup. During the measurement, a frog or salamander.
M.Taguchi and T.Nobuhara(Kyoto) HPK MPPC(Multi Pixel Photon Counter) status T2K280m meeting.
20 April 2007MICE Tracker Phone Meeting1 Analysis of cosmic/self-triggerd data of station 5 Hideyuki Sakamoto MICE Tracker Phone Meeting 20 th April 2007.
T. Matsushita 1 QA: Fibre Counting Software 1. Take CCD image of comb/connector 2. Cut noise 3. Find bundles: Nearest Neighbour Clustering, merge clusters.
ATLAS pixel module assembly flow
Aron Fish Imperial College Mice Video Conference 01/02/06
Decoding….
Scintillating Fiber/Clear Fiber QA and Ribbon Production
Pixel module assembly tooling
Presentation transcript:

Takashi Matsushita Imperial College T. Matsushita 1 Quality Control of Station Assembly

T. Matsushita 2 Stations built so far Prototype stations 1 – 4; had problems: Did not know which channel is the centre of the station Lots of problems on channel mapping Light loss due to hole mis-alignment at optical connectors Fifth station – the first production version for trackers Built with new procedure that incorporates quality control to rectify any errors occurred during manufacturing. Improvements: Centre fibre clearly marked during ribbon production Optical connector hole alignment checked Number of bundles in a connector checked Number of fibres in a bundle checked Sequence of fibres checked Should have rectified problems encountered for stations 1 – 4, yet to be confirmed

T. Matsushita 3 Station assembly overview First doublet-layers are manufactured at FNAL 350  m diameter fibres are laid-out on a mold with groove pitch of 426  m; 1491 fibres used per doublet-layer Then make bundles of seven fibres, put them through optical connectors, then layers stacked and glued Quality Control before gluing them together Centre fibre

T. Matsushita 4 Bundling - i Make bundle of seven fibres starting from the centre fibre Seven fibres held together with rubber tube => single read-out channel “comb” is used for bundling and QC procedure; bundles are stacked in grooves of the comb, channel map defined bundles of four columns ( or ) for one connector

T. Matsushita 5 Bundling - ii

T. Matsushita 6 Connectorisation - i A 22 way optical connector mates seven scintillating fibres with one clear fibre waveguide; alignment of connector holes at scintillating fibres and clear fibres sides are checked with ‘go/no-go gauge’ The scintillating fibre bundles are threaded through one of 22 holes of optical connector Connectorisation mapping for view X

T. Matsushita 7 Connectorisation - ii “Bridge” a tool for QC Fibre radius guide is used for connectorisation Bridge with connectors in place

T. Matsushita 8 QC - setup Bundling/Connectorisation most labour intensive, source of errors We perform QC step after bundling/connectorisation with the setup shown Translation stage LED (20 mW, = 405nm) / optics Doublet layer CCD

T. Matsushita 9 QC– counting - i First number of bundles for a connector as well as number of fibres in a bundle are checked after bundling and connectorisation CCD images of one connector worth of bundles are taken Fibre bundles in comb Fibre bundles in connector

T. Matsushita 10 QC – counting - ii Then software identifies bundles and fibres in the CCD image taken Notifies operator if there are any failures Twenty two bundles identified for comb/connector Seven fibres in a bundle identified with different colours Analysed comb imageAnalysed connector image

T. Matsushita 11 QC – scanning - i If counting QC was OK, move on to fibre sequence check by LED scanning Scan fibre plane with UV LED at 1250 micron/seconds Capture image at frames/seconds => 50 micron/frame [movie] Trace sum of CCD intensity for 9 pixels around fibre centre Bottom fibre signal distorted by the top fibres and glue Top fibres Bottom fibres UV LED

T. Matsushita 12 QC – scanning - ii Find frame # of intensity “peak” of each fibre; Frame # of leading edge = maximum intensity * 0.5 Frame # of trailing edge = maximum intensity * 0.5 Frame # of ‘peak’ = (leading edge + trailing edge)*0.5 Plot frame # of intensity ‘peak’ of each fibre; As frame # increases bundle # (channel number) increases, no overlaps of X Fibre sequence as well as bundle order should be OK before gluing a ribbon Max. “peak” Each X corresponds to ‘peak’ Seven X in each bundle

T. Matsushita 13 QC – scanning - iii Samples of errors identified during assembly Fibre swap between bundles 17&18 and 19&20 Wrong bundle order

T. Matsushita 14 QC – scanning - iv Time interval of each ‘peak’ checked as well Negative interval if there is fibre swap between bundles mean = 4.24 frames => micron agrees with measured mold pitch of 426/2 micron

T. Matsushita 15 Point of no return - gluing Fix vacuum chuck, carbon-fibre station frame to gluing jig Then glue them together

T. Matsushita 16 Potting & polishing Pot fibres to connectors, then apply glue to stiffen fibres then cut and polish Apply glueCut fibres After polishing

T. Matsushita 17 Summary New station assembly procedure with QC process incorporated worked out to overcome problems seen in prototype stations Station 5 built with new manufacturing procedure, which proven to work micron fibres successfully bundled and connectorised by hand Ready for test with read-out Station assembly is underway with the new assembly procedure