19/05/10FV 1 HyTec crate – DCS integration issues.

Slides:



Advertisements
Similar presentations
March 16, 2004Alice controls workshop, S.Popescu Low Voltage and High Voltage OPC status and plans.
Advertisements

1 Basic Installation and GUI Tech Basic Installation and GUI : Objectives  Installing the Quadro  Configuring the Quadro  Installing IP phones.
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
Building Your Own Firewall Chapter 10. Learning Objectives List and define the two categories of firewalls Explain why desktop firewalls are used Explain.
9.1 © 2004 Pearson Education, Inc. Exam Managing and Maintaining a Microsoft® Windows® Server 2003 Environment Lesson 9: Installing and Configuring.
Hands-On Microsoft Windows Server 2003 Networking Chapter 7 Windows Internet Naming Service.
Understanding Networks I. Objectives Compare client and network operating systems Learn about local area network technologies, including Ethernet, Token.
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment Chapter 8: Implementing and Managing Printers.
70-293: MCSE Guide to Planning a Microsoft Windows Server 2003 Network, Enhanced Chapter 7: Planning a DNS Strategy.
Maintaining and Updating Windows Server 2008
70-291: MCSE Guide to Managing a Microsoft Windows Server 2003 Network Chapter 14: Troubleshooting Windows Server 2003 Networks.
A+ Guide to Software, 4e Chapter 11 Supporting Printers and Scanners.
1 Chapter Overview Introduction to Windows XP Professional Printing Setting Up Network Printers Connecting to Network Printers Configuring Network Printers.
SMS Gateway OZEKI NG Document version: v Adding SMS functionality to SysAid.
Choose and Book Installing Security Broker (IA) client.
SMS Gateway OZEKI NG Document version: v Adding SMS functionality to Sharepoint.
Chapter 14 Managerial issues in networking. Overview Network design Network management – Hardware – Software Technology standards Role of government and.
1. 2 How do I verify that my plant network is OK? Manually: Watch link lights and traffic indicators… Electronically: Purchase a SNMP management software.
Microsoft Windows 2003 Server. Client/Server Environment Many client computers connect to a server.
Hands-On Microsoft Windows Server 2008 Chapter 1 Introduction to Windows Server 2008.
11 NETWORK PROTOCOLS AND SERVICES Chapter 10. Chapter 10: Network Protocols and Services2 NETWORK PROTOCOLS AND SERVICES  Identify how computers on TCP/IP.
OPC and EPICS M. Clausen EPICS workshop Trieste’99 1 OPC Introduction and EPICS Perspectives Matthias Clausen.
Module 10 Configuring and Managing Storage Technologies.
Hands-On Microsoft Windows Server 2008
TUTORIAL # 2 INFORMATION SECURITY 493. LAB # 4 (ROUTING TABLE & FIREWALLS) Routing tables is an electronic table (file) or database type object It is.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
Microsoft Internet Security and Acceleration (ISA) Server 2004 is an advanced packet checking and application-layer firewall, virtual private network.
Managing Windows Server 2008 R2 Lesson 2. Objectives.
Chapter 13 – Network Security
Network Monitoring using OPC - (OLE) for Process Control Project Advisor : Dr. Chung-E-Wang Prepared By: Bhumi Patel.
Automating IP Address Assignment Ing. Iván Méndez Alvarado RAI TECNOLOGIA SU SOLUCION INTEGRAL.
1 Chapter Overview Using the New Connection Wizard to configure network and Internet connections Using the New Connection Wizard to configure outbound.
Network Management Tool Amy Auburger. 2 Product Overview Made by Ipswitch Affordable alternative to expensive & complicated Network Management Systems.
(Preliminary) Results of Evaluation of the CCT SB110 Peter Chochula and Svetozár Kapusta 1 1 Comenius University, Bratislava.
S.Sergeev (JINR). Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system.
PC Maintenance: Preparing for A+ Certification Chapter 22: Setting Up a Windows Network.
INSTALLATION HANDS-ON. Page 2 About the Hands-On This hands-on section is structured in a way, that it allows you to work independently, but still giving.
MCTS Guide to Microsoft Windows Server 2008 Applications Infrastructure Configuration (Exam # ) Chapter Four Windows Server 2008 Remote Desktop Services,
Computer Emergency Notification System (CENS)
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
SNMP Simple Network Management Protocol SNMP Simple Network Management Protocol Haris Ribic.
A powerful network monitoring system
JCOP/DCS Plans for HW Upgrade A. Augustinus (ALICE), C
Information Security 493. Lab # 4 (Routing table & firewalls) Routing tables is an electronic table (file) or database type object that is stored in a.
ISEG HV power supplies for NA62 R. Fantechi 6/4/2011.
Source Controller software Ianos Schmidt The University of Iowa.
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
A guide to file sharing on Windows XP Peer to Peer File Sharing.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
European Organization for Nuclear Research DCS remote control in NA62: Equipment & Control Integration. Mathias Dutour NA62 Collaboration 9th December.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
JCOP Framework and PVSS News ALICE DCS Workshop 14 th March, 2006 Piotr Golonka CERN IT/CO-BE Outline PVSS status Framework: Current status and future.
Maintaining and Updating Windows Server 2008 Lesson 8.
COMP1321 Digital Infrastructure Richard Henson March 2016.
CACI Proprietary Information | Date 1 PD² v4.2 Increment 2 SR13 and FPDS Engine v3.5 Database Upgrade Name: Semarria Rosemond Title: Systems Analyst, Lead.
SemiCorp Inc. Presented by Danu Hunskunatai GGU ID #
Fixing Windows 10 Automatic Updates Install Problem
Setting up data redundancy on DSS V6 with Asynchronous Data Replication and local Backup Software Version: DSS ver up50 Presentation updated: October.
The Maraton LV system Michela Lenzi INFN Firenze Thanks to V. Bocci, P. Ciambrone, A. Sciubba LV Power Supply RCM AC/DC converter.
Hands-On Microsoft Windows Server 2008
CV PVSS project architecture
Designing and Installing a Network
Introduction to Computers
Radiation- and Magnet field- Tolerant Power Supply System
How to Fix Brother Printer Offline Status with Free Brother Printer Support? VISIT WEBSITE.
Training Module Introduction to the TB9100/P25 CG/P25 TAG Customer Service Software (CSS) Describes Release 3.95 for Trunked TB9100 and P25 TAG Release.
Chapter 11 Supporting Printers and Scanners
CS4470 Computer Networking Protocols
Presentation transcript:

19/05/10FV 1 HyTec crate – DCS integration issues

HyTec (HyTec Electronics, UK) crate VF2 19/05/10 Slots for: TELL1 VME NIM ? Control : WIENER CML2 card (Control, Measurement and Data Logging System)

Standard crate (or any other equipment) control in PVSS VF3 19/05/10 CRATE OPC server PVSS OPC client

HyTec crate control From WIENER CML1 board manual: “ 12. OPC Server A server according to OPC Data Access V2.05 is optional available. OPC (OLE for Process Control) allows fast and secure access to data and information under Windows operating systems. As an industry-spanning, multi-vendor software interface, OPC minimizes connection and maintenance overheads. This server, running on a Computer with the Microsoft Windows XP operating system, enables access to all controllers which are connected to the network (TCP/IP). It is possible to access from any OPC Client application to the data of one or more servers encapsulating the properties specific to the server and type of communication commissioning support due to automatic scanning of the network and registration of communication stations restricting access rights by the underlying Microsoft DCOM. The details of the OPC server can be found in the manual delivered with the OPC server software. “ VF4 19/05/10

From HYTEC to NA /05/2010, Peter Marshall (HYTEC) : “ I have spoken at length to Wiener and their position is that they do not want to support OPC on this CML02 card as fitted to the TELL1 crate. There are two main reasons for this: First, their existing OPC server is for their Maraton low voltage power supplies and works over Ethernet or for their crates which work over Canbus. This implementation (for Ethernet) therefore has more stuff to monitor than on the Maraton units, hence the lack of compatibility. Second, they are producing a new card for this function (although the CML01/2 will still be available) and do not want to spend time on the CML01/2. We are intending to make you an offer to produce an OPC server for these TELL1 crates; can we assume that your client is PVSS2? ” VF5 19/05/10

From HYTEC to NA /05/2010, Peter Marshall (HYTEC) : Our proposal is based on a package from ICONICS called DataworX. This provides an SNMP (Simple Network Management Protocol) driver on one side discovering suitable devices and obtaining data from the based on the MIB (Management Information Dase), and an OPC server on the other. Data from the SNMP targets is placed in the server fields based on user-provided names using tags. We will configure this package to talk to at least one crate and provide documentation to enable others to be added. We would require from you a specification showing the required OPC layout and also confirming that we can use fixed IP addresses, otherwise the task becomes much more complicated! We estimate a total cost for this approach to be in the region of 5000 UK pounds VF6 19/05/10

From EN/ICE to NA62 Mathias Philippe Dutour (EN/ICE): “I checked with Wiener's engineer the OPC control solution for the CML01 interface… Wiener explained me that the basic CML1/CML2 is a relatively inexpensive product (intended to be used in the low end crate segment). And that if Wiener decides to add OPC accessibility to the basic CML01 (which they will do only if a reasonable number of devices are requested), this "OPC-Option for CML01" will have to be ordered separately.” VF7 19/05/10

From EN/ICE to NA62 11/05/2010, Piotr Golonka (EN/ICE) : Gentlemen, should you decide to ask HyTec to develop the OPC server from scratch, please bear in mind the following: First of all, the development of a OPC Server software may be a lengthy process, in particular to reach the desired level of performance and stability, then to validate it for production systems. Our experience with other hardware-specialized companies tend to show that the quality of software they provide is often mediocre, in terms of stability, performance and also scalability. It may take many iterations to have the software brought to acceptable level, and this takes long months and years of time. VF8 19/05/10

From EN/ICE to NA62 11/05/2010, Piotr Golonka (EN/ICE) (continuation) : There is also a question of long-term maintenance of such custom OPC software: o In particular to have versions compliant with future versions/updates of the operating systems delivered in acceptable timescales (eg. make a version compatible with Windows XP, then for Windows 7 once it is adopted at CERN, then for any future service-packs and versions of Windows). We would not like to end up in a deadlock situation where we cannot upgrade the operating system (or apply a security patch), because we will not get the appropriate upgrade of the OPC server software. o Similarly, an upgrade of the OPC technology to OPC-UA (already present in the latest version of PVSS, not yet used at CERN), would require additional effort on HyTec side (or rather a complete re-write of server software in OPC-UA architecture). Note also that currently the EN/ICE resources for validating non-standard OPC software are very limited. Last but not least, the integration of the new OPC server within PVSS and final controls application is an additional effort and requires resources to be allocated on our side. VF9 19/05/10

From EN/ICE to NA62 11/05/2010, Piotr Golonka (EN/ICE) (continuation) : As discussed at DCS meetings, EN/ICE strongly suggests choosing a standard solution that is already validated and centrally supported at CERN (hardware- and software- wise), i.e. Wiener. VF10 19/05/10