CTF3 Probe Beam G. A. Blair Royal Holloway Univ. London CTF3 Meeting, CERN 30 th November 2005 Introduction – UK Context Draft Proposal Future prospects.

Slides:



Advertisements
Similar presentations
Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole ASTeC Research Strategy Mike Poole Director.
Advertisements

LC-ABD Phase 2 Outcome G. A. Blair, RHUL LC-ABD Meeting RHUL 12 th April 2007 PPRP Meetings Feedback from PPRP Outcome.
Accelerator and Beam Delivery The LC-ABD (Linear Collider: Accelerator and Beam Delivery) consortium is a group of UK institutes aiming to develop new.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 Update on CTF3 Operations and schedule This time I will try to give a more complete.
AS Diagnostic Collaboration Mark Boland
Drive Beam and CTF 3 International Workshop on Linear Colliders 2010 October 22, 2010 Erik Adli, Department of Physics, University of Oslo and CERN Bernard.
New Electron Beam Test Facility EBTF at Daresbury Laboratory B.L. Militsyn on behalf of the ASTeC team Accelerator Science and Technology Centre Science.
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
Linac e+ source for ILC, CLIC, SuperB, … Vitaly Yakimenko, Igor Pogorelsky November 17, 2008 BNL.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
Philip Burrows LCUK Meeting, Oxford 29/01/04 UK LC-ABD Collaboration UK Beam Delivery System Plans Philip Burrows Queen Mary, University of London.
Low Emittance RF Gun Developments for PAL-XFEL
D. Angal-KalininEUROTeV Annual Meeting, DESY WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, STFC, Daresbury Laboratory 4 th EUROTeV Annual.
IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini1 CTF3 Probe Beam Status 1.
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Pavel Karataev John Adams Institute for Accelerator Science At Royal Holloway, University of London oPAC Advanced School on Accelerator Optimisation 7-11.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
27 MAY 2008NANOBEAM A laser-wire scanner for the ATF extraction line Alexander Aryshev, Stewart Boogert, Grahame Blair, Gary Boorman a Lawrence.
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
Non-scaling FFAGs in UK EMMA Requirement for (at least) one non-scaling FFAG clear: - multi-resonance crossings - huge/tiny momentum compaction - asynchronous.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
CLIC work packages CTF3-003 (TBL+) CLIC0-001 (CLIC DB injector) CLIC0-002 (photo injector option for CLIC DB injector.
P I T Z Photo Injector Test Facility Zeuthen Design consideration of the RF deflector to optimize the photo injector at PITZ S.Korepanov.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
ATF status M. Ross October 15, 2004 The ATF is the largest test facility built exclusively for linear collider RD –Utility not reduced by the selection.
Erik Adli CLIC Project Meeting, CERN, CH 1 Erik Adli Department of Physics, University of Oslo, Norway Input from: Steffen Doebert, Wilfried Farabolini,
1 CTF3 collaboration meeting Jan 2008 G.Geschonke Status of CTF3 G.Geschonke CERN.
Injector Options for CLIC Drive Beam Linac Avni Aksoy Ankara University.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
S. Bettoni, R. Corsini, A. Vivoli (CERN) CLIC drive beam injector design.
Interface between TAC SR and SASE FEL Possibility for testing CLIC structure Avni AKSOY Ankara University.
Summary of XFEL uses for CALIFES Erik Adli (University of Oslo, Norway)
Oleksiy Kononenko CERN and JINR
Main and Drive Beam Dynamics Working Group Caterina Biscari, Daniel Schulte Attending people ~ 20 ± 5 Presentations ~ 18 (7 from CERN) CL IC 07.
Awake electron beam requirements ParameterBaseline Phase 2Range to check Beam Energy16 MeV MeV Energy spread (  ) 0.5 %< 0.5 % ? Bunch Length (
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
Drive Beam Injector Drive Beam Accelerator X 2 Delay Loop X 5 Combiner Ring Two-beam Test Area 3.5 A  s 150 MeV 35 A ns 150 MeV 150 MV/m 30.
B. Foster - Birmingham 7/11 Linear Colliders 1 Future Linear Colliders Brian Foster (GDE - Hamburg/DESY/Oxford) Birmingham Town Meeting.
X-band Based FEL proposal
CLIC DB injector facility, photo-injector option studies LCWS, Granada, September 26 th -30 th,2011Steffen Döbert, BE-RF  CLIC DB injector  Thermionic.
R. Corsini CLIC work-package planning meeting 2-3 November 2011 Introduction to the session.
Frank Stulle, ILC LET Beam Dynamics Meeting CLIC Main Beam RTML - Overview - Comparison to ILC RTML - Status / Outlook.
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
CALIFES A proposed electron beam test facility at CERN
CLIC work program and milestones
Sara Thorin, MAX IV Laboratory
In collaboration with P. N. Burrows, A. Latina and D. Schulte
CLEX* Status and Plans CTF3 complex CLEX
Status of the CLIC main beam injectors
Have a chance to operate your own beam at CERN
Oversea collaborators
CTF3 Collaboration Technical Meeting January 2008
Developments on Proposed
Instrumentation CALIFES ideal for tests and development that requires frequent access to test setup. CERN BI members already using CALIFES and want to.
Measurements, ideas, curiosities
Advanced Research Electron Accelerator Laboratory
CLIC damping rings working plan towards the CDR
Explanation of the Basic Principles and Goals
CLIC Feasibility Demonstration at CTF3
Proposal for Smith-Purcell radiation experiment at SPARC_LAB
Presentation transcript:

CTF3 Probe Beam G. A. Blair Royal Holloway Univ. London CTF3 Meeting, CERN 30 th November 2005 Introduction – UK Context Draft Proposal Future prospects

CTF3 Meeting, CERN, Nov05 G. Blair, RHUL2 UK funding for accelerator science for particle physics UK funding agency, PPARC, secured from Govt. £11M for ‘accelerator science’ for particle physics, spend period April 04 – March 07 Bids peer-reviewed and preliminary new allocations made Oct : ILC-Beam Delivery £7.2M from PPARC + £1.5M from CCLRC 2 university-based accelerator institutes

CTF3 Meeting, CERN, Nov05 G. Blair, RHUL3 Accelerator Institutes 2 New institutes for Accelerator science: Cockcroft: Lancaster, Liverpool, Manchester - based at DL campus. 12 New academic positions. John Adams Institute: Oxford, RHUL: - based at both institutes 6 new academic positions.

CTF3 Meeting, CERN, Nov05 G. Blair, RHUL4 Overview of Projects

CTF3 Meeting, CERN, Nov05 G. Blair, RHUL5 UK LC-ABD Work Packages 1. 1.Lattice design and beam simulations (D. Angal-Kalinin) 2. 2.Advanced beam diagnostics (G. Blair) 3. 3.Alignment and survey (A. Reichold) 4. 4.Final focus luminosity stabilisation and spectrometry (P. Burrows) 5. 5.e+ undulator, crab cavity system, wakefields/collimators (M. Poole) Major programme of beam-based work ongoing at ESA (SLAC), ATF (KEK). Time to investigate possibilities of next funding round, including CTF3

CTF3 Meeting, CERN, Nov05 G. Blair, RHUL6 A Conceptual Proposal for a Diagnostics Line at the CTF3 Probe Beam Draft th September G. A. Blair, John Adams Institute at RHUL, Egham. Surrey. TW20 0EX, UK. H. Braun, CERN, CH-1211, Geneva, Switzerland 1. Executive Summary The current planning phase of the CLEX area at CTF3 has revealed an excellent opportunity to build a flexible Instrumentation Test Beam (ITB), at a time when such an international facility is in high demand and short supply, to address both ILC and CLIC instrumentation issues. This proposal addresses some preliminary baseline requirements of the ITB, presents initial cost estimates and timelines, and identifies some key diagnostics tests that could be addressed.

CTF3 Meeting, CERN, Nov05 G. Blair, RHUL7 Drive Beam Injector Drive Beam Accelerator  2 Delay Loop C=42 m  5 Combiner Ring C=84 m Two-Beam Tests (CLEX area) 30 GHz High Power Test Stand IbIb 140 ns t 35 A b =15 GHz IbIb 140 ns t 7 A b =3 GHz IbIb 1400 ns t 3.5 A b =1.5 GHz CTF 3  Demonstration of CLIC drive beam generation  30 GHz power for 30 GHz structure testing  Two beam acceleration  Test bed for CLIC technology developments CLIC key technology issues addressed in CLIC Test Facility (CTF3)

CTF3 Meeting, CERN, Nov05 G. Blair, RHUL8

CTF3 Meeting, CERN, Nov05 G. Blair, RHUL9

CTF3 Meeting, CERN, Nov05 G. Blair, RHUL10 D F D F D F D F D F D F D F D F LIL-ACS FDD F DFD DFD D F DUMP 8 m 2m D F D F D FDF D D F D DUMP D F D 40 m D F D 1m wide passage all around TBL 30 GHz Teststand Probe beam injector DUMP Layout for CLEX floor space DUMP D F D FF D D F D Instrumentation Testbeam 3m 6 m 13 m 15 m D F D D F D CLIC experimental area (=CLEX), construction of new building in Test beam line (TBL) to study drive beam decelerator dynamics, stability and losses - Two beam test stand

CTF3 Meeting, CERN, Nov05 G. Blair, RHUL11 preparation chamber rf gun cavity compression acceleration LIL sections beam-dump quadrupoles focusing coils RF deflector beam profile monitor (emittance, bunch length) (intensity, position) monitor steerer klystron spect. magnet Laser RF pulse compression Probe beam linac with rf photo gun and velocity bunching ParametersMotivationEnergy ~ 200 MeV Avoid beam disruption in high RF fields norm. rms Emittance < 20  mm mrad Fit in 30 GHz structure acceptance Energy spread < ± 2% Measurement resolution Bunch charge 0.5 nC CLIC parameters Bunch spacing ns Number of bunches 1 – 64 Measure 30 GHZ structure transients rms bunchlength < 0.75 ps Acceleration with 30 GHz

CTF3 Meeting, CERN, Nov05 G. Blair, RHUL12 CTF3 Schedule

CTF3 Meeting, CERN, Nov05 G. Blair, RHUL13 Representative Probe Beam Parameters Energy~ 200 MeV Rep Rate5 Hz Norm. rms Emittance< 20 π mm mrad Energy Spread<±2% Bunch Charge0.5 nC Bunch Spacing0.333 ns Number of Bunches1-64 RMS Bunch Length<0.75 ps

CTF3 Meeting, CERN, Nov05 G. Blair, RHUL14 Robust and reliable BPM-based energy spectrometry for the purposes of ILC/CLIC fast extraction schemes.  Hardware development and tests of fast extraction kicker and extraction line.  Deflecting cavity R&D for beam diagnostics; this will require additional RF provision, possibly derived from the probe beam klystrons.  Beam phase space measurement with electron bunch longitudinal sizes similar to that of the ILC.  Collimator wakefield studies.  High performance BPM R&D.  Tests of engineering prototypes of a wide range of instrumentation developed for ILC/CLIC over the coming years. Possible activities at the Instrumentation Test Beam

FUTURE FUNDING OF LC-ABD Current PPARC support ends in March 2007 Future proposed programme will need to be peer reviewed by the end of 2006 to ensure continuity. The proposal for the next phase will need to take into account overall international status, UK role/responsibilities and timescales for TDR etc. Funding for accelerator R&D awarded in SR2002 has been built into the PPARC baseline. Linear collider R&D is given high priority by PPARC. There are long term commitments to the two accelerator R&D centres.

CTF3 Meeting, CERN, Nov05 G. Blair, RHUL16 LARGE CAPITAL FACILITIES FUND Linear collider is a bid from PPARC to the OST Large Capital Facilities Fund – separate funding line retained by OST for capital construction projects. Prioritisation exercise currently underway of bids from all Research Councils – outcome not yet known but if given high priority, any funding could be for the construction phase only. Discussions with OST continue. PPARC will have to balance the need to maintain momentum, with the funds available and other calls on the PPARC budget.

CTF3 Meeting, CERN, Nov05 G. Blair, RHUL17 Summary The CLEX beam area provides an opportunity to develop a new European test facility. Funding is uncertain at present. UK industry and academic institutions are currently being consulted. Please input new ideas for instrumentation and collaboration.