MERCADOS ENERGY MARKETS INTERNATIONAL Finding new paths for the energy market Consultancy Support to the HERC Consumer Aspects – Preliminary Findings of.

Slides:



Advertisements
Similar presentations
1 CAPACITY BUILDING ON ELECTRICITY REFORMS IN BANGLADESH, INDIA AND NEPAL RAJESH KUMAR.
Advertisements

Consumer protection and service quality improvement mechanisms Prayas - EGI Skill-share workshop for Tajikistan and Kyrgyzstan Delegates November 16-18,
RIGHT TO REPRESENTATION
Brian A. Harris-Kojetin, Ph.D. Statistical and Science Policy
Energy Efficiency in India – Role of CSOs Gaurav Shukla CUTS International, India Regional Training Workshop (June 27-29, 2012) Beijing, China Advanced.
Guarding Public Interest Highlights on Baseline Survey on Policing Standards and Gaps in Kenya September 11, 2013.
On implementation of RTI Act 2005: Government’s initiatives Department of Personnel and Training November 4, 2008, Delhi.
1 Demand side management and Renewable Energy In India: Capacity Building of CSOs DREC PROJECT Gujarat Chapter Mid Term Review Meeting 6 th January 2012.
Industrial segment Customer relationship assessment study Customer Satisfaction Management & Measurement, IMRB International Field work duration Feb 2013.
. REFUSE MEANS – MONEY AN EFFORT BY DRDA KURUKSHETRA.
SOIL HEALTH MANAGEMENT FOR ENHANCING PRODUCTIVITY
Training Resource Manual on Integrated Assessment Session UNEP-UNCTAD CBTF Policy Responses and Follow-up Session 4.
Enhancing Participation of Consumers in Regulation Reforms in Electricity in Kenya Agnes Wachie 21 st April 2013 Nairobi Safari Club Hotel.
Promoting Energy Efficiency In Buildings in Developing countries.
Improving the Energy Efficiency of the Heat and Hot Water Supply Presenter: Bayramgul Garabaeva, Programme Officer Decentralization and Community Development.
Economic Impact of Poor Power Quality on Industry Nepal Adopted from The Internet for Educational Purpose Sudaryatno Sudirham October 2003.
Regulation & Implementation of Mobile Internet Quality of Service: Role & Scope of Civil Society Organisations PRESENTATION BY: NEHA TOMAR, RESEARCH ASSOCIATE,
A PROCUREMENT ASSESSMENT MODEL Joel Turkewitz World Bank April 2003.
A PILOT PROJECT ON CAPACITY BUILDING ON ELECTRICITY REFORMS IN BANGLADESH, INDIA AND NEPAL (RESA PROJECT) Findings of the Project RESA — Nepal Dhrubesh.
+ PROJECT BACKGROUND: KENYA THE NEED FOR CONSUMER PARTICIPATION IN THE REFORMS PROCESS OF THE ELECTRICTY SUB-SECTOR Susanne Rabisch, CUTS Nairobi.
NATIONAL STRATEGY FOR WSP IMPLEMENTATION IN GHANA. Nii Okai Kotei Director, Water Public Utilities Regulatory Commission, Accra, GHANA IWA Africa Region.
Prayas Energy Group, India Regulatory process to enhance transparency and accountability: examples from India Bishkek, September 2011 Presentation By Prayas.
The role of ERE in Costumer Protection Eduard Elezi Albanian Regulatory Authority ERE Conference “Albanian Energy Sector, Challenges and Regulation” Tirana,
Electricity Reforms in Bangladesh
Empowering People The Electricity Governance Initiative PRAYAS- PUNE ENERGYGROUP Smita Nakhooda 11 May 2007 New York CSD 15.
Energy Regulatory Partnership Program of the National Association of Regulatory Utility Commissioners with the National Commission Exercising State Regulation.
THE CASE OF KENYA SUSANNE RABISCH, CUTS NAIROBI RESEARCH METHODOLOGY.
ENHANCING CONSUMER PARTICIPATION IN REGULATORY REFORMS IN ELECTRICITY SECTOR:INITIATIVE TO EMPOWER CONSUMERS FOR INCLUSIVE GOVERNANCE IN ELECTRICITY SECTOR.
USING THE PUBLIC PROCUREMENT MODEL OF EXCELLENCE (PPME) TOOL TO IDENTIFY CAPACITY DEVELOPMENT NEEDS A PRESENTATION BY A.B. ADJEI CHIEF EXECUTIVE – PUBLIC.
Presented by: Dr Keya Ghosh, CUTS Calcutta Resource Centre কৃষিতে পাম্প চালাতে সমস্যা হচ্ছে, বিদু থাকছে না..... ছেলে মেয়ের পড়াশুনা.....
INTRODUCTION TO THE UNIDO/REEEP TRAINING MANUAL ‘SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA’ User Manual.
Association of Energy Regulators for Eastern and Southern Africa EgyptEra Electricity Market and Regulators Status in COMESA General Assembly Meeting Lusaka,
1 MID TERM REVIEW MEETING RESA PROJECT Overall Progress: Phase I RAJESH KUMAR, CUTS INTERNATIONAL.
PRESENTATION TO THE PORTFOLIO COMMITTEE ON PUBLIC SERVICE AND ADMINISTRATION Compliance with the Implementation of the Batho Pele Principle of Consultation.
Prayas Energy Group, India Transparency in Electricity Service Delivery: Billing, Quality of Service and consumer issues Bishkek, September 2011 Presentation.
Guidelines of Good Practice on customer cost surveys as an input for infrastructure development and its regulation Riccardo Vailati Co-chair CEER/ERGEG.
National Competition Policy and Economic Growth in India (ComPEG Project) July 2012 – December 2013 Terms of Reference for Sector Studies.
Consultancy Support to the Haryana Electricity Regulatory Commission Findings of a Consumer Survey and emerging recommendations 29 September 2010, Haryana.
Session 8: Statistical Infrastructure Joseph Ilboudo UNECA/ACS Workshop Review of RRSF Implementation.
1. 2 Thanks for keeping your mobile in silent mode.
UKRAINE GOVERNANCE ASSESSMENT Sigma Ukraine governance assessment PUBLIC PROCUREMENT Peder Blomberg.
Capacity Building on Electricity Reforms in Bangladesh, India and Nepal (RESA) Key Findings from India Capacity Building, Advocacy, Research & Networking.
CAPACITY BUILDING ON ELECTRICITY REFORMS IN BANGLADESH, INDIA AND NEPAL (RESA PROJECT) (RESA – Regulatory reforms in Electricity sector in South Asia)
1 CTO CONFERENCE ON “IMPLEMENTING WSIS ACTION PLAN” NAIROBI, KENYA, MARCH 2004 UGANDA’S REGULATORY INNOVATIONS By Patrick F. Masambu Executive Director,
Transforming Electricity Governance in India Consumer Participation and Protection in Regulatory Practice Daljit Singh, Independent Energy Policy Analyst.
Reliable Power Reliable Markets Reliable People Transition of Authoritative Documents – Information Session September 2009 Doyle Sullivan Evelyn Kelly.
Public Service Commission Presentation to the Portfolio Committee on Public Service and Administration 25 May 2007 Batho Pele Audits and Citizen Satisfaction.
INTEGRATING INDIGENOUS KNOWLEDGE (IK) INTO UGANDA’S POVERTY ERADICATION ACTION PLAN (PEAP) By Joyce N. Muwanga Assistant Executive Secretary Uganda National.
Future Activities: Design and Methodology Arnab Ganguly Project Coordinator CUTS Calcutta Resource Centre.
1 Planning for 2012 Project Activities Presented By- Ankur Brauah VIKSAT, Ahmedabad.
1 Constituency Building for Competition Reforms in West Africa Outputs, Outcomes and anticipated Impacts of the 7UP4 Project in The Gambia By: Omar Ousman.
PRESENTED AT THE STAKEHOLDERS FORUM ON QUALITY OF SERVICE AND CONSUMER EXPERIENCE LAICO REGENCY HOTEL Creating Space for Consumer Rights in.
Haryana Experience Shrikant Walgad CEO Haryana.  Population (in lakh)  Literacy rate (in %) TOTAL MALE % FEMALE % Literacy.
August 21 st, 2014 Deboshree Banerji, CUTS International Facilitating the Adoption of Regulatory Impact Assessment (RIA) Framework in India 1.
1 MEETING OF NFSMEC DEPARTMENT OF AGRICULTURE, HARYANA.
1 MID TERM REVIEW MEETING RESA MEETING RESA PROJECT: KEY OUTPUTS 1 st April, 2009 RAJESH KUMAR, CUTS INTERNATIONAL.
1 MID TERM REVIEW MEETING RESA MEETING Plan for Stage II 2 nd April, 2009 RAJESH KUMAR, CUTS INTERNATIONAL.
Energy Community Secretariat 1 25 th Customer Working Group Meeting ECS, Vienna 10 October 2013 CIRED C ONFERENCE 2013 R OUND T ABLE R EPORT Jasmina Trhulj.
Inter-American Development Bank BIMILACI 2007 QUALITY PROCUREMENT Third Party Review May 2007 Project Procurement Division.
1 MID TERM REVIEW MEETING RESA MEETING Achievements and Shortcomings 2 nd April, 2009 RAJESH KUMAR, CUTS INTERNATIONAL.
Presentation on Watershed Projects
Census Planning and Management for next Nigerian Census
Developing reporting system for SDG and Agenda 2063, contribution of National Statistical System, issues faced and challenges CSA Ethiopia.
NATA Foundation General Grants Program Process
MDM-PAB Meeting –HARYANA
Tracking Progress for Building Efficiency Accelerator
WATER REGULATORY AUTHORITY
The European Union’s programme for India
NATA Foundation General Grants Program Process
Presentation transcript:

MERCADOS ENERGY MARKETS INTERNATIONAL Finding new paths for the energy market Consultancy Support to the HERC Consumer Aspects – Preliminary Findings of the Consumer Survey CUTS International

Presentation 0utline ● Update of the assignment ● Objectives (Consumer Aspects Components) ● Overall approach ● Key findings of concept paper ● Consumer survey -Methodology -Questionnaire and data collection -Survey findings ● Recommendations ● Way forward

Current status of the assignment ComponentActivities CompletedOngoing Activities Component 1: Tariff Aspects ● Concept papers – on Generation, Transmission and Distribution MYT and Benchmarking ● Development of MYT Regulations – G, T, D ● Public Hearing ● Notification of Regulations Component 2: Intra-state ABT and Market Design ● Concept Paper on Market Design and Intra-state ABT ● Draft Regulations on Intra-state ABT under preparation ● Draft Regulations on Open Access also under preparation Component 3: Consumer Aspects ● Concept Paper on Consumer Aspects ● Survey Methodology and Questionnaire ● Execution of Survey ● Development of detailed report on survey findings ● Development of road map for Social Accountability and Consumer Involvement

Objectives ● Assess the scope and role of HERC in promoting consumer participation in the regulatory decision making process ● Review the state of consumer satisfaction in Haryana ● Assess the level of consumer awareness through a structured survey ● Identify key barriers for effective consumer participation in the State ● Recommend measures to promote adequate public participation in the sector

Overall Approach Review of literature, statutes, policy, regulations Comparison with best practices at national/international level Identification of gaps & scope for improvement (Concept Paper) Consumer perceptions: satisfaction and awareness (Survey) Summary and conclusions Development of roadmap for social accountability and consumer involvement

Concept paper: key findings ● Haryana: pioneer state to initiate reforms at state level ● Increased scope for consumer participation  Key regulations notified to empower consumers (CBR, SOPs, Supply code, CRM etc.) ● Constitution of Complaint Redressal Forums and Ombudsman- a step forward  HERC has processed all orders/regulations inviting consumers to participate

Concept paper: key findings (contd..) ● Weak participation in public hearings and inadequate geographical coverage ● Inadequate written comments on the draft proposals  Lack of effective consumer representation in SAC ● Lack of independence of Complaint Redressal Mechanism (controlled by Discoms)  No mechanism for effective monitoring of SOPs  Lack of awareness among consumers on key issues

Consumer survey: methodology

Consumer survey: sampling methodology ● Sampling methodology (Multi-stages, PPS, random) ● Geographical representation Each Discoms area was divided into 2 zones 2 districts chosen from each zone based on chosen criteria Criteria: Composite ranking score of Literary rate & consumption (Click for details)(Click for details) ● Most of the blocks covered in each sample districts ● Rural/urban ratio of the state was maintained - About 20% female respondents were targeted ● Agricultural sector (both metered and un-metered consumers covered)

Consumer survey: questionnaires and data collection ● Base questionnaire covered domestic, agricultural and commercial consumers ● Separate questionnaire prepared for industrial consumers ● Questionnaires translated into local language (Hindi) ● Two days training programme conducted for field investigators 17 th March: Mercados EMI Office, Gurgaon, 18 th March: Field Training and Visit (Sonipat) ● Interview method used for investigation Data collection though interviews: 18 th March-12th April 2010, Tabulation:13-22 nd April 2010

Consumer survey: methodology Sample size: ● Domestic, Agricultural & Commercial ~1100 (data collected 1134) ● Industry 200 (data collected 227) Consumer Category Number of respondentsPercentage shares StateUHBVNDHBVNStateUHBVNDHBVN Domestic % Agricultural %13%10% Commercial %9%11% Total %

Key survey findings: Domestic, Agricultural and Commercial Consumers

Metering & Billing: Key Findings ● About 71% consumers are satisfied with metering ● Agricultural consumers are more satisfied than domestic and commercial ● SOPs are not being implemented comprehensively ● Only a few consumers can understand Electricity bill completely ● Overall Score for metering & billing is not satisfactory

Quality of Service: Key Findings ● Overall score for quality of service is low ● Load shedding and poor voltage quality are major concerns ● Agricultural and domestic consumers facing more power cuts ● No prior information about load shedding to most of consumers ● Wider variations in QOS across the districts

Awareness on Reforms & Regulation: Key Findings ● The awareness level on reforms process is very low ● A very few consumers are aware of websites of HERC/utility ● None of the consumers visited website of HERC/utility ● Most of the consumers are aware of energy efficient equipment ● Overall score for information made available to consumers is low

Complaint Redressal Mechanism: Key Findings ● The awareness about CRF and Ombudsman is too low ● Because of poor awareness level, very few consumers approached to CRF ● Traditional method such as ‘personal visit’ still dominating for registering complaint ● Consumers are not given a reference number for the complaint registered with utility

Awareness on Tariff and Related Issues: Key Findings ● Majority of commercial consumers believe that tariff is High ● About two-third agricultural consumers observed the tariff Just Fair ● Majority of consumers not satisfied with the procedure for new connection ● Overall non transparent process in releasing new connection is a major concern

Key Findings: Industrial Consumers

Industrial consumers: Key findings ● 86% respondents (out of 14) were satisfied with meter testing procedure  74% of the respondents believe that the QOS remained unchanged over the last 3 years  93% consumers are receiving the electricity bills regularly ● 95% out of total respondents were not aware of remote metering technology

Industrial consumers: Key findings (contd...) ● 50% respondents experienced damage/burnt electrical equipment in last 3 years ● 95% respondents were never given advance information of power shut downs  Awareness about HERC: (functions-14%, regulation 6%)  Open access: 71% believe it can help in reducing cost  None of the consumers applied for open access

Comparative Analysis of Consumer Perceptions IndicatorIndustryDomestic etc. Satisfied with metering91%72% Satisfied with meter testing 86%29% Load shedding (for 10 hrs or more) 58%68% Aware of regulatory mechanism 14% (functions of HERC) 1.6% (aware about HERC) Received complaint no.40%13% View on tariff: High53%55% Awareness on EE53% (Star rating and labeling) 89% (CFL etc.)

Broad recommendations ● HERC to adopt a proactive role in promoting consumer participation ● Concrete steps should be taken to generate adequate awareness and involvement Process of public hearing to be held in rural areas as well Involvement and nurturing active consumers groups/CSOs Translation of key documents in vernacular ● Complaint redressal mechanism to be made more effective with generation of compliance reports from time to time  Effective compliance of standards of performance through appropriate measures (MYT Regulations)  Wider dissemination of key regulatory information including tariff filings

Next Steps ● Report on detailed consumer survey findings Calculation of consumer satisfaction index and sub-indexes (such as those related to metering, billing, etc) ● Preparation of Roadmap for Social Accountability Outlining the actions, key responsibilities and timelines for achieving increased consumer participation  Discussions with the Commission and select Consumer Associations  On the findings and the road map including aspects that require further elaboration  Mechanisms to improve consumer involvement and satisfaction  Finalization of the above documents  Suggested action points for key stakeholders and wider dissemination of key findings  Development of framework for sustained action: replication of consumer satisfaction survey

Mercados – Energy Markets International C/ Orense, 34, 8th floor – Madrid, Spain Tel.: (+34) Fax: (+34) Web: Thank You Mercados – Energy Markets India Private Limited Gurgaon: 206, Tower B, Millennium Plaza, Sec 27, Gurgaon – , India Tel.: (+91) Fax: (+91) Mumbai: 110 Master Mind I, Royal Palms, Aarey Milk Colony, Goregaon (East) Mumbai Tele fax: (+91) Web: /asiawww.mercadosemi.es CUTS International D-217, Bhaskar Marg, Bani Park Jaipur , India Ph: ; Fx: /2485; Em: Web: (Also at Geneva, London, Hanoi, Nairobi and Lusaka)

Supporting Data and Detailed Analysis

Metering & Billing

Key Finding 1: About 71 percent of consumers are satisfied with metering

Key Finding 2: For about 60 percent of the consumers, metering complaints were addressed more than a week later (Out of 127 who registered a meter related complaint) SOP Regulations provide a maximum time frame of 7 days

Key Finding 3: There is a need to produce bills in simple, Local language

Key Finding 4: Overall ranking of the metering and billing process is not very satisfactory Overall, commercial consumers have more concerns

Key Finding 5: Urban consumers are less satisfied than the rural consumers on metering and billing issues

Quality of Service

Key Finding 1: No prior information on power shutdowns is supplied to most of the consumers Need for dissemination of vital information to consumers (sms, advertisement in papers, etc)

Key Finding 2: Overall score for QOS is low for majority Overall, agricultural consumers have more concerns with QOS

Key Finding 3: the majority of consumers do not observe any improvement in QOS over last 3 years

Awareness about Reforms & Regulations

Key Finding 1: Awareness about HERC is very low Set up a Consumer Welfare Fund to support capacity building/awareness activities Involve Panchayats to ensure effective participation by local institutions

Key Finding 2: There is adequate awareness on EE

Key Finding 3: Overall ranking about information available to consumer is low Need for wider dissemination of useful information to consumers

Complaint Redressal Mechanism

Key Finding 1: Most of the consumers make personal visits for registering complaint Make the compliant redressal process more consumer friendly

Key Finding 2: Most of the consumers are not given a reference no for the complaint registered Need for a accountable complaint redressal mechanism

Key Finding 3: awareness about complaint redressal forum as well as ombudsman is very low Wider dissemination of information about the CRM

Key Finding 4: About 2/3 rd consumers do not observe any improvement in Complaint Redressal Mechanism over last 3 years

Tariff and other Related Issues

Key Finding 1: Majority of the commercial and domestic consumers believe that they are paying higher tariff

Key Finding 2: Majority of the consumer applying for new connection are not satisfied with the procedure

Key Finding 3: Lack of transparency in releasing new connection is the major concern of consumers

Zonal Distribution

DHBVN: Sampling Districts Zone UHBVNLiteracy (%age) Index score Consumpti on (Lakh kWh) Index score Compos ite Score Rankin g (Ascen ding) (Literacy)(Consu mption) Eastern Zone Faridabad Palwal Gurgaon Mewat Mahendergarch Rewari Western Zone Sirsa Hisar Fatehabad Bhiwani

UHBVN: Sampling Districts Zone UHBVNLiteracy (%age) Index score Consum ption (Lakh kWh) Index score Composi te Score Ranking (Ascend ing) (Literacy)(Consump tion) Eastern Zone Panchkula* Yamunanagar Ambala Karnal Panipat Western Zone Kurukshetra Rohtak Sonepat Jhajjar Kaithal Jind

Blocks Covered ● Yamunanagar – Jagadri, Chhachhrauli, Radaur ● Hisar – Hisar, Hansi, Adampur ● Sonepat – Sonepat, Gannur, Gohana ● Karnal – Karnal, Nilokhri, Asand ● Jhajjar – Jhajjar, Salahwas, Beri ● Gurgaon – Gurgaon, Sohna, Pataudi ● Fathehabad – Fathehabad, Ratiya, Tohana ● Mewat – Firozpur Jhirka, Nuh, Tauru