The Permitting Process under the Pollution Prevention and Control (Scotland) Regulations Ian Halliday Senior Policy Officer.

Slides:



Advertisements
Similar presentations
Permitting Process Overview Alasdair McKellar PPC Compliance Officer Environment Agency.
Advertisements

Best Available Techniques (BAT)
December 2005 EuP Directive : A Framework for setting eco-design requirements for energy-using products European Commission.
Environmentally sound management of ship recycling- simple or complex? Roy Watkinson Department for Environment, Food and Rural Affairs UK Promoting Sustainable.
Educationeducation Improving Scottish HM Inspectorate of Education Schools (Consultation) (Scotland) Act 2010 HMIe Briefing 2011.
The Legislative Position in Scotland Environmental Information (Scotland) Regulations 2004 SSI 2004 No.520 Professor Colin Reid, School of Law, University.
EU FORMAL REGULATION – TYPES OF STANDARDS ENVIRONMENTAL QUALITY OBJECTIVES ENVIRONMENTAL QUALITY STANDARDS.
EU FORMAL REGULATION – TYPES of STANDARD MINIMUM EMISSION STANDARD (sometimes known as LIMIT VALUES) UNIFORM EMISSION STANDARD.
Department of Arts and Culture Briefing on the Use of Official Languages Bill to the Select Committee on Education and Recreation Date:15 August 2012.
IPPC and Industry By Dr. Ken Macken Dublin Regional Licensing Manager.
Industrial Pollution Control and Risk Management: IPPC Neil Emmott Environment Directorate-General 7 April 2006.
Law approximation and implementation in Hungary Ministry for Environment Department of Integrated Pollution Control Nicosia, May 2001 Andrea Nám, desk.
IPPC IN MINING AND METALLURGY IN THE REPUBLIC OF MACEDONIA Bosko Nikov
Energy National Policy Statements Nick Cooper DECC.
Air Quality and Land Use Planning Land Use Consultants 11 th March 2008 Susanne Underwood.
Alex Radway Policy Advisor Process Industries Regulation.
The European IPPC Bureau Institute for Prospective Technological Studies (IPTS) Seville, Spain Internet E.mail : Don.
Engaging with Planning Agents Reform of the Planning System 30 April 2015.
The Scottish Pollutant Release Inventory (SPRI) Bob Boyce - SEPA Senior Environmental Assessment Officer.
The Environment Agency Alasdair McKellar – PPC/COMAH Regulatory Officer.
IAEA plans with respect to environmental protection EC PROTECT Workshop Oslo, Norway, 28–30 January 2008.
Scotland’s Bathing Waters ARE WE READY FOR 2012 Beach Operators Seminar 7 October 2010 Ian Speirs Scottish Government.
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
Planning Process for Nationally Significant Infrastructure Projects (NSIP) Outreach Event – 22 January 2014.
The Sevilla process for supporting the implementation of the IPPC Directive Michael Parth Tallinn – Estonia 27 – 28 March 2008.
Professor Kenneth C Ross Partner Brodies LLP. Historical background Who pays? Law Society leaflet “Recent clarification of Law Society advice Why is this.
Ship Recycling Facility Management System IMO Guideline A.962
Workshop, 12/3/2004 Banska Bystrica – SLOVAC REPUBLIC “INTEGRATED LICENCE PROCEDURE (Greek case)” Katerina Iakovidou-Anastasiadou Hellenic Ministry for.
IAEA International Atomic Energy Agency Overview of legal framework Regional Workshop - School for Drafting Regulations 3-14 November 2014 Abdelmadjid.
Technical Regulations – U.S. Procedures and Practices U.S.-Brazil Commercial Dialogue Digital Video Conference Series August 22, 2006 Mary Saunders Chief,
IPPC Directive state of play and future developements
Health and Safety Executive Health and Safety Executive Seveso III Directive Moving from Seveso II to Seveso III Sandra Ashcroft, HSE 19 March 2013.
Fichtner Consulting Engineers UK Covanta Energy Ltd Content of Environmental Permit Application Nick Gamble.
Agency Drafts Statement of Scope Governor Approves Statement of Scope (2) No Agency Drafts: Special Report for rules impacting housing
Sustainability Reporting Section 2: Measuring & Reporting Click anywhere to move to the next slide.
Health and Safety Executive Health and Safety Executive Competent Authority & Data Reporting HSE/DECC Consultation Events - Spring 2014 EU Offshore Directive.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
TBT 14: Permit Compliance HILLS’ ETHOS: IMPROVEMENT ENGAGEMENT PREVENTION ACCOUNTABILITY PROGRESSIVE FRONT FOOT ROLES AND RESPONSIBILITIES HWS – Toolbox.
Local Assessment of Code of Conduct Complaints. 2 Background  On 08 May 2008 – the local assessment of Code of Conduct complaints was implemented due.
Planning appeals Peter Ford Head of Development Management Planning Committee Training – 30 th July 2015.
1 Workshop on the Directive 96/61/EC concerning (IPPC) Integrated pollution prevention and control INFRA Public participation & access to environmental.
LIFE AFTER LANDFILL – THE TRANSITION FROM LANDFILLS TO RESOURCE RECOVERY AND TRANSFER STATION 27 September 2007 "Planning – Guidance on Planning Issues.
Best Available Retrofit Technology Rule - Colorado David R. Ouimette Colorado Air Pollution Control Division.
The new VicSmart process and provisions. What is VicSmart? VicSmart is a fast planning permit process A decision is expected to be made in 10 days All.
FLOOD RISK MANAGEMENT The next steps. The National Technical Advisory Group On Flooding Issues An Overview and the Future.
Consultant: CMDC Joint Venture EIA, IPPC and SEVESO Links.
Local Assessment of Code of Conduct Complaints. Background  On 08 May 2008 – the local assessment of Code of Conduct complaints was implemented due to.
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
Visit us at E mail: Tele:
Consultant: CMDC Joint Venture Czech experience - Use of BREFs and national BAT notes, role of IPPC Agency, Czech TWG Multi-Country Workshop June 8th,
The current legal situation
DG ENV Environmental assessment procedures for energy infrastructure projects of common interest (PCIs)
Special Meeting on Procedures for Information Exchange November 7, 2007 Geneva Session 1 Anne Meininger United States USA WTO TBT Enquiry Point.
Lecturer: Lina Vladimirovna Zhornyak, associated professor.
IPPC A general overview Nigel Barraclough Policy Adviser Industrial Pollution Control Branch Air and Environment Quality Division. Taiwanese Environmental.
Strategic Environmental Assessment (SEA) A Scottish replacement to Air Passenger Duty (APD) Elaine McCall Environmental Assessment Team The Scottish Government.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
BMRA Legislative Policy Group – Shredder Sub Group
Legislation Carl James.
process and procedures for assessments
How to Protect the Local Environment
BAT - BREF Their scope Rob Kramers Senior advisor InfoMil.
6 November 2015: Desiree Swartz – Parliamentary Legal Adviser
STRESS TESTS and TAIWAN PEER REVIEW PROCESS
Nuclear and Treaty Law Section Office of Legal Affairs
Training Appendix for Adult Protective Services and Employment Supports June 2018.
4 May 2016 : Desiree Swartz – Parliamentary Legal Adviser
Team Leader name: Date:
Finalisation of study report
Finalisation of study report
Presentation transcript:

The Permitting Process under the Pollution Prevention and Control (Scotland) Regulations Ian Halliday Senior Policy Officer

The Determination Process  Pre-application discussions  ‘Duly made’ assessment of application  Commercial Confidentiality / National Security  Statutory consultations  Public consultations (includes advertising)  Requests for further information (includes Schedule 4 Notices)  Assessment of technical content of application  Drafting and issue of permit  Public Participation consultation

A Duly Made Application  On receipt of application there is a check that a legally complete application has been made.  An application is considered duly made where it: i.meets the requirements of Part 1 of Schedule 4; ii.is made on SEPA application forms and all questions answered; iii.the correct fee is enclosed; and iv.it is signed and dated by an appropriate person.

Statutory Consultees  Local authority  Local health board  Food Standards Agency  Scottish Natural Heritage (where there is the potential to impact on designated sites)  Scottish Water (where discharge to sewer)  Health and Safety Executive (COMAH / nuclear site)  Harbour authority (where there is a discharge to harbour)  Consultees must receive application within 14 days (subject to CC/NS)  28 Days to provide comments to SEPA

Public Consultation  Applications must be advertised.  Adverts must appear between 15 and 42 days from a duly made application being submitted.  Edinburgh Gazette and a local paper.  Applications are available to be viewed by members of the public at the local Registry.  Representations received within timescales must be considered in determining application.  For certain applications perceived to be of particular public interest SEPA may advertise on its website.

Determination Principles  No significant pollution is caused.  Operations are to be carried out using the Best Available Techniques.  Other legislation complied with e.g. Waste Incineration Directive, Habitats Regulations.  Operator can and will comply with the Permit.

Requests For Further Information  Informal requests for minor points of clarification.  Schedule 4 notice if the information required is critical to the determination.  Questions will have a time limited response.  Issue of a Schedule 4 notice stops the determination clock.  Failure to comply with a Schedule 4 notice can result in the application being deemed withdrawn.

Best Available Techniques (BAT)  Permit conditions should be based on BAT: the most effective and advanced stage in the development of activities and their methods of operation which indicates the practical suitability of particular techniques for providing in principle the basis for emission limit values designed to prevent and, where that is not practicable, generally to reduce emissions and the impact on the environment as a whole.

Best Available Techniques (BAT)  From Schedule 2 (Special considerations)  Low waste technology  Less hazardous substances  Recovery & recycling  Emissions  Length of time to introduce  Raw material & energy use  Accident risks

BAT Guidance  Technical Guidance Notes (TGNs) are the primary UK guidance documents.  TGNs provides background information and indicative BAT requirements (BAT boxes).  European BREF documents.  Guidance is only indicative (BAT consideration must be site specific).  Applicants are expected to reference guidance when demonstrating BAT.  However there is currently no UK guidance or BREF on BAT for carbon capture.

Public Participation  Once the draft determination is available SEPA publishes on its website.  Draft permit, specific parts of the decision document and a copy of the non technical summary of the application.  28 day period for public comments.  SEPA must consider all comments received.