ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.

Slides:



Advertisements
Similar presentations
AnaSonde Assembly. What is the AnaSonde? *Reads temperature, pressure, and humidity data from the atmosphere *After it is sent into the atmosphere, it.
Advertisements

Assembly Manual Mike Fortney 04/09/2004 CricketSat Receiver.
CricketSat Receiver Assembly Instructions This is the instruction slides for the assembly of a receiver board. It would be a good idea to review soldering.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
Mechanical check of PMT Check base: Remove black tape and two small screws that secure the base. Tighten the nuts on the BNC connector for the HT input.
MDC-II LVL-1 Trigger Khaled Teilab for the MDC Trigger Team.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Feb, 13, 2008.
Assembly Manual Mike Fortney 04/02/2006 CricketSat Receiver.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
HF Video MeetingDec 2002E. Hazen HF Electronics PMT Readout Update E. Hazen, J. Rohlf, E. Machado Boston University.
Design a Voltmeter Experiment 19. Goal Design a circuit that displays the value of unknown voltage between certain voltage ranges. – The unknown voltage.
George Washington University DC Circuits Lab Professor Ahmadi ECE 002.
BaBar/LST Meeting Dec 8, 2003K. Honscheid, Ohio State University Module Assembly Quality Control High Voltage Ohio State Status Report.
End of phase A meeting CNES (Toulouse) 2/02/2012 Ph. Gorodetzky APC - Paris Diderot1 High Voltage power supplies HV Switches Design: J. Szabelski, J. Karcmarczyk,
ECAL electronics Guido Haefeli, Lausanne PEBS meeting 10.Jan
SpectraSonde Assembly. What is the SpectraSonde? Reads temperature, pressure, and humidity data from the atmosphere. The SpectraSonde doesn’t fly like.
HF UPGRADE PROJECT Y. Onel PM June 11, Recent Highlights and News-I The PMT deliveries are now completed. Testing is going well. We had a meeting.
ECAL status Outline: Signal cable connectors quality check results: –ADC side –PM side ECAL PM/C-W channels commissioning status Access activities Further.
1 Why have we chosen to use the serial port, when it is more complicated and offers fewer connections than the printer port? For a beginners’ course using.
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
Results from the PMT test bench in BCN (10-Oct-03) J.Garra, R.Graciani, E.Graugés, X.Xirgu.
Status of the PCI Test Stand Hardware status: Three known working PTS’s: 2 at FNAL, 1 at UIUC. Korean group working on one, LBL has one running yet? Adapter.
Modelling of TPM noise problems Greg, following discussions and measurements with David and Senerath.
MSP430 Group Project ECE 300 Spring 2007 Dr. Walter Green Jeffrey Logsdon John Ly Daniel Henderson Nataly Sumarriva.
PMF: front end board for the ATLAS Luminometer ALFA TWEPP 2008 – 19 th September 2008 Parallel Session B6 – Programmable logic, boards, crates and systems.
AnaSonde-3M Assembly. What is the AnaSonde-3M? The AnaSonde-3M reads temperature, pressure and humidity data from the atmosphere. After the AnaSonde is.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
High Voltage System outside Drawers Tilecal upgrade meeting at Stockholm (3-5 June 2013) François Vazeille on behalf of Roméo Bonnefoy, Christian Fayard,
HCAL status and plans Yu. Guz.  Finally, no dead cells in the run However: There are unstable PMTs (mainly rate effect) Dark current.
HBD FEE test result summary + production schedule 16mv test pulse result –5X attenuator + 20:1 resistor divider at input (to reduce the noise on the test.
© 2013 The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill 10-1 Electronics Principles & Applications Eighth Edition Chapter 10 Troubleshooting.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
CHANTI update F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Mirra, M. Napolitano, L. Roscilli, G. Saracino.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
MINER A Operations Report All Experimenters’ Meeting Steve Hahn, FNAL July 1, 2013.
Information for the assembly of the test board w/ PMT and preamps
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
Electronics: Junction Cards, Adapter Card, Purple Card, …. Ron Sidwell, K. Harder, T. Sobering, R. Taylor, E. VonToerne, Kansas State U.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
Analysis for QA (temporary) Hideyuki Sakamoto 1 st October 2007 MICE Tracker Phone Meeting.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Belle-II iTOP HVB Status SLIDE FOR INCLUSION IN GARY’S PRESENTATION Belle II General Meeting Gerard Visser Indiana University CEEM 11/13/2012.
June 30th 2008Jacques Lefrancois1 CW base studies Last week June 24th at calo meeting : news that preliminary test done by Yuri Gilitski indicated that.
ZDC Status A.Mestvirishvili Iowa. Quite while we had some problems with ZDC, QIE saturations, Reflections, Noise etc. To improve the situation several.
An introduction to PIC’s for KS3 and KS4. Mr Rooks Hetton School.
HF I&C status Alexi Mestvirishvili, University of Iowa LS1 session, December CMS week1.
1 HF CRAFT and at 4 Tesla Kerem Cankocak Ferhat Ozok, Sercan Sen HCAL DPG Meeting 17 Nov
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
G. Kieft Nikhef Amsterdam Electronics- Technology PMT tubes PMT bases PMT asic’s Automatic tester for PMT bases Camac test set-up for PMT tubes LeCroy.
Spikes A.Mestvirishvili, I.Schmidt University of Iowa 1.
E.Guschin (INR,Moscow) 12 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Done: All final cabling, except rearrangement.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 01/19/2009.
HE FEE Boards production status 26 th May 2016 Mandakini Patil 1.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
Progress on resistor failure diagnosis Ben J ( + Matt, Zander)
Analog FE circuitry simulation
HF Test station at P5 A.Mestvirishvili.
Block Diagram Transmitter Receiver × 2 Transmitter Power Supply ADC
Mini-drawers, FE-ASIC , Integrator
Testing of the EMCO Prototype Boards
Wiring the Light and Relay
2019 Investing Now Summer Program
Presentation transcript:

ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa

ROBOX ROBOX with 24 new m-anode PMT’s assembled and being tested in B904 test facility Box is operational, test runs were taken – SPE vs HV, LED vs HV, phase scan. Analysis is in progress Initially planned to be installed during January this year, just before HF leaves garage Postponed due to observed problem with baseboard. Particularly with the PMT socket New schedule for installation mid February

ROB with new adapter boards and recessed connectors 3

New Base board Baseboard with adapter board Baseboard with PMT’s Baseboard – view from socket side. Sockets are custom designed at FNAL

5 550 V 600 V 650 V 700 V R7600 LED vs Channels Slide borrowed from Sercan Sen’s presentation. Full version can be found 8 channels are missing on the plot for HV=700. This is due either reconstruction program can not treat correctly saturated channels, or not proper run was used to produce this plot

LED Signal for 700 Volt Reflections seen here appears to be feature of the test stand and QIE. We do not have light guides and light injection path is slightly different for a test stand. When PMT produces large signal, more 10mA QIE input circuit is not correctly impedance matched to cable and we get reflection

600Volt 750Volt

8 R7600 LED vs HVs Chan 01 Chan 06 Chan 13 Chan Channel e Channel e Channel e Channel e Channel e Channel e Channel e Channel e Channel e Channel e Channel e Channel e Channel e Channel e Channel e Channel e+00 Slide borrowed from Sercan Sen’s presentation. Full version can be found

9 Last SPE Runs, Channel Slide borrowed from Sercan Sen’s presentation. Full version can be found

Problems we hit during testing Two from three base boards, which were shipped from FNAL in December were not working properly. Cathode Voltage – 600VVoltagesr for last two dinodes – 95 and 47 V Power supply was drawing too much current and tripping finally with over current protection when on a last dinodes nominal values were set. When power for last two dinodes were off, divider was setting different values for those two dinodes, then nominal Measuring the resistances of divider chain showed that last two dinode resistor values were different than nominal.

PMT Sockets Pics from Sergey Los Pins are press fitted to PCB and probably this cracks the capacitors, which then alerts the resistor values in a divider chain and, as consequence changes division coefficient Designed at FNAL

Problems we hit during testing New boards, which underwent more strict test were shipped from FNAL. All three boards exchanged. 2.During the test one board failed again with exactly the same signature, as previous two. Power supply for last dinode tripped with over current protection Operating the board without external voltages for last two dinodes resulted voltages set by divider to be 88 and 33 Volt instead of 95 and 47 for 600 Volt for cathode Board was exchanged. ROBOX is operational now with new board installed

Two different solutions First press fit the pins, then solder caps Difficulties due to space unavailability Second solution – remove caps from socket and move them to baseboard Difficulties - (according to Sergey Los) “several extra centimeters in dinode connection which is at the edge of 1ns rise time”

Summary After a faulty baseboards were exchanged ROBOX is operational. Different tests were done – SPE, LED, Phase scan etc. Analysis is in progress, but from those results which are already obtained and provided baseboards are in normal working condition, everything looks good ROBOX is ready to be installed on detector. Installation postponed for four weeks, until we completely eliminate reason of failure Two different solutions – either first press fit the pins and then solder caps, or just move caps from socket to baseboard In case of baseboard last or last two dinode caps fails it can be operated without power for last two dinode, but this is not perfect solution since extra noise can be introduced due to current leakage, gain change, response linearity will be alerted.