Capacity Forecast Model Mark Ruane Credit Work Group ERCOT Public October 15, 2014.

Slides:



Advertisements
Similar presentations
NPRR 206 DAM Credit Requirements Reduction: E Values and Percentiles Luminant Proposal.
Advertisements

NPRR 532 Performance Measurement & Verification and Telemetry Requirements for Load Resources providing Non-Spin David Kee CPS Energy Energy Supply & Market.
Seasonal Adjustment Factor Discussion Technical Advisory Committee
1 NPRR638 Back-casting Updated Results CWG/MCWG Suresh Pabbisetty, ERP, CQF, CSQA. ERCOT Public May 01, 2015.
Forecasts and Assessments Presented to the Independent Power Producers’ Society of Ontario Pat Doran, Supervising Technical Officer Independent Electricity.
Seasonal Adjustment Factor Mark Ruane Credit Work Group ERCOT Public July 23, 2014.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
MCWG Update to WMS Loretta Martin LCRA, Chair Josephine Wan AE, Vice Chair 03/05/
Market Trials - Friday call Credit and Treasury Weekly Update September 3, 2010.
Capacity Forecast Report Sean Chang Market Analysis and Design Suresh Pabbisetty CQF, ERP, CSQA Credit CWG/MCWG September 16, 2015 ERCOT Public.
September 2012 Proposed CRR Auction Credit Changes: Summary of Draft NPRR.
Generation Adequacy Task Force Update to WMS September 14, 2011.
Updated Cost/Benefit Analysis for PRR Part A/S Bidding Proposed Methodology.
1 NPRR 484/554 – Revisions to Congestion Revenue Rights Credit Calculations and Payments Market Call ERCOT Public July 31, 2013.
Emerging Technologies Working Group Update to WMS March 05, Contents I.Update on NPRR 588 II.Solar Forecasting: Protocol Revisions Needed III.Solar.
ERCOT Credit Loss Model Mark Ruane Credit Work Group / Market Credit Work Group ERCOT Public April 22, 2015.
Market Credit Working Group update to the Wholesale Market Subcommittee 06/03/
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
MCWG Update to WMS 5/11/ Exposure / Collateral Update Nodal Total Potential Exposure reported by ERCOT as of 4/30/11 remains less than Zonal Estimated.
Market Credit Working Group update to the Wholesale Market Subcommittee 10/07/
1 Capacity Forecast Report Mark Ruane Director, Market Credit CWG / MCWG March 10, 2015 ERCOT Public.
Matt Tozer ERCOT Manager, Settlements & Billing 9/4/2013 ERCOT Update Management of the Balancing Account CMWG.
1 NPRR638 Back-casting Updated Results CWG/MCWG Suresh Pabbisetty, ERP, CQF, CSQA. ERCOT Public April 22, 2015.
1 Draft NPRR – Revisions to Certain Price Components of EAL CWG/MCWG ERCOT Public January 22, 2014.
1 Project Update and Summary of Project Priority List (PPL) Activity to Date May 15, 2014.
MCWG Update to WMS 08/14/2013. MCWG Update to WMS General Update -July 31 st Joint MCWG/CWG Meeting Review NPRRs All operational except – NPRR 552 – Additional.
Market Credit Working Group update to the Wholesale Market Subcommittee 05/06/
October 20, 2010 WMS Credit Update. 2 Topics Nodal exposure – how much collateral CRR/TCR auctions – December 2010 Preliminary Credit Cutover Timeline.
Market Credit Working Group update to the Wholesale Market Subcommittee 04/06/
Credit Updates Vanessa Spells Credit Work Group ERCOT Public February 18, 2015.
Commercial Operations Subcommittee Update to TAC September 7, 2012 Harika Basaran, COPS Chair 2012 Jim Lee, COPS Vice Chair 2012.
MCWG Update to WMS 11/13/2013. MCWG Update to WMS General Update - October 30 th Joint MCWG/CWG Meeting Review September 25 Meeting Minutes - Approved.
The credit exposure impact of higher system-wide offer caps was estimated using an internal ERCOT model under four scenarios: 1.(Base Case) “Normal” summer.
Market Credit Working Group update to the Wholesale Market Subcommittee 09/02/
Commodities Exchange Act Market Participant Criteria and Attestation Mark Ruane ERCOT Vice President of Credit and Enterprise Risk Management CWG/MCWG.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public December 16, 2015.
1 Nodal Credit Update at WMS June 16, 2010.
ERCOT CWG/MCWG April 24, 2013 DAM Credit Parameters.
Long Term Study Resource Expansion Process: Study Findings and Lessons Learned Jenell Katheiser Doug Murray RPG May 21, 2013.
Market Credit Working Group update to the Wholesale Market Subcommittee 02/04/2015.
1 ICE Price Data Analysis CWG/MCWG Suresh Pabbisetty, CQF, ERP, CSQA. ERCOT Public January 20, 2016.
1 Project Update and Summary of Project Priority List (PPL) Activity November 12, 2015.
Market Credit Working Group update to the Wholesale Market Subcommittee 03/04/
1 Exposure Stress Testing CWG/MCWG Suresh Pabbisetty, CQF, CSQA. ERCOT Public June 12, 2014.
Credit Parameter Change Technical Advisory Committee of ERCOT July 30, 2014.
1 Review of Minimum Current Exposure (MCE) as revised by NPRR639 Mark Ruane Director Settlements, Retail and Credit TAC July 30, 2015 ERCOT Public.
CMWG Update to WMS Report of CMWG Meeting of
1 Timeline for Activities in Breach CWG/MCWG ERCOT Public September
Credit Exposure and Loss Given Default Mark Ruane Credit Work Group ERCOT Public November 18, 2015.
The Wholesale Market Subcommittee Update Prepared for the July 31st TAC meeting.
Capacity Forecast Report Fall Update Sean Chang Market Analysis and Design Suresh Pabbisetty CQF, ERP, CSQA Credit CWG/MCWG December 16, 2015 ERCOT Public.
1 NPRR638 (Seasonality) Back-Cast Results CWG/MCWG Suresh Pabbisetty, ERP, CQF, CSQA. ERCOT Public October 3, 2014.
1 NPRR638 Back-casting Updated and Supplementary Results CWG/MCWG Suresh Pabbisetty, ERP, CQF, CSQA. ERCOT Public May 20, 2015.
Credit Exposure and Expected Loss update Suresh Pabbisetty, FRM, ERP, CQF, CSQA. Lead Technical Analyst, Credit February 17, 2016.
Project Funding Review February 7, Background ERCOT has a $15M project budget in 2013 (same as 2012) –To allow for new additions to the.
Energy Emergency Alert (EEA) UPDATE F EBRUARY 8, 2011.
DSWG Market Data Needs Update Eric Rothschild, GDS Associates 11/2/2012.
CMWG Update to WMS Met 4/24 & 5/11 Continued Work on PRR 801 –Discussed outages as related to TCR Cases –ERCOT evaluates various outage combinations.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public May 18, 2016.
Re-Execution of the February ’16 Monthly CRR Auction David Maggio & Mark Ruane Technical Advisory Committee January 28 th, 2016.
Generation to be Dispatched(GTBD) Analysis For the purpose of discussion only PDCWG/QMWG Joint Meeting 11/02/2012.
2017 Seasonal Adjustment Factors
Credit Updates Vanessa Spells Credit Work Group ERCOT Public
ERS Procurement Methodology
Market Credit Working Group update to the Wholesale Market Subcommittee 9/27/2017.
Mark Ruane Vice President, Credit and Enterprise Risk Management
David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy
Project Update and Summary of Project Priority List (PPL) Activity to Date July 17, 2014.
Loretta Martin LCRA , Chair Josephine Wan AE, Vice Chair 05/07/2014
Annual Review of Credit Parameters
Presentation transcript:

Capacity Forecast Model Mark Ruane Credit Work Group ERCOT Public October 15, 2014

Capacity Forecast Model Next Steps ERCOT Public In July ERCOT presented the results from an internally-developed model to forecast reserve capacity over a four-day horizon. The model appears promising in providing a forward-looking basis for assessing the risk of high prices However, the model utilizes outage information, which limits its use on a mandatory basis

Capacity Forecast Model Next Steps ERCOT Public Potential approach Rolling six day forecast of potential reserve shortfall hours; two day advisory forecast (D5-D6), published daily 2-Level forecast threshold at 3000MW and 2500MW excess capacity RTLE adjusted daily on a rolling basis for updated D1 – D4 forecasts with capacity shortfalls Reserve shortfall periods reflected in RTLE as an increased percentile parameter in the price estimate for a shortfall hour Periodic review of parameters to allow ongoing “tuning” of model

Capacity Forecast Model Next Steps ERCOT Public Daily forecast posts Forecast tenor D1 D2 D3 D4 D0 D5 D6 Advisory Adjust TPE as applicable Rolling six-day excess capacity forecast. TPE would be adjusted by applying a higher lookback percentile than currently used in NPRR638 calculations. TPE would not be adjusted until the day following the forecast.

ERCOT Public Capacity Forecast Model Threshold The negative correlation between prices and reserves is greatest at reserve levels < ~3000 MW. Advisory Watch EEA1 Cumulative Correlation

ERCOT Public Capacity Forecast Model Threshold Potential approach to increase collateralized price level from P84 to P90 at 3000MW, and from P90 to P95 at 2500MW Physical Responsible Capacity (PRC). Advisory Watch EEA1 ~P90 ~P95 Cumulative Correlation

Questions ERCOT Public Capacity Forecast Model Next Steps