Master Production Scheduling

Slides:



Advertisements
Similar presentations
Material Requirements Planning
Advertisements

Ch. 6 Master Production Scheduling
1 Unit 4B - Logics and Calculation of Material Requirement Planning.
15 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Inventory and MRP 15 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Managing Production across the Supply Chain
Master Production Scheduling (MPS) – Basic Techniques pom
The Material Requirements Planning Process
5. Master Production Scheduling
MRP and Related Concepts
Material Requirements Planning (MRP)
Material Requirements Planning Planned Orders Demand BOM Material Data Inputs Output.
Master Production Scheduling
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
ERP: Mfg Plan’g and Control(MPC) 에 근거하여 SNU MAI LAB Master Production Scheduling.
Supplement D Master Scheduling and Rough-cut Capacity Planning
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
Disaggregation Working with aggregate units facilitates intermediate planning. But to put this plan into action we should translate it, decompose it, disaggregate.
MGMT Materials Management Systems Master Production Scheduling Chapter 3.
DOM 301 : Operations Management Practice
1 Chapter 15 MRP and ERP. 2 Dependent demand: Demand for items that are subassemblies or component parts to be used in production of finished goods. Dependant.
Material Requirements Planning
© 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
Intermediate-range capacity planning Usually covers a period of 12 months. Short range Intermediate range Long range Now2 months1 Year Aggregate Planning.
Operations Management Contemporary Concepts and Cases Chapter Sixteen Material Requirements Planning and ERP Copyright © 2011 by The McGraw-Hill Companies,
Material Requirements Planning (MRP) Computer-based information system for ordering and scheduling of dependent-demand inventories, i.e. what is needed,
Aggregate Planning and Resource Planning Chapters 13 and 14.
Ardavan Asef-Vaziri Systems and Operations Management
Materials Requirements Planning
Master Scheduling Chapter 3.
Operations Management Material Requirements Planning
1 Slides used in class may be different from slides in student pack Chapter 16 Materials Requirements Planning  Material Requirements Planning (MRP) 
Chapter 16 Inventory Systems for Dependent Demand
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Material Requirements Planning (MRP) Slide Set #10.
11 Master Scheduling CHAPTER
Material Requirements Planning
Chapter 15 MRP and ERP.
1 Materials Requirements Planning. 2 Material Requirements Planning Defined Materials requirements planning (MRP) is a means for determining the number.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1998 Material Requirements Planning (MRP) Chapter 15 11/7/05 Overview Position of MRP in Operation.
Hierarchy of Production Decisions
© The McGraw-Hill Companies, Inc., Master scheduling Material requirements planning Order scheduling Weekly workforce and customer scheduling Daily.
Aggregate Planning and Resource Planning Chapters 13 and 14.
P RODUCTION PLANNING What do we need to produce? Process Machinery & Equipment Labor Skills Material 1.
Material Requirements Planning. Materials requirements planning (MRP) is a means for determining the number of parts, components, and materials needed.
MGMT Materials Management Systems Materials Requirements Planning Chapter 4.
Resource Planning Chapter 15.
Materials Requirements Planning
Operations Fall 2015 Bruce Duggan Providence University College.
Lecture 3 Production Planning System Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
BUAD306 MRP.
Lecture 5 Master Product Scheduling Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College, Emeritus,
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Master Production Scheduling (MPS) Slide Set #9.
© 2008 Prentice Hall, Inc.14 – 1 Material Requirements Planning (MRP)
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
CHAPTER-14 MRP AND ERP MD. TAZIDUL ISLAM. 2  Material Requirement Planning (MRP) is the concept of designing and developing information system to aid.
1 © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved Chapter 16 Materials Requirements Planning.
Material Requirements Planning
MIS Topic # 5 1 Bill of Materials. MIS Topic # 5 2 Bill of Materials Definition It is an engineering document that specifies the ingredients.
LESSON 4 Master Production Scheduling
Master Production Scheduling (MPS)
Facility Inventory Old Facilities Modern Facilities Classroom Size
Introduction to Materials Management
BUAD306 MRP/ERP.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 16 Materials Requirements Planning
MRP and ERP.
Chapter 5 Master Production Scheduling
CHAPTER 14 MRP and ERP.
Introduction to Materials Management
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

Master Production Scheduling MIS 381 - Topic # 5

What is the MPS? The MPS translates the Sales & Operations Plan (S&OP) into a plan for producing specific products in the future. The MPS is a statement of planned future output. MIS 381 - Topic # 5

As a statement of output, the MPS Forms the basic communication between the market and manufacturing. Is stated in product specification terms (part numbers) for which there are Bill of Materials (BOM). [MPS is Concerned with product mix while Sales and Operations Planning is concerned with volume] MIS 381 - Topic # 5

MPS is the basis for Making customer delivery promises Utilizing plant capacity effectively Attaining the strategic objectives in the sales and operations plan Resolving trade-offs between manufacturing and marketing MIS 381 - Topic # 5

MPS conversion . Controlled by a separate Final Assembly Schedule (FAS) which is defined at the very last moment. Environment Basis of conversion MTS Items are produced in batches, carrying finished goods inventories for most, if not all, end-items. ATO MPS unit is typified by limitless number of possible end-item configurations made from combinations of basic components and subassemblies. Probably will not start final assembly until order arrives. MTO MPS unit is defined as the particular end-item composing a customer order. Production starts before a complete product definition (BOM) has been determined. MIS 381 - Topic # 5

Linkages to other firm activities MIS 381 - Topic # 5

Rules for filling the MPS tables The greater of the forecast or order receipts is considered for the calculations. The available row = previous available + MPS – (greater of the booked orders or forecast) Other rules follow the method used (phased, rolling through time, order promising and consuming the forecast. MIS 381 - Topic # 5

Single Level MPS Record Example The Zero Manufacturing Company ships Product A from the firm's plant warehouse to satisfy East Coast demand. Currently, the sales forecast for Product A at the Murphysboro plant is 30 units per period. Product A is considered a make-to-stock item. Plant warehouse on hand inventory = 50 units Safety Stock = 10 units Lot Size = L4L Open Order for 30 units due in period 1 MIS 381 - Topic # 5

MPS TABLE The master production scheduler has heard that an MRP record which uses the forecast for gross requirements and has a lead time of zero can be used for master production scheduling. Complete the following MRP record. How can this be used for master production scheduling? 1 2 3 4 5 6 Projected available balance Planned order release Q = lot for lot; LT = 0; SS = 10 Period Product A Gross requirements Scheduled receipts MIS 381 - Topic # 5

MPS TABLE One way viewing an MPS is as the set of planned order releases and scheduled receipts in a record such as above. The problem is that any errors in forecast will be reflected in the on-hand balance. All changes will come in the planned orders. Use of firm planned orders will reduce this instability. MIS 381 - Topic # 5

MPS Techniques Time phased record Rolling through time Order promising Available to promise (ATP) Figures 6.2; 6.3; 6.4 and 6.5 MIS 381 - Topic # 5

Level vs. Chase vs. Lot Sizing MIS 381 - Topic # 5

Rolling through time actual sales = 10 instead of 5 units, and actual inventory at end of week 1 is 10 units Revised table MIS 381 - Topic # 5

Order promising Received orders for weeks 1,2,3 & 4 MIS 381 - Topic # 5

Consuming the forecast MIS 381 - Topic # 5

The Job of the MPS Scheduler Primary responsibility for making any additions or changes to the MPS records. Has also responsibility for disaggregating the production plan to create the MPS and that the sum of the detailed MPS matches the Production Plan (SO&P). Responsible for launching the FAS. MIS 381 - Topic # 5

The Job of the MPS Scheduler Making sure that there is only one unified database for the MPS Measure actual performance against the MPS and production plan (SO&P) Its useful to think of the MPS as a set of firm planned orders. The scheduler needs to convert planned orders to firm planned orders and to manage the “timing” and amounts of the firm planned orders. MIS 381 - Topic # 5

MPS Stability A stable MPS translates into stable component schedules, which means improved performance in plant operations. Too many changes – lower productivity Too few changes – lower customer service levels. MIS 381 - Topic # 5

Increasing MPS stability Stability is monitored and managed by using: Firm planned order treatment for the MPS quantities Frozen time periods for the MPS and Time fencing to establish clear guidelines for the kinds of changes that can be made. Check 6.24, Text: VBMJ MIS 381 - Topic # 5

Time Fencing This is an extension of the freeze concept. Many companies set time fences that specify periods in which various types of change can be handled. The planning fence indicates the time at which the scheduler should be planning more MPS quantities. MIS 381 - Topic # 5

Guidelines for Managing the MPS Start by having a realistic MPS Stability and proper buffering are important to remove all the excuses for not attaining the performance for which the proper budget has been provided. The overstated MPS erodes belief in the formal system. Always force the sum of the MPS to equal the production plan. MIS 381 - Topic # 5

MPS Measures Measure MPS in concrete terms that reflect the firm’s fundamental goals. Measure customer service (hit promised dates, Quality, etc.). Compare production vs. plan Keep records of backorder supply time to improve them. MIS 381 - Topic # 5