California’s Statewide Pricing Pilot Summer 2003 Impact Evaluation 17 th Annual Western Conference, San Diego, California Ahmad Faruqui and Stephen S.

Slides:



Advertisements
Similar presentations
Load Impacts And Marketing Effectiveness from The Countrys Largest Dynamic Pricing Program Load Impacts And Marketing Effectiveness from The Countrys Largest.
Advertisements

SmartPOWER Critical Peak Pricing (CPP) June 3, 2008.
Achieving Price-Responsive Demand in New England Henry Yoshimura Director, Demand Resource Strategy ISO New England National Town Meeting on Demand Response.
Dynamic Pricing - Potential and Issues Joe Wharton and Ahmad Faruqui Kansas Corporation Commission Workshop on Energy Efficiency March 25, 2008.
C HARLES R IVER A SSOCIATES The Economics of Critical-Peak Pricing (CPP) for Mass Markets September 23, 2004 Electricity Pricing for Rate Cases An EUCI.
Random Assignment Experiments
Time-of-Use and Critical Peak Pricing
January 20, 2004 California’s Statewide Pricing Pilot Larsh Johnson – President and Chief Technical Officer, eMeter Sanjoy Chatterjee – Principal, Chatterjee.
1 The Potential For Implementing Demand Response Programs In Illinois Rick Voytas Manager, Corporate Analysis Ameren Services May 12, 2006.
A Two-Level Electricity Demand Model Hausman, Kinnucan, and Mcfadden.
Authors: J.A. Hausman, M. Kinnucan, and D. McFadden Presented by: Jared Hayden.
Automated Demand Response Pilot 2005/2004 Load Impact Results and Recommendations Final Report © 2005 Rocky Mountain Institute (RMI) Research & Consulting.
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING ©2014 Navigant Consulting, Inc. May 7, 2014 Navigant Reference: Impact.
Critical Peak Pricing Gulf Power’s Experience Dan Merilatt, V.P. Marketing Services GoodCents Solutions, Inc. Stone Mountain, GA September 9, 2002.
2013 SDG&E Summer Saver Load Impact Evaluation Dr. Stephen George DRMEC Spring 2014 Load Impacts Evaluation Workshop San Francisco, California May 7, 2014.
Kidane Asmerom and Teh wei-Hu
Valuing Load Reduction in Restructured Markets Supply Cost Curve Regressions Market Price vs. Value of Load Reduction Photovoltaic Case Study William B.
Energy Efficiency and Demand Response: Separate Efforts or Two Ends of a Continuum? A Presentation to: Association of Edison Illuminating Companies Reno,
Assessment of Climate Change Impacts on Electricity Consumption and Residential Water Use in Cyprus Theodoros Zachariadis Dept. of Environmental Science.
1 Customer Experience with Dynamic Rates: Load Impacts, Satisfaction Levels and Lessons Learned from the California Pricing Pilot Load Management and Demand.
February 23, 2006Karen Herter, LBL/CEC/UCB-ERG 1 /29 Temperature Effects on Residential Electric Price Response Karen Herter February 23, 2006.
Developing Critical-Peak Pricing Tariffs with the PRISM Software Ahmad Faruqui May 30, 2007.
1 PG&E’s Operating Experience with TVP Rates Best Practices and Lessons Learned in Time-Variant Pricing R Residential Rate Workshop Gregory B.
Overview – Non-coincident Peak Demand
Presented by: Fadhila MICHAEL C. NAUGHTON. Purpose  Develop and demonstrate a method for deriving and testing regulatory preferences within and across.
California Statewide Pricing Pilot Lessons Learned Roger Levy Demand Response Research Center NARUC Joint Meeting Committee on Energy.
THE RESPONSE OF INDUSTRIAL CUSTOMERS TO ELECTRIC RATES BASED UPON DYNAMIC MARGINAL COSTS BY Joseph A. Herriges, S. Mostafa Baladi, Douglas W. Caves and.
Overview of Residential Pricing/Advanced Metering Pilots Charles Goldman Lawrence Berkeley National Laboratory SMPPI Board Meeting August 3, 2005.
Prepared by: Roger Levy; Levy Associates 1 USCL Corporation California SPP Results Initiative on Demand Pricing and Critical Peak Pricing July 2004 USCL.
+ Customer-side Smart Grid Technologies How will they change utility offerings? Karen Herter, Ph.D. Association of Women in Water, Energy, and Environment.
TOU for Tenants: Pay for What and When you Use Electricity J. Lopes; AEIC Load Research Conference – Myrtle Beach, SC; July TOU for Tenants: Pay.
Measurement, Verification, and Forecasting Protocols for Demand Response Resources: Chuck Goldman Lawrence Berkeley National Laboratory.
ERCOT 2003 UFE ANALYSIS By William Boswell & Carl Raish AEIC Load Research Conference July 13, 2005.
1 ADVANCED METERS AND DYNAMIC PRICING IN CALIFORNIA: IMPLEMENTING A VISION FOR THE FUTURE Presented at the Metering, Billing, and CRM/CIS Conference San.
Innovative approach to DSM through Open Access Jayant Deo MD & CEO, Indian Energy Exchange
EvergreenEcon.com ESA 2011 Impact Evaluation Draft Report Public Workshop #2 August 7, 2013 Presented By: Steve Grover, President.
Demand Response and the California Information Display Pilot 2005 AEIC Load Research Conference Myrtle Beach, South Carolina July 11, 2005 Mark S. Martinez,
March 30, 2004 CONFIDENTIAL AMR Benefits and Costs – Benchmarks and Examples Presentation at CB Associates Seminar Sanjoy Chatterjee
Rate Design Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker &
2013 California Statewide Critical Peak Pricing Evaluation Josh L. Bode Candice A. Churchwell DRMEC Spring 2014 Load Impacts Evaluation Workshop San Francisco,
March 25, 2004 California’s Statewide Pricing Pilot Larsh Johnson – President and Chief Technical Officer, eMeter.
Linking the Wholesale and Retail Markets through Dynamic Retail Pricing Presented by: Henry Yoshimura Manager, Demand Response ISO New England September.
CPUC Workshop on Best Practices & Lessons Learned in Time Variant Pricing TVP Pilot Design and Load Impact M&V Dr. Stephen George Senior Vice President.
Managerial Economics Demand Estimation & Forecasting.
CPUC Workshop on Best Practices & Lessons Learned in Time Variant Pricing TVP Load & Bill Impacts, Role of Technology & Operational Consideration Dr. Stephen.
EMV Results for online Energy Education Study conducted by Lei Wang, PhD October 2011.
Settlement Accuracy Analysis Prepared by ERCOT Load Profiling.
DR issues in California discussed last year in March Historical DR in California: some background issues –Twenty years of programs/tariffs I/C and AC cycling.
NASUCA Annual Meeting Austin, Texas November 10, 2015 Scott J. Rubin, Attorney + Consultant 333 Oak Lane + Bloomsburg, PA Office: (570)
The Impact of Retail Rate Structure on the Economics of Commercial Photovoltaic Systems in California Ryan Wiser, Andrew Mills, Galen Barbose & William.
Government’s Evolving Role in Resource Planning and Environmental Protection Arthur H. Rosenfeld, Commissioner California Energy Commission April 19, 2002.
1 Proposed Policies to Increase the level of Demand Response Energy Action Plan Update April 24 th, 2006, Sacramento, CA Mike Messenger, CEC.
Overview Review results Statewide Pricing Pilot Review results Anaheim Rebate Pilot Compare performance of models used to estimate demand response peak.
IMPACT EVALUATION OF BGE’S SEP PILOT Ahmad Faruqui, Ph. D. Sanem Sergici, Ph. D. August 12, 2009 Technical Hearings Maryland Public Service Commission.
2015 California Statewide Critical Peak Pricing Evaluation DRMEC Spring 2016 Load Impact Evaluation Workshop San Francisco, California May, 2016 Prepared.
San Diego Gas & Electric February 24 th, 2016 Energy Matinee Pricing Tariff Proposal.
DRMEC Spring 2016 Load Impacts Evaluation Workshop San Francisco, California May 10, SDG&E Summer Saver Load Impact Evaluation.
Communicating Thermostats for Residential Time-of-Use Rates: They Do Make a Difference Presented at ACEEE Summer Study 2008.
Summary of BGE’s Pilot of Innovative Direct Mail Campaign January 27, 2012.
2015 SDG&E PTR/SCTD Evaluation DRMEC Spring 2016 Load Impact Workshop George Jiang May 11 th, 2016 Customer Category Mean Active Participants Mean Reference.
Advanced Meter School August 18-20,2015 Time of Use and Load Profile Jeremiah Swann.
Introducing Smart Energy Pricing Cheryl Hindes
Demand Analysis Working Group Ahmad Faruqui , Ph. D. Principal
Preliminary Electricity Rate and Time of Use Rate Scenarios
Highlights from SMUD's SmartPricing Options Pilot
It’s a Matter of Time: Analyzing the Effects of Dynamic Rate Designs on Low-Income and Senior Electricity Consumers.
Agenda Applying the Tailored Design Method in a Randomized Control Trial Experiment Survey Benjamin Messer Research Into Action, Portland, OR PAPOR Annual.
Retail Rate Options for
Behavior Modification Report with Peak Reduction Component
Impact of Dynamic Pricing on AMR
Presentation transcript:

California’s Statewide Pricing Pilot Summer 2003 Impact Evaluation 17 th Annual Western Conference, San Diego, California Ahmad Faruqui and Stephen S. George Charles River Associates June 25, 2004

CHARLES RIVER ASSOCIATES Work in Progress (6/8/04)—Subject to Revision 2 Outline Design of the Statewide Pricing Pilot (SPP) Methodology and data Residential results Price elasticity estimates Impact simulations

CHARLES RIVER ASSOCIATES Work in Progress (6/8/04)—Subject to Revision 3 The genesis of the Statewide Pricing Pilot (SPP) It is an outgrowth of the CPUC OIR (R ) on advanced metering and demand response The first large-scale scientific experiment focused on dynamic pricing for mass-market consumers Customer enrollment began in April 2003; new rates became effective in July 2003 and will stay in effect through December 2004 SPP addresses several policy issues: What is the price elasticity of demand for electricity by time period? Does responsiveness vary by rate type, climate zone and customer characteristics? Will customers accept time-varying and dynamic rates? Are reductions in energy use and coincident peak demand resulting from widespread use of more economically efficient pricing sufficiently large to off- set the metering costs required to implement rate reform?

CHARLES RIVER ASSOCIATES Work in Progress (6/8/04)—Subject to Revision 4 The SPP is testing several rate options Time-of-Use (TOU) rate Traditional two-part TOU rate Peak period from 2 pm to 7 pm Rates vary seasonally Critical Peak Pricing-Fixed (CPP-F) rate TOU rate 350 days a year Much higher price during peak period on up to 15 days a year, which are called the previous evening Critical Peak Pricing-Variable (CPP-V) rate Similar to CPP-F except they may be called in just 4 hours Critical peak period can vary in length from 1 to 5 hours between 2 pm and 7 pm Both treatment and control group consumers had volunteered into a smart thermostat pilot program funded by Assembly Bill 970 The above rates are layered on top of a very complex, five-tier, increasing block rate structure

CHARLES RIVER ASSOCIATES Work in Progress (6/8/04)—Subject to Revision 5 Additional SPP design features About 2,500 participants drawn from three investor-owned utilities allocated to various treatment and control groups There are multiple price levels and ratios for each rate type in order to allow for estimation of all own-price and cross-price elasticities A mandatory pilot was not politically acceptable Customers were randomly selected but not required to participate The pilot design attempts to mimic a voluntary “opt-out” pricing regime Residential sample segmented into four climate zones C&I sample segmented by size <20 kW and between 20 kW and 200 kW

CHARLES RIVER ASSOCIATES Work in Progress (6/8/04)—Subject to Revision 6 The experiment includes four climate zones

Methodology and Data

CHARLES RIVER ASSOCIATES Work in Progress (6/8/04)—Subject to Revision 8 Two demand models were used to estimate customer price responsiveness Double Log. This expresses the log of peak and off-peak usage as a function of the log of peak and off-peak prices and cooling degree hours during each period Constant elasticity-of-substitution (CES). This expresses the log of the ratio of peak to off-peak usage as a function of the log of the ratio of peak to off-peak price and of the difference in cooling degree hours during the two periods; another equation expresses daily energy usage as a function of daily price and cooling degree hours Both functional forms are estimated using the “fixed-effects” estimation procedure The appendix contains more methodological information

CHARLES RIVER ASSOCIATES Work in Progress (6/8/04)—Subject to Revision 9 Data Characteristics For the CPP-F and CPP-V rates, the demand models were estimated using values that were averaged over all days in the following three time periods Pretreatment period (June only) Non-CPP days in the treatment period CPP days in the treatment period Consequently, there are three time-series observations for each customer, with treatment customers facing a different price for each time period and control customers facing the same price each time The demand models were estimated using pooled time-series, cross- section data A binary variable was used to test whether the price elasticity varies between CPP and non-CPP days for each climate zone. No statistically significant difference was found in zones 2, 3 and 4 using the double-log model and in zones 1, 3 and 4 using the CES model For the TOU models, the regressions were run using values averaged over two time periods Pretreatment period (June only) All weekdays during the treatment period

Residential Analysis Results

CHARLES RIVER ASSOCIATES Work in Progress (6/8/04)—Subject to Revision 11 Key findings for the CPP-F rate Double Log: Own-price elasticities for peak period energy use are statistically significant in zones 2, 3 and 4 Range from low of –0.08 to high of –0.21 Higher in the warmer zones 3 and 4 and lower in the cooler zones 1 and 2 Own-price elasticities for off-peak energy use are statistically significant in zones 1 and 2 Zone 1 elasticity is –0.17 and –0.10 Cross-price elasticities are typically small and often insignificant CES: All elasticities of substitution are small but statistically significant; they range between –0.04 to –0.16, with higher values being observed in the warmer zones The daily price elasticities in zones 3 and 4 are statistically significant and equal –0.06; those in zones 1 and 2 are not significant

CHARLES RIVER ASSOCIATES Work in Progress (6/8/04)—Subject to Revision 12 Key findings for the CPP-V rate Double Log: The own price elasticity for peak period energy use is –0.21 and statistically significant The own price elasticity for off-peak energy use is not statistically significant Cross-price elasticities are typically small or not statistically significant CES: The elasticity of substitution is –0.21 The daily price elasticity is not statistically significant It is important to note that these elasticities pertain to customers who had already volunteered into an earlier pilot program involving smart thermostats and therefore cannot be generalized to the population as a whole

CHARLES RIVER ASSOCIATES Work in Progress (6/8/04)—Subject to Revision 13 Key findings for the TOU rate Double Log: None of the own-price or cross-price elasticities are statistically significant; Interestingly, CPP-F customers on non- CPP days,who face a TOU rate, display significant price elasticities CES: The elasticity of substitution for zones 2 and 3 is statistically significant and ranges between –0.11 and –0.28 None of the daily price elasticities are significant There are a couple of reasons why the TOU price elasticities are not as statistically significant as the CPP-F price elasticities The sample sizes of the TOU customers are smaller than those for the CPP-F rate Without a CPP rate that is exercised a few days each month, customers may forget they are on a time-varying rate

CHARLES RIVER ASSOCIATES Work in Progress (6/8/04)—Subject to Revision 14 Rate impacts can be simulated by using the estimated demand models The estimated demand models can simulate the impact for the rates used in the experiment and for a variety of other rates that are generally similar to the ones used in the experiment They should NOT be made using the point elasticities in the previous slides, since point elasticities will tend to exaggerate the impact of large price increases and underestimate the impact of large price decreases It is important to note that impact simulations require both own and cross-price effects, another reason why relying on just the point estimates of the own-price elasticity will mislead rather than inform policy analysis

CHARLES RIVER ASSOCIATES Work in Progress (6/8/04)—Subject to Revision 15 A Double-Log example of how point elasticities over- state the impact of large price increases

CHARLES RIVER ASSOCIATES Work in Progress (6/8/04)—Subject to Revision 16 Impact analysis is based on the weighted average prices for treatment customers in each climate zone Control Group Average Price 13.3 cents/kWh

CHARLES RIVER ASSOCIATES Work in Progress (6/8/04)—Subject to Revision 17 Peak period impacts are larger in the hotter climate zones than in the cooler zones These estimates come from a sub-sample of customers who volunteered into a smart thermostat pilot and may not be generalizable to the general population of residential customers

CHARLES RIVER ASSOCIATES Work in Progress (6/8/04)—Subject to Revision 18 Impacts are considerably smaller on non- CPP Days, which have lower peak prices These estimates come from a sub-sample of customers who volunteered into a smart thermostat pilot and may not be generalizable to the general population of residential customers

CHARLES RIVER ASSOCIATES Work in Progress (6/8/04)—Subject to Revision 19 Impacts vary somewhat by experimental rate These estimates come from a sub-sample of customers who volunteered into a smart thermostat pilot and may not be generalizable to the general population of residential customers

CHARLES RIVER ASSOCIATES Work in Progress (6/8/04)—Subject to Revision 20 Impacts also vary somewhat by model specification These estimates come from a sub-sample of customers who volunteered into a smart thermostat pilot and may not be generalizable to the general population of residential customers

CHARLES RIVER ASSOCIATES Work in Progress (6/8/04)—Subject to Revision 21 Conclusions Customers show significant response to both the CPP-F and CPP-V rates Impacts are higher in the hotter zones for both CPP and non CPP days Responses are substantially higher on CPP days than on non-CPP days For all zones, the CPP day impact is -12% and the non-CPP day impact is –2.3% CPP day impacts differ slightly between the two experimental rates within the CPP-F rate Results are generally similar across the two functional forms tested in this study Customers respond to TOU rates in zones 2 and 3; and they respond to the TOU portion of the CPP-F rate in zones 3 and 4

CHARLES RIVER ASSOCIATES Work in Progress (6/8/04)—Subject to Revision 22 Next Steps Assess whether price responsiveness varies with weather conditions Assess whether price responsiveness varies with customer characteristics such as the ownership of central air-conditioners Analyze the response of residential customers in the Information Only treatment cells of Track A (Zones 2 and 3) Analyze the response of residential customers in Track B who face an enhanced community-based information treatment Evaluate price responsiveness during Winter Evaluate the response of small C&I customers These results will become available by the end of July

Appendix

CHARLES RIVER ASSOCIATES Work in Progress (6/8/04)—Subject to Revision 24 Double-Log demand model specification This model is estimated with a “fixed-effects” estimation procedure that includes customer-specific constant terms. ln(Q i ) =  +  i d i +  i ln(P i ) +  j ln(P j ) +  (CDH i ) +  where Q i = average daily energy use in the i th period P i = average price during the i th period CDH i = cooling degree hours during the i th period d i = a binary variable equal to 1 for the i th customer, 0 otherwise; these are the fixed effects that don’t vary over time and are customer specific  ii = the own price elasticity of demand for energy during the ith period  ij = the cross price elasticity of demand for energy during the ith period with respect to the price during the jth period  = regression error term

CHARLES RIVER ASSOCIATES Work in Progress (6/8/04)—Subject to Revision 25 Constant Elasticity-Of-Substitution (CES) demand model specification The CES demand model involves two equations, one for assessing the rate of substitution between peak and off-peak energy use and the other for measuring the impact of price changes on daily energy use. The substitution equation has the following form: ln(Q i /Q j ) =  +  i D i +  ln(P i /P j ) +  (CDH i - CDH j ) +  where Q i = average daily energy use per hour in the i th period P i = average price during the i th period CDH i = cooling degree hours per hour during the i th period D i = a binary variable equal to 1 for the i th customer, 0 otherwise  = the elasticity of substitution between peak and off-peak energy use  = regression error term

CHARLES RIVER ASSOCIATES Work in Progress (6/8/04)—Subject to Revision 26 CES demand model specification (continued) The daily demand model specification included in the CES system has the following form. ln(Q d ) =  +  i D i +  p ln(P d ) +  (CDH d ) +  where Q d = average daily energy use per hour P d = average daily price CDH d = average daily cooling degree hours d i = a binary variable equal to 1 for the i th customer, 0 otherwise  p = the own price elasticity of demand for daily energy use  = regression error term

CHARLES RIVER ASSOCIATES Work in Progress (6/8/04)—Subject to Revision 27 The price elasticities of the CES function  ii  =   d z i + w j   ij  =  d z j - w i 

CHARLES RIVER ASSOCIATES Work in Progress (6/8/04)—Subject to Revision 28 Price elasticities and elasticities of substitution for residential energy use for CPP-F tariff Values in bold type are statistically significant at the 95% confidence level ; these point estimates should not be used for making impact simulations Ahmad Faruqui: Footnote elasticities Ahmad Faruqui: Footnote elasticities

CHARLES RIVER ASSOCIATES Work in Progress (6/8/04)—Subject to Revision 29 Price elasticities and elasticities of substitution for residential energy use for CPP-V tariff Values in bold type are statistically significant at the 95% confidence level; these point estimates should not be used for making impact simulations; these estimates come from a sub-sample of customers who volunteered into a smart thermostat pilot and may not be generalizable to the general population of residential customers Ahmad Faruqui: Two footnotes Ahmad Faruqui: Two footnotes

CHARLES RIVER ASSOCIATES Work in Progress (6/8/04)—Subject to Revision 30 Price elasticities and elasticities of substitution for residential energy use for TOU tariff Values in bold type are statistically significant at the 95% confidence level; these point estimates should not be used for making impact simulations