Data Standards Development August 29, 2012. Topics 1.Current Status 2.What was delivered for Build 2c 3.How was IPDA supported 4.What mission support.

Slides:



Advertisements
Similar presentations
1 External Review Results November 30, 2011 Reta Beebe.
Advertisements

LADEE PDS4 Experience G. Delory LADEE Instrument and PDS Teams LADEE SOC PDS Management Council Nov /19/2014 LADEE PDS4 Experience 1.
Rational Unified Process
PPI Node Report Raymond J. Walker Steven P. Joy Todd A. King PDS Management Council March 25, 2010.
System Design/Implementation and Support for Build 2 PDS Management Council Face-to-Face Mountain View, CA Nov 30 - Dec 1, 2011 Sean Hardman.
PDS Radio Science Dick Simpson Stanford University Stanford Status PDS4 Status at Stanford o Testing o Mission Support o Migration Proposal o Tools o Issues.
PDS4 Phoenix Beta Review Lynn D. V. Neakrase Atmospheres Node.
InSight Archive Status Ed Guinness and Susie Slavney PDS Geosciences Node PDS Management Council Berkeley, California November 18-19, 2014.
RUP Fundamentals - Instructor Notes
2-3 April 2009PDS MC Rapid-prototyping tools. 2-3 April 2009PDS MC Rapid-prototyping tools Legend: Gray – Existing tool effort; White – Proposed tool.
IPDA Assessment Results Build 1c Steve Hughes August 2011.
PDS4 Build 3b Status and Readiness Steve Hughes MC Face-to-Face Columbia, Maryland April 2-3, 2013.
PDS4 Project Lifecycle Support for LADEE, MAVEN April 3, 2013.
PDSMC November 29-30, PDS Imaging Node PDS4 Migration Lisa Gaddis (USGS) Sue LaVoie (JPL) November 30, 2012 PDS Management Council Meeting UCLA.
PDS 2010 Project Update Dan Crichton MC Face-to-Face Washington DC March 25-26, 2010.
Geosciences Node Ed Guinness MC Face-to-Face Meeting Washington, DC March 27-28, 2012.
Planetary Science Archive PSA User Group Meeting #1 PSA UG #1  July 2 - 3, 2013  ESAC PSA Archiving Standards.
1 Schema Registries Steven Hughes, Lou Reich, Dan Crichton NASA 21 October 2015.
Rings Node Migration Plan Mark & Mitch PDSMC, UCLA November 28-29, 2012.
1 - A View from the Field - The Next Generation Data Standards For the PDS - PDS4 - ESIP Federation Meeting July 8, 2009 J. Steven Hughes JPL Copyright.
PDS4 Tool Development Strategy PDS Management Council Meeting November 18, 2014 Dan Crichton.
PDS4 and Build 5a Update Dan Crichton, Emily Law November
PDS Geosciences Node Page 1 Archiving Mars Mission Data Sets with the Planetary Data System Report to MEPAG Edward A. Guinness Dept. of Earth and Planetary.
PDS4 Project Report PDS MC F2F Columbia, MD Dan Crichton April 2-3,
Atmospheres Node Report Reta Beebe Nancy Chanover Lyle Huber Lynn Neakrase Jim Murphy Irma Trejo Matias Roybal Shannon Rees.
Label Design Tool Management Council F2F Washington, D.C. November 29-30, 2006
Data Standards and Build 3b Plans Steve Hughes MC Face-to-Face UCLA, Los Angeles, CA November 28-29, 2012.
PDS4 Project Update PDS MC F2F Flagstaff, AZ Dan Crichton August 22,
PDS M/C August 2012 PPI Node Report PDS Management Council August 28-29, 2012 R. J. Walker S. P. Joy T.A. King J. Mafi.
System Design and Deployment Status PDS Management Council Face-to-Face UCLA, Los Angeles, California November 28-29, 2012 Sean Hardman.
PDS Atmospheres Node Plans for PDS4 User Roll-out 8/28/12PDS4 Roll-outStatus 1 Reta Beebe Lyle Huber Lynn Neakrase Jim Murphy Nancy Chanover Joni Johnson.
PDS M/C November 2012 PPI Data Migration Planning PPI PDS4 Data Migration Planning PDS Management Council November 28, 2012 T. King.
SPASE and the VxOs Jim Thieman Todd King Aaron Roberts.
1 PDS 4 Data Design WG Face-to-Face Summary PDS Management Council March 25, 2010.
SCORM Status. 2 Stabilization, Clarification and Issue Resolution Bug Fixes, Corrections & Clarifications SCORM 2004 January 2004 SCORM nd Edition.
Operations Report PDS Management Council Meeting Flagstaff, Arizona August 2006
PPI Node R.J. Walker, T.A. King, S.P. Joy, J.N. Mafi MC Face-to-Face Meeting Westwood, California 26 August 2014.
PDS Geosciences Node Page 1 Archiving LCROSS Ground Observation Data in the Planetary Data System Edward Guinness and Susan Slavney PDS Geosciences Node.
Software Development and Deployment PDS Management Council Face-to-Face Los Angeles, California August 26-27, 2014 Sean Hardman.
Development Report Engineering Node August 2006
System/SDWG Update Management Council Face-to-Face Flagstaff, AZ August 22-23, 2011 Sean Hardman.
PDS4 Mission Needs Assessment Reta Beebe Dan Crichton.
SunGuide SM Software Development Project End of the Year ITS Working Group Meeting December 7, 2005.
Software Development and Deployment PDS Management Council Face-to-Face Berkeley, California November 18-19, 2014 Sean Hardman.
Small Bodies Node Ludmilla Kolokolova Carol Neese, Mike A’Hearn, Anne Raugh MC Face-to-Face Meeting Westwood, California 26,27 August 2014.
Lifecycle Metadata for Digital Objects November 15, 2004 Preservation Metadata.
Small Bodies Node Report Michael F. A’Hearn, Donald R. Davis, Ludmilla Kolokolova, & Carol Neese 28/8/12PDS Management Councilmfa 1.
MAVEN Archive Overview J. Mafi PDSMC Face-to-Face Berkeley, California 18 November 2014.
PDS4 Build 3b System Readiness PDS Management Council Face-to-Face Columbia, Maryland April 2-3, 2013 Sean Hardman.
Assessment of Build 1d PDS4 Standards Reta Beebe Dan Crichton.
DEX Publication Project OASIS PLCS TC Face to Face meeting 10 March 2008 Trine Hansen.
PDS M/C November 2012 PPI MAVEN Report PDS4 Mission Report: MAVEN PDS Management Council November 28, 2012 J. Mafi.
Tools Report Engineering Node March 2007
PDS4 Deployment Planning (Discussion) PDS MC F2F Columbia, Maryland Dan Crichton August 28,
PDS4 Project Report PDS MC F2F UCLA Dan Crichton November 28,
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
International Planetary Data Alliance Registry Development and Coordination Project Report 7 th IPDA Steering Committee Meeting July 13, 2012.
IPDA PDS4 Report July 17, PDS4: The Next Generation PDS PDS4 is a PDS-wide project to upgrade from PDS version 3 to version 4 to address many.
NASA PLANETARY DATA SYSTEM ARCHIVING IPDA Steering Committee Reta Beebe, Dan Crichton Paris, France July
Review for Eclipse Release Review | © 2012 by Review for Eclipse Committers, made available under the EPL v1.0 1 Review for Eclipse (R4E) 0.11 Release.
April 2, 2009PDS Management Council - PPI Node1 Planetary Plasma Interactions Node PDS Management Council Presentation April 2, 2009 Raymond Walker Steven.
International Planetary Data Alliance Registry Project Update September 16, 2011.
SBN-UMD short report. . Identify Missions and Instruments where archive products are behind schedule; particularly, those where the identified issues.
IPDA Registry Definitions Project Dan Crichton Pedro Osuna Alain Sarkissian.
PDS 2010 System Design Report MC Face-to-Face Washington, DC March 25-26, 2010.
PDS4 Update Dan Crichton August 2014.
IPDA PDS4 Report PDS Team July 2015.
PDAP Query Language International Planetary Data Alliance
Atmospheres Node Report
Web-based Imaging Management System Working Group - WIMS
Presentation transcript:

Data Standards Development August 29, 2012

Topics 1.Current Status 2.What was delivered for Build 2c 3.How was IPDA supported 4.What mission support is being provided 5.What will be delivered for Build 3a 6.Status of RFAs 7.Plan for FY13 2

Current Status Node bundle development and testing has allowed significant progress toward stabilizing the PDS4 core data standards. The resulting RFAs have been much more specific and have help to mature the core information model and resulting schemas. Issues with significant impact on core software (registry and harvester) have been identified and are being addressed for build 3a. After build 3a the work will be realigned toward supporting data users, specifically in the discipline and mission level areas of the model. 3

What was delivered for Build 2c Posted PDS4 Data Standards release 0800k for operational use. Release 0800k was primarily a maintenance release with about 66 changes due to RFAs from previous builds. Added support for additional data products including those with images and bit fields. Improved support for MAVEN and LADEE. Migrated the PDS3 central catalog content to PDS4 context products. Documents posted to (not yet linked from homepage) Released new versions of the DPH and Standards Reference.

How was IPDA supported Synchronized the 2012 IPDA “PDS4 Prototype” project activities with PDS4 build 2b and 2c releases. The project prototyped a PDS4 product pipeline. The IPDA project provided review comments for: Information model XML Schemas Documentation Also provided development input for local data dictionary prototype and conversion tools

Mission Preparation - LADEE Schedule SIS development has begun – ready for review by end of October 2012 Review of sample products and SIS complete by end of January 2013 Completion of liens by June 2013 Launch end of July – Beginning of August Early 2014 – first data delivery 6

Mission Preparation - LADEE Instruments: Ultraviolet/Visible Spectrometer (ATM) Neutral Mass Spectrometer (ATM) Lunar Dust EXperiment (SBN) Data types: ASCII tables Requirements on PDS4 Data Standards Character Table: These are stable enough in the current version to support LADEE. 7

Mission Preparation - MAVEN Schedule SIS development has begun 2015-Apr: first data delivery Instruments: 4 particle, MAG, Plasma wave. Data types: ASCII tables and binary tables 8

Mission Preparation - MAVEN Requirements on PDS4 Data Standards character and binary tables: These are stable enough in the current version to support MAVEN. bit fields – These have been successfully tested using selected Radio Science data. Searching for remaining issues. delivery packages – Three packages have been prototyped and are under review. They are based on the original PPI concept and the OAIS Information Package. 9

Mission Preparation - Bepi Colombo Schedule Begin prototype labels in November with instrument teams 10

What will be delivered for Build 3a Collection.Inventory – Separated the logical from the physical Primary Results Summary – Identified a set of cross-discipline search attributes and values. Discipline specific values will be placed in the discipline area of the label Vector/Quaternions – Review and finalize models. Define the Local Data Dictionary Synchronize standards documents to the build release of the information model Glossary, Standards Reference, DPH, Data Dictionary, and Data Provider’s WIKI. Plus additional resolved RFAs 11

RFA Status Summary of Major Changes since Build 2c Simplified the Collection.Inventory by moving the physical information to a separate structure and changed the format to Delimited.Table. Redesigned the Primary_Result_Description class. * RFAs have become very specific, but generally result in simple changes 12 SUMMARY ACCEPTED 0 PENDING 39 IMPLEMENTED 108 DELIVERED15 CLOSED85 POSTPONED 9 TOTAL256

RFA Statuses 13. ACCEPTED – RFA reviewed, accepted and in queue; work not yet started. PENDING – RFA reviewed, accepted but little work done. IMPLEMENTED – RFA reviewed, accepted, and work completed. Re-review and re-opening allowed. DELIVERED – RFA reviewed, accepted, and work completed. Released in build. POSTPONED – RFA reviewed and accepted but work scheduled for later build. CLOSED – RFA reviewed and either subsumed or contradicts a DDWG decision. No work done.

RFA Resolution Philosophy 14. Anyone can submit an RFA. Each RFA is bookkept and reviewed. First decision point is whether the RFA contradicts a previously made DDWG or system decision. If so the RFA is closed. An RFA can be also be closed if it can be subsumed by a similar RFA. Second decision point is whether the RFA is actionable. If so then the work is done. Finally it is assumed that the RFA requires DDWG discussion. It is put on the DDWG agenda for discussion and resolution.

Example RFAs 15. Determine impact of updated ebXML standard on PDS4 system and data - Closed Modification_Detail has cardinality 1 when used in Modification_History. – Implemented No default unit for file_size is specified. – Implemented Grouped fields appear to be a mess. – Delivered Naming of types and elements should be consistent. (E.g., Array_2D vs. UnitOfMeasure_Storage) – Pending Array_Element scaling_factor and value_offset - It would be very convenient if a default value were given. – Pending

Plan for FY13 Align the Standards Reference with the Information Model. Support deployment of the PDS4 system Support the development of web services for PDS4 Data Standards. (e.g. Data Dictionary service) Refocus efforts to discipline and mission level areas of the model For example cartography, geometry, and calibration Augment regression test suite with the node Bundle tests and make them available to developers. Update and activate Standards Change Control Process for PDS4 16

Backup 17