Systems Planning and Project Planning: Is Integration Needed? One of the weaknesses in our current SDLC methodologies is the isolation of system design.

Slides:



Advertisements
Similar presentations
Modern Systems Analyst and as a Project Manager
Advertisements

Project Managing a PH D And surviving the process Paul Hyland.
So You Want to Break Into the Industry… SAS No. 94 Requirements and Issues Related to IT Audits for Not-for-Profit Organizations.
Introduction to Systems Development and Systems Analysis
The Chaos Report © The Standish Group 1995.
Project What is a project A temporary endeavor undertaken to create a unique product, service or result.
Chapter 2 The Analyst as a Project Manager
Systems Analysis and Design in a Changing World, Fourth Edition
Software Engineering Modern Approaches Eric Braude and Michael Bernstein 1.
Transaction Processing Systems: The Need for Systems Design Methodology Teaching Paul Rosenthal California State University, Los Angeles.
Information Systems Education: What’s missing? Paul H. Rosenthal Information Systems Department, California State University, Los Angeles.
Overview of WHY CIS 581: IS\IT means change, change means projects, then IS/IT Terminology and Skills Professor Rosenthal Scheme.
Project Work and Administration
Requirements Specifications Today: Homework #1 due For next class: Pressman 11; SRD Team Status Reports Requirements Process (continued) Bio Break ( 5.
4. 2Object-Oriented Analysis and Design with the Unified Process Objectives  Explain the elements of project management and the responsibilities of a.
The Analyst as a Project Manager
Chapter 1 The Systems Development Environment. SAD/CHAPTER 1 2 Learning Objectives Understand the concept of systems analysis and design as a disciplined.
IST 210 Database Design Process IST 210 Todd S. Bacastow.
Planning. SDLC Planning Analysis Design Implementation.
Welcome to CMPE003 Personal Computer Concepts: Hardware and Software Winter 2003 UC Santa Cruz Instructor: Guy Cox.
Chapter 9. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
Systems Analysis and Design: The Big Picture
Chapter 3 The Analyst as a Project Manager
Systems Analysis and Design in a Changing World, 6th Edition
Systems Analysis and Design in a Changing World, Fifth Edition
CIS 321—IS Analysis & Design Chapter 3: The Analyst as a Project Manager.
Supporting tools in an IT Project & Portfolio Management environment Ann Van Belle -
Systems Development Lifecycle Project Identification & Selection Project Initiation & Planning Analysis Logical Design Physical Design Implementation Maintenance.
Copyright 2002 Prentice-Hall, Inc. Chapter 1 The Systems Development Environment 1.1 Modern Systems Analysis and Design.
Reporting to Management Using Microsoft Project and EPM Derek Loar, Pcubed.
Information Systems Analysis and Design
Establishing a Best Practice Community It Takes a Village to Make a Successful Project Presented by Emily Iem, PMP, CBAP.
PMO Incremental Growth Model. Program Management Office Functions2  Risk Identification  Risk Analysis  Risk Response Planning  Integrated Risk Response.
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 IS Projects: Success and Failure Role of the Project Manager Project Management Tasks in SDLC.
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
Chapter 10 Information Systems Analysis and Design
Virginia Enterprise Applications Program (VEAP) Agency Information Technology Resource (AITR) Tuesday, May 15 th, 2007
Chapter 11. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
1 Requirements Management - General concepts - Noureddine Abbadeni King Saud University College of Computer and Information Sciences Based on “Software.
The Systems Development Life Cycle
3 1 Project Success Factors u Project management important for success of system development project u 2000 Standish Group Study l Only 28% of system development.
Project Management For the Non Project Manager 1.
Ihr Logo Chapter 6 Decision Support System Development Turban, Aronson, and Liang Decision Support Systems and Intelligent Systems, Seventh Edition.
Systems Analysis and Design in a Changing World, Fourth Edition
SYSTEMS DEVELOPMENT IN PERSPECTIVE
Does IS Education Address Enterprise IT User Concerns? Bart Longenecker University of South Alabama Paul Rosenthal California State University, Los Angeles.
Systems Analysis and Design in a Changing World, Fifth Edition
SWE 513: Software Engineering
Chapter One Developments in the Application of Information Technology in Business Presented by James Weimholt.
1 Systems Analysis and Design in a Changing World, Tuesday, January 23, 2007.
Project success = business success TM Introduction to Agility Agility is a comprehensive response to the business challenges of profiting from rapidly.
Physical Level Systems Design: A Methodology for Inclusion in Our Systems Analysis and Design Textbooks Paul H. Rosenthal L. Jane Park College of Business.
Major Project Governance Assessment Toolkit Mark Ritchie, University of Edinburgh Pauline Woods-Wilson, Lancaster University Project and Change Management.
Final Review Systems Analysis and Design in a Changing World, 4th Edition 1 Final Review u Chapters 1-6, 8-10, 13, 14, 15 u Multiple choice, short answer,
Chapter 15 Telecommunication Department Management.
303KM, Introduction to Project Management1 Chapter 1: Introduction to Project Management.
Accounting Intelligence and Business Intelligence - the perfect marriage for success Noah Kluge.
Requirements Introduction Emerson Murphy-Hill. Scope of Software Project Failures WHY PROJECTS FAIL % 1. Incomplete Requirements Lack of user involvement12.4.
Database Development (8 May 2017).
Fundamentals of Information Systems, Sixth Edition
Systems Analysis and Design in a Changing World, 4th Edition
CASE Tools and Joint and Rapid Application Development
Reasons why IT projects fail (and solutions)
Database Design Process
FORMAL SYSTEM DEVELOPMENT METHODOLOGIES
Received and Acknowledged
The FoxMeyer Drugs’ ERP PRESENTATION.
Fail Fail Poor Communication Lack of Documentation Poor Execution.
Project Management Chapter 11.
Presentation transcript:

Systems Planning and Project Planning: Is Integration Needed? One of the weaknesses in our current SDLC methodologies is the isolation of system design and project management practice Paul H. Rosenthal California State University, Los Angeles

2 The Poor Status of IT Governance I. Low Usage of Experienced Designers Project Failure reasons stable for 50 years II. Need for Integrated Design – 44% of technology projects are PARTIAL Successes – Our Status Score: C- – The Integration of system design and project management practice can help solve this problem The Standish Group Report

3

Quality of our Systems and Project Planning Quality of Systems Planning70% Quality of Sequential Systems & Project Planning30% Quality of Sequential Project Planning (.7 times QPP =.3) 43%* * Our Professional level Project Planning is not this Bad Quality of Systems Planning70% Quality of Project Planning70% Potential Quality of Integrated Systems & Project Planning 49% Success 4

5

An Approach to Integrated Systems & Project Planning

1- Logical systems analysis (Initiation - find the underlying problem) 7

My Take on the Underlying Problems 1.Simplistic Physical Design – Typical charting methods do not present true scope and complexity of the systems – All stakeholders do not understand both WHAT and HOW 2.Lack of Design/Cost-Benefit Iteration – Management, technical, staffing, and financial participants in design cannot properly participate in the iterative cost-benefit process 8

Logical Systems Design Process 9

10

The Physical Design Methodology For TPS, a physical design is created from a DFD based logical design, by separating processes and data stores by: time (daily vs. monthly, day vs. night...), place (client or server, centralized vs. distributed...), online vs. batch, manual vs. automated, etc. 11

A Physical System Design 12

Physical Project Design 13

14

15

Will Integration Solve these Problems? Top 5 Failure Factors From Systems Management From Project Management Incomplete and/or Changing Requirements, Unrealistic Expectations X Lack of User and/or Executive Support X Unrealistic Budgets and /or Schedules X Lack of Project and/or Technology Management XX Systems and/or Project Planning and/or Implementation Illiteracy XX 16