Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.

Slides:



Advertisements
Similar presentations
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Advertisements

1 Jim Thomas - LBL A Brief Introduction to the STAR Time Projection Chamber Jim Thomas Lawrence Berkeley National Laboratory June 4 th, 2009.
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
2/9/2004DC status - BVR1 1.Mechanics 2.Foil 3.Frame and Print Anode Inner cathode Hood 4.Pressure control + He bag + target 5.Electronic 6.Schedule Status.
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
US CMS Collaboration Meeting, UC Riverside, May 19, Endcap Muons John Layter US CMS Collaboration Meeting May 19, 2001.
PRODUCTION and CERTIFICATION of Multi Wires Proportional Chambers for the LHCb Muon System at CERN K.Mair for the LHCb Muon Group CERN* Poster anlässlich.
D. Peterson, “Tracking Detector R&D at Cornell University and Purdue University” ALCPG SLAC 07-Jan Tracking Detector R&D at Cornell University and.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Saverio MINUTOLITIG meeting, 10 February Report on T1 installation activities and achievements made during this shutdown.
Chamber PCB s, FEB s, Cooling, HV/LV Distribution 1)PCB designs-track widths, track to track distances … 2) Double sided and Multi layer, modular approach.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
1 SBS Spectrometer / GEP5 Conf.. 2 Tracking Requirements Requirements Tracking Technology DriftMPGDSilicon High Rate: MHz/cm 2 (Front Tracker)
The forward detectors of CMS Experiment at LHC Bolek Wyslouch MIT
2012 IEEE Nuclear Science Symposium Anaheim, California S. Colafranceschi (CERN) and M. Hohlmann (Florida Institute of Technology) (for the CMS GEM Collaboration)
Gueorgui ANTCHEVNEC’2013 – Varna, Bulgaria 1 The TOTEM Experiment Consolidation and Upgrade G. Antchev * On behalf of the TOTEM Collaboration * INRNE-BAS,
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
CMS Muon Chambers Long term studies at GIF++ Andrey Marinov On Behalf of Long Term Studies of the CMS Muon Detectors 1.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
HallA/SBS – Front Tracker PARAMETERDESIGN VALUE Microstrip Silicon Detector Number of tiles/plane and size2 Number of planes2 Size of the single
Test Beam the μ-RWELL Test Beam the μ-RWELL G. Bencivenni (a), R. de Oliveira (b), M. Gatta (a), G. Felici (a), G. Morello (a), M. Poli Lener (a) (a),
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Malte Hildebrandt, PSIMEG - Review Meeting / 1   e  Drift Chambers Charge Division Test Chamber Testsetup for Cosmics Chamber Construction.
Yiftah Silver Tel Aviv University September 27 th 2012.
Design and development of micro-strip stacked module prototypes for tracking at S-LHC Motivations Tracking detectors at future hadron colliders will operate.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
M. Bianco On behalf of the ATLAS Collaboration
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
Tests of RPCs (Resistive Plate Chambers) for the ARGO experiment at YBJ G. Aielli¹, P.Camarri¹, R. Cardarelli¹, M. Civardi², L. Di Stante¹, B. Liberti¹,
Large-Area GEM Detector Development at CMS, RD51, and Fl. Tech – A brief overview – Marcus Hohlmann Florida Institute of Technology, Melbourne, FL PHENIX.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
E. Robutti TOTEM T1 Engineering Design Review CERN, March 7, 2006 CSC detector requirements and perfomance Enrico Robutti I.N.F.N. Genova.
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Front Tracker: main technical solutions 40x50 cm 2 module Front Tracker Chamber: 40x150 cm 2  Use COMPASS approach: 3xGEM, 2D readout - one significant.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009 TOTEM Electronics Status.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
Joerg Dubert’s Questions as you all aware we currently do not yet know how the final mechanical design of the new Small Wheel will look like. Nevertheless,
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
MPGD TECHNOLOGIES AND PRODUCTION GEMMicromegas Resistive MSGC (NEW!) Rui De Oliveira 7/12/20111Rui De Oliveira.
The Totem trigger architecture The LONEG firmware archtecture
ATLAS-MUON Trigger hardware developments
T1 status (a selection from EDR presentations)
DCH FEE 28 chs DCH prototype FEE &
CMS muon detectors and muon system performance
Vacuum chamber for the CMS forward region
Chamber Design and Integration RE3/1 and RE4/1
Numerical simulations on single mask conical GEMs
The digital read-out for the CSC system of the TOTEM experiment at LHC
The electronics system of the TOTEM T1 telescope
The digital read-out for the CSC system of the experiment TOTEM at LHC
The digital read-out for the CSC system of the TOTEM experiment at LHC
(On Behalf of CMS Muon Group)
Presentation transcript:

Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1  Brief description of the mechanics  Some comments on the electronics  System aspects Gas system and gas distribution Cooling HV …

Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo2 Cathode electrodes panels  Honeycomb panels 10 mm thick Nomex honeycomb 0.6 mm thick fiberglass skin (printed board)  Cathode strips design same for both sides of detector Strips will cross at +/- 60 degree angle artwork obtained with printed board technique before gluing skin on panel Easy for board width up to cm Only 1 company (CICOREL) for larger dimensions Final planarity within tolerances (+/- 0.2 mm) Easy to shape boards Two identical boards needed to build one detector

Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo3 CSC side A  Wire support frame glued in position Printed board soldering pads Thickness defines anode cathode distance  precise machining  HV distribution and decoupling HV distribution to wires via decoupling resistor At amplifier end small board with decoupling capacitor, protection diodes and resistor  Wires soldered in position, then glued  Wire mechanical tension measured for each wire

Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo4 CSC Side B  Fiberglass frame determines exact distance between cathode planes  No HV  slightly smaller dimensions  Provides gas tightness  Gas distribution in the two sides Gas distribution flow test with plexiglas detector and smoke gave uniform gas distribution in the gap  Relative position of the two sides defined by 2 dowels

Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo5 Gas distribution  Hollow channel in the two sides  Small holes uniformly distributed  Test with smoke has proven good flow uniformity

Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo6 Electronics 1 TOTEM telescope (5 planes) Is NOT equivalent to (from the point of view of R/O): 1 CMS chamber (6 planes) è in TOTEM signals are generated far apart.  CMS system foresees: sample and store with sophisticated analog memory to solve pile-up problems (SCA chip) and cope with trigger latency each cluster strip hit generates 16 data words (for 8 time samples) Fast trigger logic gives “digital” position of cluster with ½ strip precision (an order of magnitude worst than analog read/out) Coincidence of anode (wire) signals to determine timing of track

Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo7 Read Out data  channel count for present layout (half- telescope): 3135 anode wires with 3 mm pitch 5249 cathode strips of 5 mm pitch (both cathode planes are read out)  Read out of full detector at each event creates too many data… need data reduction (track selection) at trigger level  Work in progress on detailed definition of plane and telescope concentrator boards To reduce amount of data Maintain information like timing, pile-up etc. Understand which boards need to be redesigned/built

Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo8 GAS distribution  Gas mixture prepared in surface (independent gas zone)  Distribution Forward/backward in counting room  Gas lines from counting room via the HF cable tray  In T1 there will be 1 gas line for the 3 detectors in the half-plane (series flow)

Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo9 Cooling  All the power dissipated by the electronics inside the magnets must be “removed” using appropriate cooling.  ~200W of power dissipated by the half- plane electronics (1kW for half-telelescope) For the number of channels considered at present  Electronics boards installed on the support separator in which is integrated a water pipe for cooling. T in ~18-20 degrees T out ~25 degrees

Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo10 HV - Low Voltage  Each CSC will have individual HV setting capability (on, off, current and volt. protect)  Power must be adequate for largest rate foreseen (~ 30 μA/ channel)  Low Voltage power regulation at plane level  Power …. Total power needed(?) Use same system as CMS … (?)  One rack on the platform on top of HF to house VME crate(s), gas distribution, Low and HV distribution. No transformers! Fringe field ~500 gauss.

Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo11 Radiation  All materials employed taken from the list of tested components for radiation.  Generically (to be defined better) dose in T1 is approx two order of magnitude larger than in the CMS CSC.  They can stand … 10 years at  Our detector at most stand 1 year at 10 33