MN IDS Project Progress Update. MN IDS Update Progress to date v Test Intersection v Sensor evaluation results v Benefit:cost efforts progress v Human.

Slides:



Advertisements
Similar presentations
PHOTOSafe Newport News
Advertisements

Tracy Lovell, PE A FOCUSED APPROACH TO SAFETY. Provide a Transportation System  Safe  Efficient  Environmentally Sound  Fiscally Responsible.
Software Engineering CSE470: Process 15 Software Engineering Phases Definition: What? Development: How? Maintenance: Managing change Umbrella Activities:
© Ricardo plc 2012 Eric Chan, Ricardo UK Ltd 21 st October 2012 SARTRE Demonstration System The research leading to these results.
DIGITAL HIGHWAY MEASUREMENTS TURNER-FAIRBANK HIGHWAY RESEARCH CENTER David Gibson Milton (Pete) Mills Morton Oskard ADVANCED RESEARCH PROJECT 1.
Sixth Hour Lecture 10:30 – 11:20 am, September 9 Framework for a Software Management Process – Artifacts of the Process (Part II, Chapter 6 of Royce’ book)
Board Update F-10 Deployment and Field Testing of Novel Water and Ice Sensor Systems on Bridge Decks John F. Evans Dept. of Chemistry and Biochemistry.
Human Factors Research Issues for Cooperative Intersection Collision Avoidance Systems (CICAS) Vicki Neale, Ph.D. Director, Center for Vehicle-Infrastructure.
A Tracking-based Traffic Performance measurement System for Roundabouts/Intersections PI: Hua Tang Graduate students: Hai Dinh Electrical and Computer.
June 2011 Statewide Traffic Engineers Meeting Interstate Guide Sign Upgrade Projects.
Benefit Cost Analysis For Intersection Driver Support Systems David Levinson & Xi Zou 2004.
Red Light Photo Enforcement & Crime Scene Investigation William Fisher Photo Safety Program.
Change Advisory Board COIN v1.ppt Change Advisory Board ITIL COIN June 20, 2007.
Release & Deployment ITIL Version 3
Cooperative Intersection Collision Avoidance Systems Initiative May 2005, ITS America Annual Meeting Mike Schagrin ITS Joint Program Office U.S. Department.
Rural Intersection Decision Support (IDS) System: Status and Future Work Alec Gorjestani Arvind Menon Pi-Ming Cheng Lee Alexander Bryan Newstrom Craig.
Crash Mitigation At Rural Unsignalized Intersections Providing Intersection Decision Support (IDS) for the Driver Inter-Regional Corridors: Hi-speed, hi-density.
MnDOT Sample Plan - Jerry Kotzenmacher MnDOT
October 6, :30 – 11:00. MPM Team Agenda Review of MPM program and team MAP-21 and other updates Mobility performance measures reporting On-going.
MN IDS Intersection Construction Update. MN IDS Test Intersection u Design Completed 15 Jan 2004 u Design review with Mn/DOT traffic, geometric, district,
Dillon: CSE470: SE, Process1 Software Engineering Phases l Definition: What? l Development: How? l Maintenance: Managing change l Umbrella Activities:
SS28: Cooperative Systems II: Bits, Bytes, and Brakes Mike Schagrin US Department of Transportation ITS Joint Program Office International Harmonization.
Intersection Control Evaluation (ICE). Outline  Background  ICE Process  Impacts  Current Status.
OSF/ISD Project Portfolio Management Framework January 17, 2011.
National VII Architecture – Data Perspective Michael Schagrin ITS Joint Program Office US Department of Transportation TRB 2008 Annual Meeting Session.
1 Development and Evaluation of Selected Mobility Applications for VII (a.k.a. IntelliDrive) Steven E. Shladover, Sc.D. California PATH Program Institute.
MEASUREMENT PLAN SOFTWARE MEASUREMENT & ANALYSIS Team Assignment 15
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Meeting of State Pooled Fund Partners April 20, 2005 "Reducing Crashes at Rural Intersections: Toward a Multi-State Consensus on Rural Intersection Decision.
Rural Intersection Collision Avoidance System (RICAS) US Highway 53 and State Highway 73 Minong, Wisconsin Additional information Project Website:
1 Clarus: The National Surface Transportation Weather Observing and Forecasting System Roemer M. Alfelor FHWA Office of Transportation Operations Washington.
CICAS Coordination Meeting September 27 th, 2004 Virginia Overview.
Test Intersection: Status, Results, Preparation for State Data Collection Lee Alexander Pi-Ming Cheng Alec Gorjestani Arvind Menon Craig Shankwitz Intelligent.
Research Committee – June 2008 No meeting this week Next meeting: –January 2009, FHWA TFHRC Research presentations Simulator demonstration –More details.
BUSINESS SENSITIVE 1 Annual Meeting of the AASHTO Subcommittee on Design Human Factors Guidelines (HFG) for Road Systems (NCHRP 17-41) July 22, 2009 John.
Results of IDS Rural Intersection Data Collection Lee Alexander Pi-Ming Cheng Max Donath Alec Gorjestani Arvind Menon Bryan Newstrom Craig Shankwitz April.
Project Life Cycle.
Interacting With Other Users. Most collisions occur when two or more objects try to occupy the same space at the same time. Drivers must identify movement.
Mitigation of Crashes At Unsignalized Rural Intersections IDS Quarterly Meeting June 14-5, 2004 Providing Intersection Decision Support for the Driver:
Portable IDS Design Issues and Tradeoffs Lee Alexander Intelligent Vehicles Lab University of Minnesota.
Data Palooza Workshop May 9, 2013 Rabinder Bains, FHWA – Office of Policy and Government Affairs.
September 25, 2013 Greg Davis FHWA Office of Safety Research, Development and Test Overview of V2I Safety Applications.
Rural Intersection Decision Support (IDS) System Demo Highlights What you won’t see (Well, probably not this)
Benchtesting Driver Support and Collision Avoidance Systems using Naturalistic Driving Data Shane McLaughlin March 17, 2011.
University of Minnesota Intersection Decision Support Research - Results of Crash Analysis University of Minnesota Intersection Decision Support Research.
Status of ITS research May Peter Sweatman David Kapp.
Toward a Multi-State Consensus on Rural Intersection Decision Support: Objectives u Gain understanding of issues involved with national rural intersection.
Cooperative Intersection Collision Avoidance Systems – Stop Sign Assist (CICAS-SSA) ITS America 2007 Annual Meeting Session.
Ray Resendes Intelligent Technologies Research Division National Highway Traffic Safety Administration Ray Resendes Intelligent Technologies Research Division.
Research Elements of Integrated Vehicle Based Safety Systems Jack Ference, IVBSS Technical Manager ITS America Annual Meeting May, 2005.
Motivation, high level description for a portable IDS system Lee Alexander Pi-Ming Cheng Alec Gorjestani Arvind Menon Craig Shankwitz Intelligent Vehicles.
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
Interactive Highway Safety Design Model (IHSDM) By Josh Hinds.
1 Integrated Vehicle-Based Safety Systems Initiative Jack Ference United States Department of Transportation 2006 ITS World Congress 8-12 October 2006.
INTERSECTION WARNING SYSTEMS Jon Jackels Mn/DOT ITS Program Engineer Traffic Topics April 7, 2011.
Safety Starts with Crash Data Vision Zero Conference Bicycle Coalition of Greater Philadelphia December 3, 2015 Patricia Ott, P.E. MBO Engineering, LLC.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
Highway Safety Analysis: Engineering Kenneth Epstein, P.E. Federal Highway Administration Office of Safety Programs Safety Data and Analysis Tools Workshop.
1 IntelliDrive SM Vehicle to Infrastructure Connectivity for Safety Applications Greg Davis FHWA Office of Safety RD&T U.S. Department of Transportation.
Digital Highway Measurement System Qatar Ministry of Transportation August 15, 2007 Dr. Kunik Lee Chief Safety Scientist, Office of Safety R&D TFHRC, FHWA,
1 Evaluation of Low-Cost Safety Improvements (ELCSI) Pooled Fund Study Roya Amjadi, Highway Research Engineer FHWA, Turner-Fairbank Research Center 10/24/08.
Project Management Processes for a Project
Human Factors Progress IDS Project Nicholas Ward Jason Laberge Mick Rakauskas HumanFIRST Program.
Minnesota Team: Mitigation of Crashes At Unsignalized Rural Intersections 1 st CICAS Coordination Meeting Sept. 27, 2004 Intersection Decision Support.
Rural Intersection Decision Support - Crash Analysis Rural Intersection Decision Support - Crash Analysis Presented at Pooled Fund Meeting April 19, 2004.
Archiving and Document Transfer Utilities
Virginia Department of Education
Results and Status of State Crash Analyses
Mike Schagrin ITS Joint Program Office
Results and Status of State Crash Analyses
Presentation transcript:

MN IDS Project Progress Update

MN IDS Update Progress to date v Test Intersection v Sensor evaluation results v Benefit:cost efforts progress v Human Factors (Max) v Rural Intersection Pooled Fund Study (Max) Upcoming work v Intersection on line v Simulator Studies v MUTCD approval v Benefit:cost analyses

MN IDS Test Intersection u Design Completed 15 Jan 2004 u Design review with Mn/DOT traffic, geometric, district, and ESS engineers v Good advice Recommendations for sensor mounts Nothing in the median lasts  Revised cross-roads surveillance Laser sensors to Visible Light/IR Cameras v Explored opportunity to cooperate on construction Month of negotiations, didn’t work out.  ROC 52  ESS

MN Test Intersection Overview

Present Instrumentation u Mainline v Vehicle speed, position, lane of travel (Radar) v 2000 foot coverage before Xroads (Radar) v 800 foot coverage beyond (Radar) v 53’x36’ coverage at camera (IR/Visible) v Hardwired and Wireless Communication Cost and performance trade-off analyses u Crossroads v Vehicle type (Radar and laser based) v Vehicle approach speed (adapt VA technology at a later date?) v Trajectory leaving minor road Right turn (camera + radar) Straight through (camera) Left turn (camera + radar)

MN Test Intersection-Mainline Sensors Radar Camera Suite (for evaluation) Camera FOV 53’x36’ Radar to track vehicles past crossroads (primarily for minor road trajectory recording)

Mainline Highlights u Camera / mast provides independent means to verify v Radar performance v Camera performance v Gap tracker performance v Emerging technologies u May or may not be part of final system v Benefit:cost analysis v Poor weather capability of vision based systems

Mainline Radar Sensor

Laser / Radar Sensor Mount Approved by Mn/DOT Right-of-Way Engineer 350 Crash worthy Will include break-away conduit and connector Will include reflector at top of 3# U channel

Radar Performance Results: Geometrics

Radar Performance Results: Coverage

Radar Performance Results: Lane Classification Errors

Radar Performance Results: Speed Errors

Intersection Crossroads-Vehicle Trajectory C4 FOV C3 FOV Cameras at intersection corners capture the trajectory of vehicles entering intersection from minor roads. Mn/DOT advised that median-based sensors won’t live. (Crashed out).

Camera Mount Detail

Camera Based Validation Tracking on this side No tracking on this side

Intersection Crossroads – Vehicle Classification Horizontal Laser Scanner Vertical Laser Scanner Classification Capable T-300 Radar Classification Capable T-300 Radar

R/WIS Data from Intersection Mn/DOT updates at 10 Minute intervals. Data collected every 10 minutes

Information Available from Intersection u Distribution of gaps accepted by drivers v for right turns v for left turns v for crossing intersection (see next page) Cross-correlated with v Vehicle type / size v Driver age (macroscopic level, limited basis initially) v Driver gender (limited basis initially) v Weather effects (R/WIS 0.9 Mile away), with in-road sensors (collecting data already)

Information Available from Intersection (cont’d) u Maneuvers executed by drivers from minor road v Left turn in one stage or two? Variation in left and right gaps accepted for each maneuver type Cross-correlation with vehicle type v Crossing intersection in one stage or two? Variation in left and right gaps accepted for each maneuver type Cross-correlation with vehicle type

Information Available from Intersection (cont’d) u Response of mainline traffic v Speed adjustment if stationary vehicle on minor road Do mainline drivers adjust speed if a vehicle is spotted on minor road? Will mainline drivers move to left lane (when possible) to provide a lane for the minor road traffic? v Reaction of drivers on major road if too small gap is accepted Braking? Lane change? Other?

Design Detail: Main Controller Cabinet

Design Detail: Intersection Cabling

Intersection Build Details u Hardware v Cameras, radar, lasers, camera masts, radar stations, etc., ordered or out on bid. v iDAQ (intersection Data AcQuisition) computers built u Software v Camera based vehicle tracking software under continued development (20 FPS vs. existing 5 FPS for improved tracking and robustness) v Wireless system integrity software scaled from Demo 2003 version

Intersection Build Details u Construction v Bid to purchasing 12 March 2004 v UMN VP signature expected 16 March 2004 v Bids due back 2 weeks after bid is published. v 04 June 2004 end date specified v Cold cold winter, need to avoid frozen ground trenching costs.

MUTCD Approval Process u Howard Preston contract, phase II executed. u Task Highlights which follow Mn/MUTCD Section 1A.10 v Documentation of the design process, from crash analysis to simulator study results v Patent search v Development of acceptable research plan for the ensuing FOT Data collection MOE’s v Semi-annual progress reports to FHWA Office of Transportation Operations

Benefit Cost Analysis: Concept

Benefit Cost Analysis: Framework NPV: Net Present Value

Benefit Cost Analysis: Status u Work complete/in progress v Subtask C1: Identify relevant technologies, Review of Literature. v Subtask C2: Develop Benefit Cost Framework. v Subtask C3: Estimate Lifespan of Technology. v Subtask C4: Estimate Costs of technology. v Subtask C5: Estimate Benefits of Countermeasures.  Subtask C6: Lifecycle Analysis. u Work yet to be undertaken v Subtask C7: Recommend Countermeasures. v Subtask C8: Analyze Inter- technology Effects. v Subtask C9: Determine Performance Metrics. v Subtask C10: Develop cost:performance models. v Subtask 11: Analyze Synergies.  Subtask 12: Optimize Counter-measure Combination.

Schedule Adherence TODAY Intersection Brought On-line Human Factors Simulator DII Testing Begins Final Report Preparation Begins