Quality Assurance Improvement Plan and Software Quality Assurance Implementation Plan February 23, 2004 Defense Nuclear Facilities Safety Board Frank Russo.

Slides:



Advertisements
Similar presentations
Quality Assurance Update Presented byRay Hardwick Presented by: Ray Hardwick.
Advertisements

Department of Energy Quality Assurance Updates Frank Russo Deputy Assistant Secretary Office of Corporate Performance Assessment Energy & Environmental.
The DMCC Perspective on the Application to Meteorological Software of DOE’s SQA Requirements Prepared by: Cliff Glantz (PNNL) Carl Mazzola (Shaw Env.)
ANSI/ASQ E Overview Gary L. Johnson U.S. EPA
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
More CMM Part Two : Details.
Albert Coons April 21, 2009 Emergency Preparedness and New Reactor Licensing Process: An Update on Where We Are Now Federal Emergency Management Agency.
U.S. Department of the Interior U.S. Geological Survey USGS Digital Aerial Mapping Camera Status CRSS/ASPRS Specialty Conference October 2007 USGS Remote.
Human Resources Office of 1 Job Classification System Redesign Information Session Health Care and Animal Care October 28, 2014.
Human Resources Office of 1 Job Classification System Redesign Information Session Student Services July 2014 Sheila Reger, HR Consulting Manager Matt.
TRAINING AND DRILLS. Training and Drills Ensure A comprehensive, coordinated, and documented program as an integral part of the emergency management program.
Departmental Initiative to Enhance Activity-level Work Planning and Control DOE and DOE Contractors Industrial Hygiene Meeting in Conjunction with the.
RC14001 ® Update GPCA Responsible Care Committee September 23, 2013.
Software Engineering Institute Capability Maturity Model (CMM)
CD NS Chief, Defense Nuclear Safety FIRE PROTECTON FUNCTIONAL AREA CDNS BIENNIAL REVIEWS May 15, 2012 Carl Sykes.
Thank you for joining! The meeting will start shortly. If you have not yet joined by phone, please call the number shown on the screen to the right. Dial.
Software Quality Assurance Implementation Plan June 15, 2004 Defense Nuclear Facilities Safety Board Chip Lagdon Director Office of Quality Assurance Programs.
Configuration Management, Logistics, and Universal CM Issues Larry Bauer Boeing Commercial Airplanes NDIA Conference Miami March 4-5, 2005
Office of Nuclear Safety and Operations (NA-17) Defense Programs QUALITY ASSURANCE Status Briefing August, 25, 2009 Defense Programs QUALITY ASSURANCE.
Implementation of DOE Order 450.1: Self-Declaration and Report Letters Steven R. Woodbury US Department of Energy March 9, 2005.
Financials – Phase II Kick-Off Meeting September 11, 2008 Brenda Bolander, State Comptroller Michael Grisser, Project Manager.
1 DOE O 414.1C, Quality Assurance “Improving Safety Software Quality” Frank Russo Deputy Assistant Secretary Corporate Performance Assessment (EH-3)
Work Planning & Control for “All” Activity Level Work Tim Flake Maintenance Advisor Washington Savannah River Company ISMS Work Shop November 28, 2007.
Safety Analysis Working Group FY2010 EFCOG Semi-Annual Meeting Brad Evans, Chair Pacific Northwest National Laboratory Rob McKeehan, Vice-Chair Oak Ridge.
FY2010 PEMP Notable Outcomes October 15, FRA, LLC Board of Directors 10/15-16/2009 Office of Quality and Best Practices Performance Evaluation Management.
Roles and Responsibilities
Basics of OHSAS Occupational Health & Safety Management System
Unit 5:Elements of A Viable COOP Capability (cont.)  Define and explain the terms tests, training, and exercises (TT&E)  Explain the importance of a.
Nov Readiness Review Course Implementation Plan - Mod 8 Screening or Scoping Meeting (ORR vs RA, Authorization Authority (AA) Defined, Startup Notification.
Software Quality Assurance Activities
Adoption of Commercial EDI Standards for DoD Logistics Business Transactions Integrated Product Team (EDI IPT) – Expanded DEFENSE LOGISTICS AGENCY Report.
RMS Update to TAC May 8, RMS Update to TAC ► At April 9 RMS Meeting:  Antitrust Training  RMS Voting Items: ► NPRR097Changes to Section 8 to Incorporate.
GSA Expo 2010 DoD Travel Programs Customer Assistance Tools and Services Mr. Joe Ward and Ms. Margaret Hebert GSA Expo May 2010.
1. Housekeeping Items June 8 th and 9 th put on calendar for 2 nd round of Iowa Core ***Shenandoah participants*** Module 6 training on March 24 th will.
New DOE Software Quality Assurance Requirements: Implications for Meteorological Software Cliff Glantz Pacific Northwest National Laboratory
Quality Assurance Policy in DOE Debbie Rosano Director, Office of Quality Assurance (AU-33) September 14, 2015 Presented to: 2015 Analytical Services Program.
DOE Order 413.3A Program and Project Management for the Acquisition of Capital Assets Catherine Santana Deputy Director, Project Management Systems, OECM.
DOE Integrated Safety Management (ISM) Conference Knoxville, TN August 24-27, 2009 Colette Broussard, DOE-HQ Office of Quality Assurance Policy.
Presented by: Rick Kendall, NA-17 Integrated Safety Management Best Practices Workshop September 2006; Denver Co. Assessment Criteria and Guidelines for.
Integration of Safety into the Design Process Overview of DOE-STD-1189 Richard Black, Director Office of Nuclear & Facility Safety Policy.
Integrating EM QA Performance Metrics with Performance Analysis Processes August 26, 2009 Robert Hinds, Manager, Quality Assurance Engineering & Greg Peterson,
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Defense Nuclear Facilities Safety Board September 26, 2005 Frank Russo Office of Corporate Performance Assessment Robert Loesch Office of Quality Assurance.
Quality Assurance Update for the EFCOG ISM & QA Working Group 2011 Spring Meeting Sonya Barnette Office of Quality Assurance Policy and Assistance Office.
Reusable Launch Vehicle Working Group Commercial Space Transportation Advisory Committee Presented to COMSTAC Meeting George Whitesides, RLVWG Chairman.
DEFENSE LOGISTICS AGENCY SELF- DECLARATION PROCESS VALIDATING THE EMS: James Wood, P.E., EMS-LA Linda Baetz, EMS-LA US Army Center for Health Promotion.
State of Georgia Release Management Training
PRESENTED TO: ENERGY FACILITY CONTRACTORS GROUP SAFETY ANALYSIS WORKING GROUP SAFETY ANALYSIS WORKSHOP BY: CHRIS CHAVES NSR&D PROGRAM OFFICE OF NUCLEAR.
Mitigation & Education (MES) Subcommittee Update Chris Jonientz-Trisler, FEMA Co-Chair.
0 Software Quality Assurance Implementation Plan Briefing to the Board June 20, 2003.
Qualification & Training of Work Planners Steven K. Little Work Control Department Manager.
1 Quality Assurance Software Quality Assurance Implementation Plans October 16, 2003 Defense Nuclear Facilities Safety Board Beverly Cook Assistant Secretary.
Quality Assurance Briefing Defense Nuclear Facilities Safety Board June 1, 2005 Frank Russo Office of Corporate Performance Assessment Robert Loesch Office.
Data Coordinating Center University of Washington Department of Biostatistics Elizabeth Brown, ScD Siiri Bennett, MD.
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
EFCOG Safety Working Group (SWG) Status June 7, 2016 EFCOG Working Group Coordination Meeting Washington, DC John McDonald, SWG Chair.
Status Report to the President under EO EPA ACTIONS 1 Executive Order: Improving Chemical Facility Safety & Security.
Planning for Succession
Standard Design Process (SDP) Interfacing Procedures Ashley Taylor TVA
Roles and Responsibilities
Software Project Configuration Management
NIEP Evaluation PO&A “How-to” Guide and Issue Classification
Software and Systems Integration
DOE Nuclear Safety Research and Development Program
Enterprise Content Management Owners Representative Contract Approval
Alabama Teacher Mentoring Program
NRC Cyber Security Regulatory Overview
Moving Forward From Fukushima Near-Term Task Force EP Recommendations
Executive Project Kickoff
Presentation transcript:

Quality Assurance Improvement Plan and Software Quality Assurance Implementation Plan February 23, 2004 Defense Nuclear Facilities Safety Board Frank Russo Deputy Assistant Secretary For Corporate Performance Assessment

2 Accomplishments Quality Assurance Improvement Plan EM: 12 of 16 commitments completed NNSA: 7 of 8 commitments completed SQA Implementation Plan EH: 14 of 26 commitments completed

3 QA Program Improvements Established DOE Office of QA Programs Established EFCOG QA Group – tasks in development Quality Workshop conducted December 2003 QA Directive revisions in progress

4 QA Directive Status QA Order 414.1B nearing issuance – awaiting Secretarial Office concurrences Suspect/Counterfeit Items Guide draft ready for February release QA Guide A revision initiated with target release date April 2004

Software Quality Assurance Implementation Plan February 23, 2004 Defense Nuclear Facilities Safety Board Chip Lagdon Director Office of Quality Assurance Programs

6 Overview Recent Accomplishments Toolbox Code Status Design Code Survey Assessment Schedules SQA Knowledge Portal SQA Directives Status Summary and Path Forward

IP Accomplishments CommitmentDescriptionResponsibilityStatus Define SQA roles and responsibility EHCompleted Develop SQA qualification standards for Federal personnel Federal Technical Capability Panel Completed Identify Federal SQA positions EM, NNSACompleted Qualify Federal personnel EM, NNSA Open (9/04) Revise Functions, Responsibilities and Authorities Manual (FRAM) EHCompleted Revise FRA documents EM, NNSA Open (4/04)

IP Accomplishments (Cont.) CommitmentDescriptionResponsibilityStatus Identify safety analysis codes for “toolbox” EHCompleted Establish SQA criteria for toolbox codes EHCompleted Perform SQA gap analyses on toolbox codes EH Initial Report Completed Develop safety analysis code guidance reports EHCompleted Perform design code survey EH Initial Report Completed

IP Accomplishments (Cont.) CommitmentDescriptionResponsibilityStatus Establish Central Registry for toolbox codes EHCompleted Develop SQA Criteria and Approach Document (CRAD) EHCompleted Establish site assessment schedule EM, NNSACompleted Conduct site assessments EM, NNSA Open (per schedule) Review industry or Federal SQA standards EHCompleted Establish schedule on SQA Directives EHCompleted

IP Accomplishments (Cont.) CommitmentDescriptionResponsibilityStatus Issue SQA Directives EH Open (12/04) Review SQA Directives NA, NNSA, etc. Open (per issuance) Establish corporate SQA function within EH EH Open (3/04) Identify methods for capturing SQA lessons learned EHCompleted Establish relationship with outside SQA organizations EHCompleted Conduct periodic briefings to DNFSB EHOngoing

11 Overview of Code Commitments Mar 03Sep 03Jan 04Sep 03Dec 03 Implementation Plan (IP) Commitments IP Deliverables Status Identify Safety Analysis Codes Establish SQA Criteria Perform Gap Analysis of Each Code Develop Guidance Report for Each Code Survey Design Codes Safety Analysis Survey Report SQA Plan and Criteria Report Gap Analysis Reports Code Guidance Reports Design Code Survey Report Ongoing Review CENTRAL REGISTRY [ COMPLETE

12 Issued interim gap analysis reports for ALOHA, MACCS2, EPIcode, MELCOR, CFAST and GENII toolbox codes Reports Available: No evidence of software-induced errors in the codes that would have led to non- conservatisms at defense nuclear facilities SQA improvements identified for safety analysis software Gap Analysis of Six Toolbox Codes

13 Toolbox Code Gap Analysis Summary Criteria MACCS2ALOHAEPIcodeMELCOR GENII GENII 2.0 CFAST Software Classification Yes Procedures/Plan Part/No YesPart/No Requirements Part/No YesPart/No Design Part/No YesPart/No Implementation Part/No Yes Part/No Testing Part/No YesPart/No Instructions Part/No YesPart/No Accept Test Yes Part/No Config. Cont. Part/No Yes Part/No Error Impact Part/No Yes Resources (FTE) 2.0 yr1.25 yr 2.0 yr1.0 yrN/A0.5 yr

14 Conducted a survey of design codes currently in use to determine if any should be included as part of the toolbox Survey period from September to December organizations at 13 DOE sites responded Issued Initial Report in December 2003 Design Code Survey

15 Multiple-Use Design Software Characteristics Proprietary Extensive Worldwide User Groups Website Well-Supported in Many Cases Various methods on SQA - 10 CFR 50 Appendix B - NQA-1 - ISO 9000/9001

16 Software Assessment Schedules SiteDateSite Team LeadEH Rep Y-121/20-23/04Sherry HardgravePranab Guha ORP2/16-20/04Dave BrownSubir Sen LANL2/9-13/04Chris MurnanePranab Guha SRS – NNSA2/16-20/04Gregg NelsonChip Lagdon SRS – EM2/16-20/04Bill RolandChip Lagdon Pantex3/22-26/04Al MacDougallDebra Sparkman SNL3/16-19/04Mark HamiltonSubir Sen IDApril or JuneBob BlythPranab Guha NTS4/26-30/04Tim HendersonTBD RLMarchShiv SethSubir Sen LLNLTBD. No later then 8/15/04 Adeliza CordisTBD

17 SQA Knowledge Portal Incorporates functions of Central Registry and SQA list server Repository for SQA knowledge Toolbox Code information, Reports and Standards, Training Courses, Procedures Collaboration space for SQA Community SQA SME locator SQA Discussion Forum

18

19 SQA Directives Status Software Categorization Grading Work Paper Developed First SME Panel Review Complete Additions to software type/approach table Definitions clarified for software types and their application Concern grading definitions go beyond SQA IP scope

20 SQA Directives Status Order and Guide Development March – Sept 04 SME Input throughout DOE O 414.1C on REVCOM – Sept 04 Consider extending DOE N until DOE O 414.1C is issued DOE O 414.1B contains SQA responsibilities, clarify safety system software w/in scope

IP Commitment Summary and Path Forward Developed SQA Knowledge Portal with Central Registry Finalize safety analysis code guidance and gap analysis reports by April 2004 and develop path forward Issue SQA directives by end of 2004 Participate in NNSA and EM SQA site assessments Partner with NNSA and EM to complete site assessments NNSA and EM to update FRA documents Host SQA training May 2004 Partner with NNSA and EM in monitoring of cross- cutting SQA issues

Possible Backup Slides May also be incorporated into speakers notes

23 SQA Evaluation Process 1. Review Documentation: Software Developer Reports Previous Evaluations Journal & Conference Documents Primary SQA Criteria Implementation Criteria 2. Process Information Template 3. Assess Software Quality Assurance Plan 4. Assess Software Engineering Documentation Software Requirements Document Software Design Document Test Case Description/Report Software Configuration and Control User’s Instructions Error Notification 4.a Assess Training & Identify Software Development Plans SQA Software Modifications 5. Document in Gap Analysis Report Compliant Areas Areas for Improvement Recommendations from DOE Users Estimate of Resources

24 MACCS2 Gap Analysis Two of ten code developer SQA areas satisfactory Recommend improvement in eight other areas Key areas of improvement Update model description and finalize University of New Mexico Verification document Add prototypic problems and error diagnostics to documentation Enhance user feedback and technical information exchange Version 1.13 to be released mid-2004 Fixes multiple plume segment and emergency preparedness models New version and guidance report address Tech-25 issues Fire plume phenomenology, code errors, end user QA problem (dose conversion factors), and documentation quality Conservative estimate to upgrade: 2 FTE-years

25 ALOHA Gap Analysis Software Classification and User Instructions SQA areas are satisfactory Recommend improvements in eight other SQA areas ALOHA areas of improvement (new version in progress) Correct IDLH Isopleth footprint Write-protect chemical library Release duration/distance Allow multiple receptors in one run Vapor pressure, pool and evaporation models, others Complete NOAA Theoretical Description Memorandum Conservative estimate to upgrade: ~16 FTE-months

26 EPIcode Gap Analysis Software Classification and User Instructions SQA areas are satisfactory Recommend improvements in eight other SQA areas EPIcode areas of improvement Add dense gas model capability Hourly input of meteorology Surface roughness adjustment Conservative estimate to upgrade: ~16 FTE-months

27 CFAST Gap Analysis Software Classification and Configuration Control SQA areas are satisfactory Recommend improvements in eight other SQA areas CFAST areas of improvement Provide comprehensive output description Include training requirements Document acceptance test for users Implement formal error notification and corrective action process Graphical User Interface for Version should be released Conservative estimate to upgrade: 0.5 FTE-year

28 MELCOR Gap Analysis Software Classification, Implementation, User Instructions, Acceptance Testing and Configuration Control SQA areas are satisfactory Recommend improvements in five other SQA areas MELCOR areas of improvement Include sample problems relevant to Leak Path Factor analysis Improve user control of output Conservative estimate to upgrade: FTE-years

29 GENII Gap Analysis Older Version (1.485) SQA satisfactory in nine of ten areas Exception in error impact Newer Version (2.0) SQA satisfactory in two of ten areas Recommend improvements in eight areas GENII Applicable to DSAs No longer in development by PNNL GENII 2.0 Still in Testing, Not Finalized => Not applicable to DSAs Conservative estimate to upgrade: ~10 FTE-months

30 Strategy for Design Software Different from safety analysis software Proprietary, commercially competitive Frequently updated Define value-added course of action Current protocol of development, verification, testing, and control measures is adequate Facilitate reporting and disposition errors and deficiencies Lessons learned among DOE users Software training Develop web-based information systems Arranged by design software category Re-survey as appropriate