Working with partners: Coordination of data collection activities.

Slides:



Advertisements
Similar presentations
Project Cycle Management
Advertisements

Multiple Indicator Cluster Surveys Regional Training Workshop I - Survey Design Objectives of the Workshop.
MICS4 Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop Objectives of the Workshop.
MICS4 Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop MICS4 Technical Assistance.
MICS4 Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop The MICS4 Process.
ENGENDERING POPULATION CENSUSES IN MALAWI Prepared by: Mylen Mahobe National Statistical Office (Malawi)
SteeringCoordinating Data / Research Logistics Community Engagement Community Health Planning Committee Structure Austin / Travis County CHA CHIP.
Quality assurance Kari Kuulasmaa 1 st EHES Training Seminar, February 2010, Rome.
Planning and preparing the national HES EHES Training seminar, Rome 11 February 2010 Päivikki Koponen.
Survey expenses and budget allocation Ed Rege ILRI 26 February 2003.
Multiple Indicator Cluster Surveys Survey Design Workshop MICS Technical Assistance MICS Survey Design Workshop.
Group 3 A: Capacity Building - Operational (Technical) Support What capacity is needed to ensure an effective operational response to a humanitarian emergency?
1 Fieldwork logistics and data quality control procedures Kathleen Beegle Workshop 17, Session 2 Designing and Implementing Household Surveys March 31,
Evaluation EnAct Campuses Sonoma, Humboldt, Chico, San Francisco, San Jose, Fresno, Bakersfield, Pomona Presentation July 11, 2007 Public Works, Inc. Mikala.
Overview of the M&E of PHN Program’s Regional Workshop.
Quality evaluation and improvement for Internal Audit
1a Job Descriptions for Personnel Involved in PAT Implementation Materials Developed by The IRIS Center, University of Maryland.
MICS Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop Overview of MICS Tools, Templates, Resources, Technical Assistance.
Cash Based Interventions in unhcr
SAMPLE IMPLEMENTATION PLAN OF A POVERTY ASSESSMENT TOOL To Report to the Management of Microfinance Association of Patharland (MAP), Patharland This proposal.
The Process of Conducting a Post Disaster Needs Assessment (PDNA) United Nations Development Programme Bureau for Crisis Prevention and Recovery Bangkok,
WHAT IS “CLASS”? A BRIEF ORIENTATION TO THE CLASS METHODOLOGY.
The Vision Implementation Project
ISTEP: Technology Field Research in Developing Communities Instructor: M. Bernardine Dias CAs: Sarah Belousov and Ermine Teves Spring 2009.
1 MBA PROJECT Nasir Afghan/Asad Ilyas. 2 Objective To enable MBA students to execute a client focused challenging assignment and to enhance.
Slide 1 of 19 Lessons from the Foundation Learning provision for the new 16 to 19 Study Programmes Discussion materials Issue 1: Attendance, retention,
SIMA COORDINATED ASSESSMENT JOINT HUMANITARIAN ASSESSMENT (JHA)
STAMPPP Project University of Ulster Queen’s University, Belfast University of Applied Sciences,Munster University of Oviedo University of Akershus PEAT.
Directing Geographically Disparate Clerkship Sites Alan P. Ladd, MD Associate Professor of Surgery Indiana University School of Medicine.
MICS Data Processing Workshop Multiple Indicator Cluster Surveys Data Processing Workshop Overview of MICS Tools, Templates, Resources, Technical Assistance.
Technology Use Plan Bighorn County School District #4 Basin / Manderson, Wyoming “Life-long learning through attitude, academics, and accountability.”
© Copyright Wadhwani Foundation Principal Orientation.
1 Department of Medical Assistance Services Stakeholder Advisory Committee June 25, 2014 Gerald A. Craver, PhD
Presentation Content 2005/2006 Poverty Analysis Country Poverty Alleviation Strategy Koudemain Ste Lucie Programme - Brief Description -
Copyright 2010, The World Bank Group. All Rights Reserved. Part 2 Labor Market Information Produced in Collaboration between World Bank Institute and the.
February 17, 1999Open Forum on Metadata Registries 1 Census Corporate Statistical Metadata Registry By Martin V. Appel Daniel W. Gillman Samuel N. Highsmith,
Dr. Mojca Noč Razinger SURS Data collection in the Statistical Office of the Republic of Slovenia (SURS)
AADAPT Workshop South Asia Goa, December 17-21, 2009 Maria Isabel Beltran 1.
The TNA STEP model Target Groups Job requirements Existing
The MEMOBUST project Ágnes Andics EESW Nürnberg 1.
The Douala Action Plan – A preliminary assessment Regional project implementation workshop in Western and Central Africa Accra, Ghana December 1-4, 2009.
Quality control and audit visit: process & actions.
MICS Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop Data Entry Using Tablets / Laptops.
Implementation of the European Statistics Code of Practice Yalta September 2009 Pieter Everaers, Eurostat.
Copyright 2010, The World Bank Group. All Rights Reserved. Managing Data Processing Section B.
Illinois Department of Children & Family Service/Chicago State University STEP Program - NHSTES May THE STEP PROGRAM Supervisory Training to Enhance.
How to Plan for the Implementation of the Toolkit CEI Implementing the Reproductive Health Assessment Toolkit for Conflict-Affected Women November.
IASC Task Team on Accountability to Affected Populations and Protection from sexual Exploitation and Abuse (AAP/PSEA) TASK Team Meeting 4th th of June.
MICS Data Processing Workshop Multiple Indicator Cluster Surveys Data Processing Workshop Overview of the MICS Process.
Tax Administration Diagnostic Assessment Too l PREPARING FOR A TADAT ASSESSMENT.
 Successful surveillance includes appropriate partnerships, sampling, IRB authorizations and an effective system for documentation.  Once a surveillance.
Eurostat 1 3.An overview of the SDMX implementation process Edward Cook Eurostat Unit B5: “Central data and metadata services” SDMX Basics course,
ACTED AME Appraisal, Monitoring and Evaluation. Summary 1/ ACTED AME department 2/ AME Responsibilities 3/ AME throughout project cycle 4/ Involvement.
CAREM WP3: Quality and Evaluation Plan WP Leader: Universal Learning Systems Timeframe: 2012 – 2014 Third Project meeting Herford, Germany 6 – 7 March.
DevInfo in Egypt DevInfo 5.0 Regional Training September 2006 DevInfo in Egypt Current Status & Way Forward.
SADC REGIONAL WORKSHOP ON TRADE IN SERVICES STATISTICS FEB 2016 JNB/SA International Trade in Services UNCTAD-UEMOA project Viviane MWITIREHE In.
Bangladesh Joint Country Assistance Evaluation: Assessing Total ODA at the Country Level Presentation to OECD DAC November 2006 Bruce Murray Director General.
I. Presentation Susana Moreno Romero Food Security Expert - WFP Lebanon CO
Student Learning Outcomes Assessment Montgomery College Fall 2011 Orientation.
EVALUATION OF SCHOOL LEADERSHIP AND TEACHING PRACTICE BASQUE COUNTRY INSPECTORATE OF EDUCATION. DEPARTMENT OF EDUCATION, LINGÜISTIC POLICY AND CULTURE.
National Population Commission (NPopC)
30TH May 2017 Dar-es-Salaam, Tanzania
Overview of the PAT Implementation Process Materials Developed by The IRIS Center at the University of Maryland.
Syria Regional Response Plan - Governance
Data collection.
Directing Geographically Disparate Clerkship Sites
Data collection.
IRAQ Assessment Working Group: Challenges, Priorities and Capacity
Checklist for joint engagement - DTM and Partners
Student Learning Outcomes Assessment
Presentation transcript:

Working with partners: Coordination of data collection activities

Three phases ConceptionImplementation Data management and analysis Reporting dissemination

Conception UNHCR - leadership –ToRs of the study/Concept note –Convening partners/stakeholders –Agreement on the scope (geographic, content) –Questionnaire design –Sensitization –Agreement with government of the survey –Training IP on protection –Training of surveyors –Data analysis plan IP Partners –Methodological design –Recruitment and training of surveyors –Sample selection

Implementation UNHCR –Follow up activities –Ensuring consistency with ToRs –Field visits I. Partners –Dissemination of teams and questionnaires –Daily supervision of field work –Sample replacement activities –On-going coding and data entry of questionnaires –Quality control

Data management and analysis UNHCR –Ensuring consistency with data analysis plan –Feedback on the preliminary analysis –Ensuring that the report is protection- oriented I. Partner –Data quality assessment –Data analysis based on the analysis plan –Reporting –Incorporating feedback

Reporting and dissemination UNHCR & Partner Dissemination (UNHCR & Partner) Restitution (UNHCR & Partners) Uses for planning and decision making (UNHCR)