All Exp Mtg Apr 21, 2008 NuMI-MINOS Status Report – Alec Habig FAR DETECTOR: 99.7% live time (wall clock) 99.9% (pot weighted) Annual hoist inspection.

Slides:



Advertisements
Similar presentations
Status of Soudan: After the Fire Dan Bauer, All Experimenter’s Meeting, April 4, 2011.
Advertisements

ELECTRICTY 2 NOTES Resistance / (Series and Parallel Circuits)
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
What can Superbeams and Neutrino Factories Add to Scattering Measurements?
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
Pierrick Hanlet MICO June 6, 2011 MICE Operations Manager Report.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 20, 2011.
Measuring Time.
© Philadelphia Scientific 2004 A Case Study: Four Years of Performance Data at a Canadian Rehydration and Catalyst Addition Site Harold A. Vanasse – Philadelphia.
NuMI DOE Review May 25, 2004 Commissioning Page 1 NuMI Commissioning Overview CD-4 Goals Planning Pre-commissioning activities Commissioning Summary.
F All Experimenters' Mtg - 9 Jun 03 Week in Review: 06/02/03 –06/09/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Fermilab 1 AP Dept. Activities Report September 20, 2006Dixon Bogert AP Dept. - Activities Report Dixon Bogert - AP Dept. Meeting September 20 th, 2006.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Proton Plans at Fermilab Robert Zwaska - Fermilab Science and Engineering at Henderson- DUSEL Capstone Workshop Stony Brook University May 5, 2006 Outline.
Ff f f f “Conventional” neutrino beams: Target requirements Phil Adamson 13 th January 2012.
Shutdown 2012 ES&H Friday April 27, 2012J. Anderson Jr. Page 1 Draft Schedule Beam off to Experiments 0000 Monday April 30 th Linac continues operations.
All Exp Mtg April NuMI-MINOS Status Report – Bob Zwaska 78.7e17 protons for the week  Best week on record  Best day on Tuesday – 12.23e17 Decent.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013.
Dmitri Denisov D0 Weekly Summary: August 18 to August 24  Delivered Luminosity and operating efficiency u Delivered 6.9pb -1 u Recorded 6.0pb -1 (87%)
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep 26, 2011.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar
MINERvA Main INjector ExpeRiment for -A is the symbol for the neutrino. The beam that is sent to MINERvA is made out of neutrinos. In chemistry, an A stands.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 17, 2011.
NuMI/MINOS Status All Exp. Mtg. June 2, 2008 Jim Hylen/FNAL Page 1 FAR DETECTOR: 98.0% live time (wall clock) There was a power outage on the morning of.
Overlap of Project X and Beamline to DUSEL June 2, 2008.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May review Near Detector Electronics production.
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
All Exp Mtg July 7, 2008 NuMI-MINOS Status Report – Laura Loiacono FAR DETECTOR: FD live time was 95.7% for cosmics last week (ROP7 problems reported at.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
PIP Status Report Linac Startup plans 12/05/2012.
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
All Experimenters’ Meeting September 23, Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB.
F All Experimenters' Mtg - 24 Feb 03 Week in Review: 02/17/03 –02/23/03 Ron Moore – FNAL Store Summary Failed Tev dipole disassembly Schedule for Week.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
CELLS IN SERIES AND PARALLEL Lesson 9. Cells in Series  The electric potential given to a single electron by a dry cell has an average voltage of around.
NUMI MINOS MINOS Far Detector Installation & Commissioning Jeff Nelson MNHEP DoE Visit September, 2002.
Proton Source July 21, 2006 E Prebys 1 Proton Plan Meeting Agenda:  Review of parameter list: Prebys, Kourbanis  Status of writing assignments Prebys,
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
NuMI Detector NIM Paper Draft MINOS Detectors NIM Paper Status and Job List for this Meeting Dave Ayres & Alec Habig Argonne & Minnesota – Duluth MINOS.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
Friday July 16, 2010 John Anderson Page 1 Shutdown 2010 ES&H Enclosure Access  Linac Remains on enclosure interlock key series. RWP’s in.
All Exp Mtg May 5, 2008 NuMI-MINOS Status Report – Tingjun Yang FAR DETECTOR: 99.7% live time (wall clock) Everything was running pretty smooth NEAR DETECTOR:
RHIC Status Haixin Huang RSC Meeting 02/18/2011. l Fixed the blue dump kicker noise problem last Friday. l Declared physics last Friday. l Smooth run.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jan 25, 2016.
TD/MSD/M&A Group Meeting 4/14/2016. Some FNAL news The new TD web site, was mentioned as being on-line as a prototype for the WordPress.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 24, 2014.
HB2008 – WG F: 27 Aug. S. Childress – Diagnostics_2MW 1 NuMI Beam Diagnostics and Control Steps to 2 MW S. Childress Fermilab.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 8, 2016.
Neutrino Beam and Detector Operations Bob Zwaska DOE S&T Review of Scientific User Facilities June 30 – July 2, 2009.
1 Sam Childress. 2 S. Childress NNN11 Existing Fermilab Neutrino Beams 120 GeV NuMI 8 GeV BNB 2 J. Strait.
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
News and brief overview of Beamline plans for the next few months
Opportunity for Near Detector Test at NUMI
Philadelphia Scientific
TAG Agenda – April 6th 2006 Minutes from last TAG meeting – 13.45
Presentation transcript:

All Exp Mtg Apr 21, 2008 NuMI-MINOS Status Report – Alec Habig FAR DETECTOR: 99.7% live time (wall clock) 99.9% (pot weighted) Annual hoist inspection and maintenance closed lab on Friday Experiments cooperated by staying up NEAR DETECTOR: Up 93% of the time (pot weighted) Some electronics maintenance Re-commissioning detector after power outage on Wednesday was the big uptime sink (Next slide)

All Exp Mtg Apr 21, 2008 NuMI-MINOS Status Report – Alec Habig POWER OUTAGE? Minerva & Argoneut had planned electrical work to add service for the new experiments on Wednesday day shift In the works for a while, exact date set on Tuesday morning Experiments coordinated successfully, but AD operations not properly notified So MCR unexpectedly lost communications to NuMI controls: MCR log, 07:44: “Looks like we lost a crate in the NuMI FE crate $E8.” MINOS Hall crate Absorber Hall crate

All Exp Mtg Apr 21, 2008 NuMI-MINOS Status Report – Alec Habig The Technical Problem But why should detector power affect the neutrino beam? Controls fiber to absorber hall passes in series through the MINOS LCW/coil control crate, doubles back to absorber Transports beam permit When power to utility breaker panel dropped by electricians to tie in Minerva service, the beam permit was lost Lessons Learned and Mitigation Better communications needed for planning Control crates and their breakers now labelled Meetings have occurred, PPD leadership involved ~6.5h of Far Detector NuMI beam lost

All Exp Mtg Apr 21, 2008 NuMI-MINOS Status Report – Alec Habig Protons/pulse:  ~19x10 12 : turns mixed  ~23x10 12 : turns mixed  ~27x10 12 : turns mixed  ~33x10 12 : NuMI only o (More than usual this week due to large pbar stacks)  All a few % higher pot-per-turn than before the MP02 troubles! o All that tuning is working Best week 2.59 E13 NuMI-only 7 6 5

All Exp Mtg Apr 21, 2008 NuMI-MINOS Status Report – Alec Habig ~165kW with 5 turns, ~195kW with 6 turns, ~230kW with 7 turns, ~270kW in NuMI only 6.5 hours lost on Wed. due to power outage But still a pretty good week (2 nd best since shutdown) Best week 214 kW 5.74E18 Best week 6E18 pot Post-MP02 tuning MINOS-hall power outage Best days since shutdown over weekend

All Exp Mtg Apr 21, 2008 NuMI-MINOS Status Report – Alec Habig end of 2007 shutdown Protons per day (E17) Weekly Avg. needed to meet 2E20 pot by 30 September (no shutdown!) Same, but with 4-weeks float 7-day running average

All Exp Mtg Apr 21, 2008 NuMI-MINOS Status Report – Alec Habig end of 2007 shutdown E 20 total POT to NuMI