Our Trail Journey So Far and The Adventure Ahead.

Slides:



Advertisements
Similar presentations
Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
Advertisements

Griffith Park Fire Draft Recovery Plan May 30, 2007 Mayor Antonio R. Villaraigosa Councilman Tom LaBonge, CD 4 General Manager Jon Kirk Mukri City of Los.
4 Process Mapped and documented current conditions and trail use patterns Community outreach Seven initial public meetings were held at locations.
San Antonio, Bexar County, Texas Hays Street Bridge.
The Virginia Capital Trail
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Titusville to Edgewater Bike Loop PD&E Study
Shared Road Markings “Sharrows” For Bicycles Max Starcke Park Connection to the Future TxDOT Hike and Bike Trail.
…part of the Perry County Greenway. Cannelton- Quality of Place in Southern, IN Charming historic, small town located in Perry County along the southern.
Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5 The Slow Uphill Climb Matt Bullock, P.E. Chief District Engineer.
Sulphur River Regional Mobility Authority (SuRRMA) E. Delbert Horton, Ph.D., P.E. Chairman.
Presents. Tough Times For Transportation Funding Declining gas tax revenues Declining state revenues Uncertain federal revenue + Increasing construction.
Capital Improvement Program City of Warren, Ohio April 2012.
Vermont Association of Snow Travelers Lamoille Valley Rail Trail Site Visits: Tuesday, 12 and 19 November November-8 AM- Tegu Building, Morrisville.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
SUISUN CITY Suisun City Planned Development Area Connectivity for a Better Community.
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
Lake Park North Lion Bridge Rehabilitation Milwaukee, Wisconsin Darrell Berry, PE, SE Approaches to Historic Bridge Rehabilitation Case Study #2 1.
Kansas Department of Transportation Becky Pepper Bicycle and Pedestrian Coordinator Kansas Department of Transportation Contact:
Leadership Summit Cheiko High, Deputy Commissioner, CDOT.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
Approaches to Historic Bridge Rehabilitation Case Study #4
Monroe County Transportation Projects 4 Local Agencies: Unincorporated Monroe County City of Key West City of Marathon Village of Islamorada District Six.
State Road Agency of Ukraine CO-OPERATION WITH THE INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT.
Current Construction Projects Major Projects Pinellas County.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
Tom Norton, Executive Director Colorado Department of Transportation American Association of State Highway and Transportation Officials September 9, 2003.
Washington Thoroughfare Study Proposed Improvement of Washington Street Hainesville Road to Lake Street Lake County Hainesville Road Lake Street Washington.
Central Corridor LRT Review of Washington and Northern Alignments Jan Lysen and John Siqveland December 10, 2009 Image: MPR News Q.
Regional Transportation Committee (RTC) 10-Year Project Milestone Policy Transportation and Trinity River Project Committee October 26, 2015.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
BLACKWATER HERITAGE STATE TRAIL By Vernon Compton November 13, 2015 Emerald Coast Transportation Symposium.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Metropolitan Council 1 Twin Cities Region Transportation Policy Plan Nacho Diaz Metropolitan Council Evaluating Economic and Community Impacts of Transit.
PROJECT OVERVIEW. 2 Green Line Extension Project 3 College Ave Ball Sq Lowell St Gilman Sq Lechmere Union Sq Washington St.
Urban Bicycle Networks Throughout Virginia I. Introduction This multimodal investment network is the incorporation of four urban bicycle studies and plans.
MED SR 18 Corridor Project MED PID October 13, 2015.
Twin Peaks – Mt. SutroTwin Peaks – Mt. Sutro Connector Trail Community MeetingConnector Trail Community Meeting February 2, 2016February 2, 2016.
Fitzgerald Marine Reserve CA Coastal Trail California Coastal Commission May 12, 2011.
Phoenix Grand Canalscape Kerry Wilcoxon, P.E., PTOE City of Phoenix Street Transportation Department 65 th Arizona Roads and Streets Conference March 24,
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
FUNDING AVAILABILITY & SAFETY PROGRAMS 3//21/2013.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
Track # Case Study Trail of the Coeur d'Alene Challenges.
Evergreen Highway Corridor Update Planning Commission Workshop March 22, 2016 Jennifer Campos, Senior Planner.
Reconstruction of Beach Drive Reconstruction of Beach Drive National Park Service U.S. Department of the Interior Rock Creek Park National Park Service.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
Arizona Forward Update
Bicycling in Minneapolis Bicycle Master Plan/Protected Bikeway Update
Connecting the City: Building the Dallas Trail Network
Jefferson County SA Red Rocks Site Approval
Griffith Park Fire Draft Recovery Plan May 30, 2007
Clinton Street Bridge over the Maumee River
Ellsworth Library Trail
Texas Department of Transportation
Transportation Alternatives (TA) Set-aside
PA Damage Assessment Exercise
Central Arkansas Transit Authority
FEASIBILITY AND COST PRESENTATION – 9/26/17
Central Arkansas Transit Authority
Paris & DALLAS DISTRICT corridor PROJECTs update
2019 Capital Program Title of Presentation
Monterey County Project Report for Measure X Expenditures
November Bond Election
National Organization of Minority Engineers Leadership Summit
Presentation transcript:

Our Trail Journey So Far and The Adventure Ahead

Our Journey So Far 17 of 130 Miles Developed with All-Weather Surface $6 Million Spent on Development from 2003 through 2015 Texas Parks & Wildlife Recreational Trail Grant – 9 Each Trail Supporters – Individuals, Businesses & Foundations Thousands of Volunteer Hours Local, N.E. Texas and DFW Area

Farmersville to Merit – 5.5 Miles Rail Bank Agency – City of Farmersville Collin County & Hunt County 5.5 Miles Developed - All-Weather Surface of Concrete, asphalt or decomposed granite $1.5 Million Spent on Development Texas Parks & Wildlife Recreational Trail Grant – 1 Each

Merit to Ladonia – 25 Miles Rail Bank Agency – Chaparral Rails to Trails Hunt County & Fannin County Also Passes Through Cities of Celeste and Wolfe City Much of Trail Accessible but No All-Weather Surface Trail Steward Group of 4 to 7 Clearing Non-Accessible Trail

Ladonia to Paris – 26 Miles Rail Bank Agency – Chaparral Rails to Trails Fannin County, Delta County and Lamar County Also Passes Through Cities of Pecan Gap, Ben Franklin and Roxton Much of Trail Accessible but No All-Weather Surface Trail Clearing Underway by Chaparral RTT – Most Recent Clearing – 9.5 Miles from Roxton to Paris North Sulphur River Bridge Collapsed - $3.1M Replacement Cost TxDOT – TAP Grant Appl. Submitted – Roxton to Paris Phase 1 Improvements

City of Paris – 7.5 Mile Trail de Paris Rail Bank Agency – City of Paris, Lamar County 3.5 Miles of Developed Asphalt All-Weather Surface 4 Bridges Replaced – Salvaged Truss, RR Flat Car & New Truss 4 Additional Miles Currently Under Development $4 Million Spent on Development of 7.5 Miles Texas Parks & Wildlife Recreational Trail Grants – 3 Each TxDOT – TAP Grant Appl. Submitted to Connect NETT to Downtown Paris

City of Reno – 3 Miles Rail Bank Agency – City of Reno, Lamar County 3 Mile Reno Rail Trail Fully Developed Asphalt All-Weather Surface Texas Parks & Wildlife Recreational Trail Grants – 1 Each

Prairiland Trail – 3.5 Miles Rail Bank Agency – Great Paris Development Foundation Lamar County between Reno and Blossom 3.5 Miles of Trail Developed Asphalt Millings/Aggregate/Oil All-Weather Surface Washed Out Bridge Replaced with Salvaged County Truss Bridge Texas Parks & Wildlife Recreational Trail Grants – 1 Each

City of Blossom – 1.5 Miles Rail Bank Agency – Great Paris Development Foundation Eastern Lamar County 1.5 Miles of Blossom Rail Trail Under Development All-Weather Asphalt Surface Installed by Year End Connects to City Park/Museum/Library Site Texas Parks & Wildlife Recreational Trail Grants – 1 Each

Blossom to Clarksville – 18.5 Miles Rail Bank Agency – Great Paris Development Foundation Lamar County & Red River County Passes Through Cities of Detroit and Bagwell 14.5 Miles in Red River County Cleared Through Trail Blazer Jump Start Program Donations from Individuals ($9K) 4 Miles Cleared in Lamar County by Local Contractor (Donation) Crosses US Hwy 82 – RR Bridge Removed - $900K Replacement Cost TxDOT – TAP Grant Application Submitted - Phase 1 Improvements

City of Clarksville – 2 Miles Rail Bank Agency – City of Clarksville, Red River County 1 Mile Fully Developed with Rock All-Weather Surface Railroad Bridge Rehabilitated with Concrete Deck Texas Parks & Wildlife Recreational Trail Grant – 1 Each

Clarksville to Avery – 15.5 Miles Rail Bank Agency – Clarksville, Annona and Avery Eastern Half of Red River County 7.5 Miles Cleared Through Trail Blazer Jump Start Program Donations from City of Clarksville ($3K) and Individuals ($6K) Annona and Avery Trail Sections Cleared by each City Seeking Funding From Lennox Foundation & Meadows Foundation

Avery to New Boston – 22 Miles Rail Bank Agency – City of Avery and Bowie County Red River County & Bowie County Passing Through DeKalb Avery VFD Constructed Hostel for Trail Users 1 Mile in New Boston Fully Developed-Asphalt All-Weather Surface 1.3 Miles Under Development Through Texas Parks & Wildlife Recreational Trail Grant 8.5 Miles TxDOT US Hwy 82 widening project from DeKalb to New Boston will be re-accessed upon completion due to affects of construction on RR corridor

The Adventure Ahead Full Development of 113 Miles of Trial Coordination in 7 Counties and 19 Cities Capitalize on Major Funding Sources

Trail Completion Scope Minor to moderate clearing of trees and brush Filling low areas where railroad ballast has been removed Repair railroad bridge decks and abutments Install handrails on all bridges Installing eight pedestrian bridges Replacing damaged drainage culverts Railroad rail & cross-tie removal Install base material and all weather surface Install signage along trail and at road crossings Install safety bollards and striping

Trail Completion Scope & Cost Tree and Brush Clearing = $840,000 Fill Material to Replace Ballast = $550,000 Bridge Deck & Abutment Repairs = $ 2,480,000 Bridge Handrail Installations = $ 2,080,000 Pedestrian Bridges (TxDOT R.O.W.) = $ 4,250,000 Pedestrian Bridges (Non-TxDOT R.O.W.) = $ 4,580,000 Drainage Culvert Replacements = $90,000 RR Rail & Cross-Tie Removal = $1,600,000 Base Material & All Weather Surface = $15,850,000 Signage, Safety Bollards & Striping = $680,000 TOTAL TRAIL COST ESTIMATE = $33,000,000

Current Trail Funding Sources TxDOT Transportation Alternatives Program Red River Co application = $472,109 Lamar Co – Prairiland Trail application = $145,200 Lamar Co – Chaparral Trail application = $405,836 City of Paris – Trail de Paris application = $867,662 Trail de Paris – SE 8 th Street to SW 4 th Street Texas Parks & Wildlife Dept. Grant = $200,000 Trail de Paris – West Trail Segment TxDOT - T.A.P. Grant = $605,398 Total Current & Potential Funds = $2,696,205 + Local

N.E.T.T. Future Funding Challenges Historically Funding: $6M / 12 Years = $0.5M / Yr Estimated Cost of Completion = $33M Time Line To Complete NETT: $33M / $0.5M / Yr

66 YEARS!!!

The Trail to Conquering Challenges Increased Support from Organizations / Entities that Support the Development of Recreational Trails Rails to Trails Conservancy Other Rails to Trails Advocacy Groups Texas Parks & Wildlife Department Texas Department of Transportation Increased Funding From Multiple Sources Foundations – Local, State & National Texas Parks & Wildlife Department Texas Department of Transportation

Questions???