Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades,

Slides:



Advertisements
Similar presentations
Construction Technologies. The study and application of building or assembling a structure. All people are affected in one way or another by construction.
Advertisements

Structural Steel Construction
Welcome. Company Pamminger Group HistoryKey-figuresProducts I LocationsPortfolio Production engineering Quality assurance References Orientation History.
Abcdabcd Low Rise Buildings The Built Environment in which we live is composed of:- Buildings Travel systems Services Disposal & Treatment Systems. The.
Portal Framed Construction
CALDSTEEL PRESENTATION. METALWORK INDUSTRIAL PROJECTS ASSEMBLY INDUSTRIAL.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District January 31, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District August 8, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Heritage Products, Inc..
 over 20 years of experience on the specialized market of relocation of the industrial facilities;  realization of the projects in many countries.
CEA UNIT 3 TERMS & DEFINITIONS. BEAM A structural member, usually horizontal, that carries a load that is applied transverse to its length.
IWTP Facility. Holes Drilled for Detailed Blast Drilling and Blasting for final grade prior to construction in 2011.
By.
 over 20 years of experience on the specialized market of relocation of the industrial facilities;  realization of the projects in many countries in.
Advantages of Lattice Towers
POLAIR One of the biggest manufacturers of professional cold equipment pcs./year pcs./year 2.5 millions.m 2 Cold rooms Refrigerated.
Reinforced Concrete VS Steel
C F MACHINERY Trade & Services – Import & Export Steel Welded Pipes and Shapes.
Case Study – St Clair Park Village, Auckland, NZ
Aakansha industries COMPANY PROFILE.
Company Profile Fivalco and Partners “The quality goes in before the name goes on” “The quality goes in before the name goes on”
FABRICATION OF BLOCKS OWNERS REQUIREMENT DESIGN CLASSIFICATION SOCIETY
M & M Machine Craft (An ISO/ TS Company) Company at Glance Incorporation in 1988 with a passion to start up new standards of Quality in the engineering.
18/08/20151 Rajshi Technologies India Pvt. Ltd. Complete Mould Solutions…………..& Beyond.
The Quality Source for Cold Finished Steel Bars. Founded in 1989 by leaders in the manufacturing industry Started in flats, due to customer demand, WPS.
Marinha Grande In Marinha Grande, 120 km north of Lisbon airport, there are more than 200 moldmakers in a 10 km radius and more than 180 other companies.
Customer Presentation West River Rd. South Elyria, OH 44035—Phone: Fax:
MESSER CUTTING SYSTEMS (CHINA) LTD Best Facility… Make Best Quality…
World Trade Center 7 Building Performance Assessment.
Váradi Metal Kft. H-7020 Dunaföldvár, Paksi u. 73. Tel:
EUROPE CONTRACTING. EUROPE CONTRACTING Company Presentation  International Activity Activity in Romania Projects in Romania Quality Management Health.
INTER-LAKES BASES PRODUCTS. MODEL B-75 MACHINE BASE B-75 Model with panels and doors.
CLEAN ENERGY FOR A CLEAN ENVIRONMENT Subtitle and/or date.
THE PORTUGUESE EXPERIENCE WITH “EU” FUNDING MECHANISMS.
Company was founded in 2012 and it’s a legal successor of famous ЗМК, which was the largest structural steel producer in the South Caucasus region from.
© 2010 Board of Regents University of Nebraska1.  History ◦ T BAILEY, INC. – Anacortes WA  Steel tank fabrication and construction  Began building.
UPDATE ON THE CRYOSTAT DESIGN AND INSTALLATION SEQUENCE.
 over 20 years of experience on the specialized market of relocation of the industrial facilities;  realization of the projects in many countries.
Heritage Products, Inc. Welcome to Heritage!. Heritage Products, Inc. Conveniently located in Crawfordsville, Indiana. Detroit Indianapolis Crawfordsville.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
World Trade Centre Collapse Group 17 Valerie Scott Dan Kennedy.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
Welcome to Odyssey Industrial Systems. 2 Odyssey Today 18,000 Square feet of leased space in two buildings Outsourcing powder coating today; in-house.
COMPANY INTRODUCTION S & C Co., Ltd.
Fortaco Estonia. Fortaco Estonia overview Fortaco Estonia located in Narva, just on the border between EU and Russia. Factory has over 65 years experience.
1 Update on Off-Campus Development in South County: Update to FPP CAC – August 25, 2015 Siteman Cancer Center Expansion Phase II Development.
MISA Metal Fabricating, Inc International Dr. Louisville, KY Phone: (502) Fax: (502)
Great Northern Innovation: A Comprehensive Vibrating Screen Resource
1 Mulch Lane Bridgeton Mo
TRADER, SUPPLIER & MANUFACTURE
HAMANASI Truss Installation Graphics February 2014
Hailo US Tower Equipment Manufacturer
BORKHIMMASH 143 years in the business
Where is Industry Expanding?
Highveld Industrial Park Workshop No. 2 Information Memorandum
Highveld Industrial Park Workshop No. 4 Information Memorandum
Highveld Industrial Park Workshop No. 3 Information Memorandum
Connors Bros. CloverLeaf Seafoods November 15, 2016
CHANNEL DISTRICT ACTION TEAM
LSST PROJECT PHASE #2 BASE FACILITY AND DATA CENTER CONSTRUCTION
Wilson Hall Fire Protection Features
A member of the Structa Group of Companies
Katana Summit, LLC Wind Tower Manufacturer
LaBour Pump Selma, Alabama “The Can Do Place” 11/19/2018.
COLUMNS SLIDE SHOW.
STRUCTURAL TIMBER FRAMING
Company profile ABCD GROUP CO., LTD.
Project: 250 West Street, Columbus, Ohio
Strictly confidential
Lindoe Offshore Renewables Center
Presentation transcript:

Production Facilities 2 Martifer was established on 21st February 1990, and still maitains its head office in the industrial zone of Oliveira de Frades, Portugal, where is located the main factory of Steel Structures with m2. The factory is supplying the Portuguese, Spanish, Western Europe and North African Market. During the first quarter of 2002, it began the construction of a new plant in Benavente, Portugal. The main goal of this was to engage in the construction of the new EURO 2004 football stadiums and to supply the Spanish market at the time. The area occupied by this factory has a total value of m2. MARTIFER CONSTRUÇÕES Oliveira de Frades | Portugal MARTIFER BENAVENTE Benavente | Portugal

Production Facilities Located in Gliwice, Poland, the production unit of Martifer started operating in August This unit has a nominal annual capacity of tons of steel structure and is possible to per-form shot blasting, painting and coating. It is equipped with state of the art CNC cut and dril-ling equipment for plates and profiles, as well as cutting and bending of thin plate in the fini-shing sector. MARTIFER POLSKA Gliwice | Polska In the summer of 2008 it started production the unit of Martifer Constructii in Calarasi, Romania. This facility comprehends m2 of industrial pavilions with an installed capacity of tons/year. MARTIFER CONSTRUCTII Calarasi | Romania

Production Facilities Projected to supply the Central and South African market the factory will start production in September 2009 equipped with a line for cutting and drilling profiles, oxicut machine with plasma, guillotine, plate bending machine, plate drilling machine and automatic shoot blasting chamber. MARTIFER CONSTRUÇÕES Luanda | Angola 4 AREA OF PRODUCTION M 2 N. Workers 160 Production Capacity – 1st Year150 ton/Week Start Production September

International Projects Experience

DRAGÃO STADIUM. Oporto 2800 tons of steel in the roof; 1000 tons of steel for support of production sqm application of polycarbonate. Assembly: 7 months PROJECT EXPERIENCE

Dragão Stadium| Oporto 2800 tons of steel in the roof; 1000 tons of steel for support of production sqm application of polycarbonate. Assembly: 7 months Martifer Construction

BENFICA STADIUM. Lisbon The structure is composed by 4 tube arcs with 2000x40mm, main trusses with girders and tubular sections, struts/ties that connect the tubes and trusses, that sustain the roof purlins. Assembly: 8 months PROJECT EXPERIENCE

Benfica Stadium| Lisbon The structure is composed by 4 tube arcs with 2000x40mm, main trusses with girders and tubular sections, struts/ties that connect the tubes and trusses, that sustain the roof purlins. Assembly: 8 months Martifer Construction

ALVALADE STADIUM. Lisbon Roof constituted by a three-dimensional truss sustained on 16 ties connected to 4 masts. The main girders are perpendicular to the interior ring and are sustained on it. Assembly: 8 months. PROJECT EXPERIENCE

Alvalade Stadium| Lisbon Roof constituted by a three-dimensional truss sustained on 16 ties connected to 4 masts. The main girders are perpendicular to the interior ring and are sustained on it. Assembly: 8 months. Martifer Construction | Martifer Inox

CAJA MAGICA | Spain Steel coverage: Ton divided by three stadiums The stadium has a movable coverage. Martifer Construction

CAJA MAGICA | Spain Steel coverage: Ton divided by three stadiums The stadium has a movable coverage. Martifer Construction

14 ASSEMBLY PROCEDURES

15 BUSINESS MEETING LEISURE CENTER – LAS ARENAS Restructuring of an ancient bull Square In a Shopping Centre Location: Spain – Barcelona / Spain Square Weight Of Steel Structure Construction – 2.000Ton

16 BUSINESS MEETING LEISURE CENTER – LAS ARENAS “Plateia” Assembly Procedure Phase I Pré – Montagem Plateia “Plateia” Pré-Assembly Phase II Elevação Plateia “Plateia” Erection

17 BUSINESS MEETING LEISURE CENTER – LAS ARENAS Caracteristics and Conditionings Caracteristics -Plateia:120 Ton -Diameter: 25 m -Erection Hight: 30 m Conditionings -Limited Space -The existent Cranes in building site has a restricted Capacity

18 BUSINESS MEETING LEISURE CENTER – LAS ARENAS “Plateia” Pré – Assembly Assembly Erection Tower Erection (Erection Mechanism)

19 BUSINESS MEETING LEISURE CENTER – LAS ARENAS “Plateia” Pré – Assembly Assembly Erection Tower Erection (Erection Mechanism) 1 2 3

20 BUSINESS MEETING LEISURE CENTER – LAS ARENAS “Plateia” Pré – Assembly Assembly Erection Tower Erection (Erection Mechanism) 1 2 3

21 BUSINESS MEETING LEISURE CENTER – LAS ARENAS “Plateia” Pré – Assembly Assembly Erection Tower Erection (Erection Mechanism) 1 2 3

22 BUSINESS MEETING LEISURE CENTER – LAS ARENAS Erection

23 BUSINESS MEETING LEISURE CENTER – LAS ARENAS Other Works… Plateia Disco Columns