Eva Barbara Holzer MPP, CERN 31.7.2015 1 Eva Barbara Holzer 1 Approval procedure for master threshold changes.

Slides:



Advertisements
Similar presentations
Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
Advertisements

Electronic Systems Support LV PS Procurement - Status February 28, 2005.
1 MPS Commissioning Report from the MPSC subgroup Jan Uythoven For the Members of the MPSC subgroup.
LHC progress Thursday 30 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Injection losses and protection Evian, 12-Dec-11 W. Bartmann R. Appleby, P. Baudrenghien, C. Bracco, B. Dehning, A. Di Mauro, L. Drosdal, J. Emery, E.
LSWG day, Sept. 2, 2014, B. Auchmann for the BLMTWG Collaboration of many teams: OP, RF, BI, Collimation, LIBD, FLUKA, etc. T. Baer, M. Bednarek, G. Bellodi,
Eva Barbara Holzer IEEE NSS, Puerto Rico October 26, Beam Loss Monitoring System of the LHC Eva Barbara Holzer, CERN for the LHC BLM team IEEE Nuclear.
January 2006Beam dump and injection inhibits / J.Wenninger1 Beam Dump and Injection Inhibits J. Wenninger AB-OP & D. Macina TS-LEA LHC experiments signals.
Distributed BI Systems BLM, BPM, BTV and BRAN Laurette Ponce & Fabio Follin Thanks to: Anthony Rey, Enrico Bravin, Rhodri Jones, Bernd Dehning, Mariusz.
Beam-induced Quench Tests of LHC Magnets Beam-induced Quench Tests of LHC Magnets, B.Dehning 1 B. Auchmann, T. Baer, M. Bednarek, G. Bellodi, C. Bracco,
17/09/2012LHC 8:30 meeting LHC Summary Week 37 Coordination: Jorg Wenninger & Jan Uythoven.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
CERN Draft 0.2 July 26th, 2011IMWG - Workflow sub working group - draft Proposal.
A MOVEMENT CONTROL SYSTEM FOR ROMAN POTS AT THE LHC Ben Farnham, Sylvain Ravat, Federico Ravotti, Mario Deile, Patrick Fassnacht, Odd Oyvind Andreassen,
1 Beam Plans for Accelerator Systems: The Machine Protection System Jan Uythoven On behalf of the MPWG and the MPS Commissioning WG Special thanks to R.Schmidt,
1 Joint LHC Machine-Experiments Meeting on Experiment Protection from Beam Failures Summary and action list D. Macina TS/LEA/INT LEMIC 91.
ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx.
9 th AWAKE Technical Board 11 March Actions from Last Technical Board WP laser and MPP: decide until March 2015 which compressor design will be.
B. Auchmann, O. Picha, Joint CWG/BLMTWG Meeting August
R.Schmidt TE-MPE-PE: members of the section Michael Jonker Mike Koratzinos Rüdiger Schmidt Daniel Wollmann – from 1 st November 2011 Arjan Verweij Carlos.
TE- MPE PE members 1.Bernhard Auchmann; 2.Zinur Charifoulline; 3.Michael Jonker; 4.Arjan Verweij; 5.Daniel Wollmann; 6.Rüdiger Schmidt; 7.Vera Chetvertkova.
Improvements of the ALFA and TOTEM Roman Pot Movement System in TS1 Mario Deile with input from P. Fassnacht, S. Jakobsen, J. Kaspar, S. Ravat for the.
Eva Barbara Holzer MPP, CERN July 31, Eva Barbara Holzer, CERN MPP CERN, July 31, 2009 PROCEDURES FOR CHANGES TO BLM SYSTEM SETTINGS DURING LHC.
Mariusz Sapinski BI/BL Acknowledgements: 1 Planning of quench tests - LMC158 Draft planning of beam induced quench tests at the end of 2013 run LHC Machine.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
LIU-PSB Configuration Management EDMS Documentation, Layout and ECRs Thomas Birtwistle EN-MEF-DC.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
News and hot topics Impedance meeting 14/04/2014.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
Eva Barbara Holzer July 16, LHC MPP Eva Barbara Holzer for the BLM team LHC MPP CERN, July 17, 2010 Proposal on Threshold Corrections for RC Filters.
HIGH RADIATION TO MATERIALS 20 TH P ROJECT T EAM M EETING – O CTOBER 14, 2010 Project Team Meeting CERN, October 14, 2010  Beam requests - operation I.
LHC off-momentum collimation simulation Hector Garcia Morales Royal Holloway University of London Roderik Bruce, Danielle Mirarchi, Belen Salvachua, Kyrre.
LHC progress Tuesday 28 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
B. Todd et al. 19 th August 2009 The Beam Interlock System Thanks to: Machine Protection Panel, R. Schmidt, B. Puccio, M. Zerlauth and many more… 0v2.
LHC machine status ~ Daily Summary ~ Daily beam commissioning meeting Week 42 - October 13 th, 2015 CERN, Geneva, CH M. Lamont and S. Redaelli for the.
– Machine closed. Ramp for powering tests & pre-cycle – Pilots through nominal cycle up to collisions. Measure chroma during squeeze. Check dump of pilots.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Eva Barbara Holzer MPP, CERN July 31, Eva Barbara Holzer, CERN MPP CERN, July 31, 2009 BLM System Audit Sequel.
FCC related MDs. Faster LHC ramp MD Brennan Goddard; Matteo Solfaroli Camillocci; Wolfgang Bartmann; Florian Burkart; Francesco Maria Velotti; Mike Lamont;
28/01/2013LHC 8:30 meeting Summary of Week 4 pPb physics Machine Coordination: Mike Lamont & Jan Uythoven Ion coordination: John Jowett.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
Eva Barbara Holzer LHC Machine Protection ReviewSeptember 6, Eva Barbara Holzer LHC Machine Protection ReviewSeptember 6, Eva Barbara Holzer.
1 st impedance working group meeting Christine Vollinger, Benoit Salvant Mandate Draft proposal for: Structure Procedures List of members Opening discussion.
LHC intervention scheduling with the Work Acceptance Tool
DRY RUNS 2015 Status and program of the Dry Runs in 2015
Dependability Requirements of the LBDS and their Design Implications
Potential failure scenarios that can lead to very fast orbit changes and machine protection requirements for HL-LHC operation Daniel Wollmann with input.
M.Jonker CTC MPO-WG status
ATLAS-AFP interlock validation
SPS CC: Final plan for interlocking of crab cavities in SPS
Safe mode transmission
Monday 21st January & night
Summary of Week 49 Machine coordination: Jorg Wenninger & Jan Uythoven
Disabling Rules.
Goals of week 32 Deliver luminosity for physics
MPSC Procedures An update
Remote setting of LHC BLM thresholds?
BLM planning 03/03/2014.
Agenda 9:00-10:00 Beam Interlock System Changes Following the 2006 Audit Benjamin Todd 10:00-11:00 Beam Dump System follow-up from the 2008 Audit Jan Uythoven.
Bernhard Holzer, Joerg Wenninger
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Week 35 – Technical Stop and Restart
Beam Dump and Injection Inhibits
LHC progress report Week
Machine Protection System Commissioning plans
90m "proper" VdM scans in the 90m/10m optics
Interlocking strategy
Wednesday 23/2 Thanks CRYO!!!.
LHC Status Fro Morning 9-Sep
Presentation transcript:

Eva Barbara Holzer MPP, CERN Eva Barbara Holzer 1 Approval procedure for master threshold changes

Eva Barbara Holzer MPP, CERN  Approval requested from typically 3 persons. Each system should define one main signatory and alternatives in case of absence. 1.One BLM expert: Barbara Holzer, alternative: Matti Kalliokoski, Bernd Dehning 2.One MPP representative: Markus Zerlauth, Daniel Wollmann, Rudiger Schmidt, Jorg Wenninger 3.One equipment representative per involved equipment:  Collimators: Stefano Redaelli, alternative: Roderik Bruce, Alessio Mereghetti  Magnet circuits: Bernhard Auchmann, alt: Arjan Verweij, Daniel Wollmann  Injection and extraction elements: Chiara Bracco, alt: Wolfgang Bartmann, Jan Uythoven  Roman pots  Alfa: Sune Jakobsen, alternative: Patrick Fassnacht  Totem: Mario Deile, alt: Jan Kaspar  BI: Bernd Dehning, alt.: Barbara Holzer  RF: Wolfgang Hofle, alt: Andi Butterworth Approval for threshold changes

Eva Barbara Holzer MPP, CERN  Continue with system representatives:  Experiments  Alice: Antonello Di Mauro  Atlas: Sigi Wenig  CMS: Nicola Bacchetta  LHCb: Richard Jacobsson

Eva Barbara Holzer MPP, CERN  Request of comments to:  lhc-mp-restricted (Members of the restricted LHC MP body)  BLMTWG-Members (BLM Thresholds Working Group - List Members)  lhc-mp-panel-members (Members of the LHC machine protection panel)  Information to:  lhc-engineers (LHC EIC)  lhc-mc (lhc machine coordinators)  blm-lhc-support (Beam Loss Monitoring System Support for the LHC) Threshold ECRs in EDMS

Eva Barbara Holzer MPP, CERN  Try to set up ONE mailing list for MF changes notification, containing:  BI-BL issues tracker  lhc-mp-restricted (Members of the restricted LHC MP body)  BLMTWG-Members (BLM Thresholds Working Group - List Members)  lhc-mp-panel-members (Members of the LHC machine protection panel)  lhc-engineers (LHC EIC)  lhc-mc (lhc machine coordinators)  blm-lhc-support (Beam Loss Monitoring System Support for the LHC) MF changes – info to:

Eva Barbara Holzer MPP, CERN  LHC BLM threshold ECRs are handled by BL section  contrary to the hardware ECRs – which are called “-EC” and handled by Samy  BLM expert decides whether to follow procedure A or B A.Procedure for scheduled changes. Once the change to be implemented is decided on: A.Procedure for minor, not-scheduled changes: 1.Get approval ( , verbal etc.) by rMPP 2.Implement 3.Write ECR (as above) 4.Potentially present at LMC Formalize the procedure 1.Write ECR (input from all concerned teams) (1+ days) 2.Circulate amongst authors (2-3 days) 3.Circulate for approval (2-3 days) 4.Close approval procedure and implement changes (1 day) 5.Potentially re-circulate for approval 6.When approved by LMC and the typically 3 responsible persons: implement In parallel to steps 1 – 5: Present at LMC (max 1 week)