Overview and Status of Distributed Energy Resources Policy Docket Jay Griffin, Chief of Policy and Research Hawaii Public Utilities Commission August 4,

Slides:



Advertisements
Similar presentations
Tim Roughan, Director of Distributed Resources National Town Meeting on Demand Response and Smart Grid July 14, 2009 National Grids Smart Grid Efforts.
Advertisements

© New York Independent System Operator, Inc. All Rights Reserved. New Challenges Facing System Operators Stephen G. Whitley President & Chief.
Texas Energy Independence Week Renewables & Natural Gas: Confluence, Conflict, or Something In Between? February 23, 2011 Todd Foley Senior Vice President,
What is Microgrid Institute? Microgrid Institute is a collaborative organization that focuses on key factors affecting microgrids and distributed energy.
Development and Operation of Active Distribution Networks: Results of CIGRE C6.11 Working Group (Paper 0311) Dr Samuel Jupe (Parsons Brinckerhoff) UK Member.
Investigating a Higher Renewables Portfolio Standard In California Power Association of California Symposium May 20, 2014 San Francisco, CA Nancy E. Ryan.
© 2006 San Diego Gas & Electric Company. All copyright and trademark rights reserved. Microgrid – A Smart Grid Alternative Service Delivery Model? Thomas.
Cost of Services Pricing Enables a Net Zero Energy World © 2011San Diego Gas & Electric Company. All copyright and trademark rights reserved. 1.
1 Pacific Gas & Electric Company MTS: Evolution of the Electric Distribution System Manho Yeung, Senior Director, System Planning and Reliability PG&E.
Project 1.4 Operational Strategies and Storage Technologies to Address Barriers for Very High Penetration of DG Units in Intelligent.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Planning challenges for RE Deployment North African perspective Addressing Variable Renewables in Long-Term Energy Planning (AVRIL) : 2-3 March 2015 Rim.
IEEE JOINT TASK FORCE ON QUADRENNIAL ENERGY REVIEW Utility and Other Energy Company Business Case Issues Related to Microgrids and Distributed Generation.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
Susan Covino Senior Consultant, Emerging Markets March 31, 2015
Net Metering and Interconnection A Policy Perspective Brad Klein Staff Attorney Envt’l Law & Policy Center March 28, 2007.
Aidan Tuohy Technical Leader/Project Manager, EPRI ERCOT Emerging Technology Working Group (ETWG) 09/24/2014 Transmission System Considerations for Integrating.
The Status Of The Electric Grid In ERCOT The Electric Reliability Council Of Texas Sam R. Jones, P.E. ERCOT – Retired As a retiree of ERCOT this presentation.
Federal Energy Regulatory Commission Proposed Rule on Small Generator Interconnection RM July 23, 2003.
RENEWABLE ENERGY HAS BEACHED IN BARBADOS INTEGRATING A HIGH SHARE OF RENEWABLE GENERATION IN THE BARBADOS GRID WILLIAM HINDS CHIEF ENERGY CONSERVATION.
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
FOR174 _INES B ELECTRICITY STORAGE FOR RENEWABLES NINTH MEETING OF THE COUNCIL – THEMATIC EVENTS 1 FRANCK AL SHAKARCHI ATOMIC ENERGY AND ALTERNATIVE ENERGIES.
2015 World Forum on Energy Regulation May 25, 2015
The Potential for Increased Cooperation on Offshore Wind among the Northeast States Warren Leon, Executive Director.
DNV GL © SAFER, SMARTER, GREENER DNV GL © Second Annual Utility of the Future Pulse Survey Key Findings 1 July 15, 2015 Presentation to C/CAG RMCP.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
Renewable Energy: Legal and Policy Issues Frank Prager Vice President, Environmental Policy Xcel Energy November 20, 2009 Frank Prager Vice President,
© OECD/IEA 2010 Cecilia Tam International Energy Agency Martin Taylor Nuclear Energy Agency The Role of Nuclear Energy in a Sustainable Energy Future Paris,
 Interconnecting DER With Electric Power Systems POWER SYSTEM 2002 CONFERENCE -- IMPACT OF DISTRIBUTED GENERATION Image.
Summary Overview: MADRI Model Small Generator Interconnection Procedures Prepared by Brad Johnson* June 15, 2006 ACN Energy Ventures
Applications and Benefits of Energy Storage Maui, Hawaii June 16, 2010 Garth P. Corey, Consultant Sandia National Laboratories Sandia is a multiprogram.
Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG Barcelona May DISPOWER Distributed Generation with High Penetration of Renewable.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
Copyright © 2015 Clean Power Research, L.L.C Prepared by Ben Norris, Clean Power Research on behalf of Utah Clean Energy April 27, 2015 Net Metering Workgroup.
Confidential – Limited Distribution Roadmap for Hawaii’s Clean Energy Future PMI Honolulu October 20, 2010 Dick Rosenblum President & CEO Hawaiian Electric.
1 1 CURRENT ENERGY POLICY CHALLENGES. THE 2030 ENERGY AND CLIMATE FRAMEWORK DG Energy, European Commission.
Small Renewable Generators Tony Marciano Public Utility Commission of Texas May 2, 2007 (512)
FERC’s Role in Demand Response David Kathan ABA Teleconference December 14, 2005.
Overview What's is micro grid Over view of electric grid
August 4 th Webinar 11-1 PDT Panelist Bios
0 Distributed Energy Resources: Going Small IEP 2015 Annual Conference September 30, 2015 Colin Cushnie V.P., Energy Procurement & Management Southern.
California Energy Commission Renewable Energy Transmission Initiative (RETI) Part I Jeffrey D. Byron California Energy Commission Energy Action Plan (EAP)
1 Demand Response: A Reliability Tool Today; A Renewable Integration Tool Tomorrow Dave Waller, VP Customer Service Hawaiian Electric Company.
Demand Response in Energy and Capacity Markets David Kathan FERC IRPS Conference May 12, 2006.
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
ENERGY STAR® WORKSHOP Riffe Center Columbus, Ohio April 26, 2007.
SOUTHERN CALIFORNIA EDISON® SM Preferred Resources Pilot August 17, 2015
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Promoting Distributed Generation Resources Through State Initiatives Ed Ethridge Public Utility Commission of Texas Distributed Resources in Restructured.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Page 1 Pacific Northwest Smart Grid Demonstration Project  Largest Smart Grid Demonstration.
EEI’s DG Task Force: The Challenge Ahead Louis Harris EEI Staff Representative DG Task Force June 20, 2001.
1 ISU: DER in Illinois / Springfield, IL / May 18, 2000 Jairam Gopal California Energy Commission Sacramento CA Institute for Regulatory Policy Studies.
Lessons Learned from Existing RTOs John Moore January WCEA Meeting January 7 th, 2016.
Russell Shaver– Austin Energy Emerging Technology March
Energy Storage and Distributed Energy Storage (ESDER) Initiative California Independent System Operator CAISO – CPUC Energy Storage Workshop May 3, 2016.
Distributed Energy Storage
Regulatory Considerations for Deploying Distributed Energy Storage Sky Stanfield, Of Counsel Keyes, Fox & Wiedman LLP July 9, 2015 MA Stakeholder Conference.
Hawai’i Over 77,000 PV systems interconnected or approved statewide. 17% of customers 500+ MW of PV installed Oahu: 32% of single family homes have.
DER Provide Grid Services for the 21 st Century Electric System Lorenzo Kristov, Ph.D. Principal, Market & Infrastructure Policy More Than Smart Conference.
The Midwest ISO – Platform to Meet Tomorrow’s Challenges Wisconsin Industrial Energy Group August 7, 2008.
Distribution System Planning in Hawaii
Renewable Energy Challenges: System Stability
Towards a 100% Renewable Energy Supply “Renewables Working Together”
New EGNRET Concept Notes
Building a Sustainable Energy Future
Solar Microgrids for Local Resilience
NYS Department of Public Service
Meeting the challenge: Electrification and Climate Change
California Transportation Electrification Activities
DC National Grid Modernization Trends NC DEQ Clean Energy Plan Workshop #3 April 22, 2019 Autumn Proudlove Senior Manager of Policy Research NC Clean.
Presentation transcript:

Overview and Status of Distributed Energy Resources Policy Docket Jay Griffin, Chief of Policy and Research Hawaii Public Utilities Commission August 4, Hawaii Public Utilities Commission

2 Dr. James “Jay” Griffin is the Chief of Policy and Research at the Hawaii Public Utilities Commission. He leads the PUC’s team of researchers and economists that support Commission decision-making with energy policy research and analysis. Joining the PUC over two years ago through an intergovernmental agreement, Jay is on leave as a faculty member at the Hawaii Natural Energy Institute (HNEI) which is an independent research unit at the University of Hawaii supporting the state’s efforts to develop indigenous renewable energy sources and reduce dependence on imported fossil fuels. While at HNEI, Jay worked on the research team for several renewable grid integration studies and led a Department of Energy-funded smart grid demonstration project on Maui. Jay Griffin Chief of Policy and Research Hawaii Public Utilities Commission

Hawaii – Becoming World Leader in Solar PV Adoption Hawaii leads the nation in the penetration of residential rooftop solar PV systems and as a result, is at the forefront of the integration challenges associated with high solar PV penetration levels. At the same time, Hawaii is on track by 2017 to become a world leader in the utilization of solar PV resources – both distributed and utility-scale – with installed solar PV capacity penetration levels exceeding 75% of typical daytime gross system loads likely on several island electric grids. 3

Hawaii Electric Systems -- 4 Electric Utilities; 6 Separate Grids O ʻ ahu Moloka ʻ i Maui Hawai ʻ i Lana ʻ i Kauai Island Utility Cooperative 34 MW PV (12 MW in development) System Peak: 72 MW Customers: 32,700 Hawaiian Electric 283 MW PV / 100 MW Wind / 69 MW WTE System Peak: 1,144 MW Customers: 300,000 Maui Electric Maui: 52MW PV / 72MW Wind System Peak: Maui 190 MW Lana’i: 1MW PV System Peak: Lana’i: 5 MW Moloka’i: 2 MW PV System Peak: Moloka’i: 5.5 MW Customers: 68,000 Hawaii Electric Light 52 MW PV / 30 MW Wind / 34 MW Geothermal / 16 MW Hydro System Peak: 190 MW Customers: 81, % 15% 17% 47%

Hawaii’s Distributed Solar PV Growth has Pushed Interconnection and System Integration Boundaries 5 Hawaiian Electric Companies Cumulative Installed Capacity (MWs)

PUBLIC UTILITIES COMMISSION6 Growth of Distributed PV has Pushed Interconnection Boundaries Source: Hawaiian Electric Co.

PUBLIC UTILITIES COMMISSION7 Source: Hawaiian Electric Co. Over last 2 years utility has increased distribution circuit screen levels to interconnect additional PV Aggregate growth has raised system-level integration challenges Growth of Distributed PV has Pushed Interconnection Boundaries

Hawaii Public Utilities Commission8 Hawaii’s High Renewable Grids are Encountering New Technical, Economic, and Policy Challenges First Source: Maui Electric Co. “Renewable Watch”, August 1, 2015  60% Daytime Load supplied by Wind and DG

Hawaii Public Utilities Commission9  23% daytime load similar to Oahu today Maui, Hawaii Island, and Kauai regularly > 50% w/ Oahu to follow soon Hawaii’s High Renewable Grids are Encountering New Technical, Economic, and Policy Challenges First

March 31 PUC Orders Address DER Interconnection and New Customer Options Interconnection of Energy Storage Systems (Docket No ) Storage systems will be reviewed for safety and reliability Resolution of further technical issues moved to DER docket Distributed Energy Resources Policy Docket (Docket No ) Established to investigate technical, economic, and policy issues Opening order highlighted 3 key objectives: 1)Clear interconnection backlog 2)Enable DER market growth 3)Create new DER market choices Included Staff Paper and Proposal Continues work started by stakeholders in the Reliability Standards Working Group (RSWG) Hawaii Public Utilities Commission10

Overview of Staff Report and Proposal Focused discussion and collaboration among parties will resolve high priority issues more quickly Document divided into 3 sections: 1)Overview of Recent Trends in Hawaii Solar PV Market 2)Near-Term Technical and Economic Challenges and Proposed Solutions for the Evolution of Hawaii’s DER Market 3)Proposed DER Policy Docket Issues and Work Scope Summarizes near-term integration challenges Includes DER Advanced Technology Roadmap Proposes work scope for near-term and mid-term solutions Hawaii Public Utilities Commission11

Staff Paper Summarizes DER Priority Technical Challenges Examples of Technical Integration Challenges Steady State OperationsContingency Events System- level Over-generation and increasing variability in generation resulting in:  Curtailment of other renewable generation  Frequency regulation and ramping challenges for central generation Behavior of aggregate DER fleet may exacerbate grid instability during emergencies:  Need grid-supportive frequency and voltage trip and ride through settings Circuit- level Over-generation resulting in:  Approaching or exceeding distribution system equipment capacity limitations Behavior of DER systems during circuit-level contingencies may result in:  Unintentional islanding  Temporary load rejection overvoltage Hawaii Public Utilities Commission12 Source: Table 2, Staff Report and Proposal, Docket No , March 31, 2015

Proposed Market Options to Address Integration Challenges Hawaii Public Utilities Commission13 Customer DER Development Options Customer Self-Supply Option Customer Grid-Supply Option Non-participant customers held harmless, or benefit, from both customer solar PV development options Customer choice -- non-export option to serve customer energy requirements Grid power supply – export option to supply wholesale energy Source: Staff Report and Proposal, Docket No , March 31, 2015

Next Steps in DER Docket Phase 1: Collaborative process with focus on clearing interconnection backlog, enabling continued DER market growth, and creating new DER market choices Parties filed Final Statements of Position – June 29, 2015 Resolution of Phase 1 issues and Phase 2 scope currently under Commission consideration Hawaii Public Utilities Commission14

Mahalo! Please send any questions to me at Hawaii Public Utilities Commission15