Rev of Run IIb, Nov 4-8, 2002, A. Bean 1 Silicon Management  Organization and Management  Schedule  Resources  Conclusions Alice Bean Univ. of Kansas.

Slides:



Advertisements
Similar presentations
Present Assembly Status Three important milestones completed: – We tried the entire assembly procedure on real modules and it worked – The construction.
Advertisements

US CMS Silicon Tracker – PAC Meeting – FNAL - Nov 3, Incandela 1 US CMS Tracker Outer Barrel (TOB) Silicon Project Joe Incandela Fermilab Level.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
W. Freeman, D0 PMG 25-Feb-03 1 Run IIb Schedule Status u Schedule Status u Update on near-term equipment expenditures u Budgeting Update u Summary.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
DOE/NSF Review of the U.S. ATLAS Construction Project June 3-4, 2002 WBS 1.1 Silicon Subsystem Abe Seiden UC Santa Cruz.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Mapping for Silicon Run IIb L. Bagby, A. Nomerotski, E. von Toerne December 2002
DOE Rev of Run IIb Sep 24-26, 2002  Silicon software and simulation Scope:  Design and/or modify software tools for Run IIb silicon tracker simulation.
Silicon RunIIb Workshop, Dec , A. Bean, M. Demarteau Slide 1 Workshop  Workshop is to “Move beyond the Technical Design Proposal”  Many.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
TOF Project Construction Project Plan
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Muon trigger upgrades, missing since not aimed towards DOE funding PHENIX upgrades: view presented to DOE R&D $3.5M Construction $16.6M Au-Au p-p 200 Si-Si.
7/26/2006 Wyatt Merritt 1 DECam CD1 Documentation DOE Critical Decision Process Documentation Requirements.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
DOE Rev of Run IIb Sep 24-26, Silicon sensors procurement and quality assurance WBS Regina Demina Kansas State University Frank Lehner University.
3.1.1 Optics, Optical Corrector, Mechanical Systems M. Johns, C. Claver.
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
David Lee, FVTX Review Nov Cost and Schedule WBS 1.0 David M. Lee Los Alamos National Lab Deputy Project Leader.
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
Director’s Review 5/5/03 Spalding DRAFT RLS 1 Project Planning  Documentation to DOE June 1  DOE Review ~July 22 Documents Summary Project Overview,
Director's Baseline Review, April 16-18, M. Demarteau Slide 1 Director’s Baseline Review (Temple Review) April 16-18, 2002 Marcel Demarteau Fermilab.
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
Ronald Lipton Layer 0 Status PMG Sep Status of the Layer 0 Project – emphasis on hardware status, preproduction, and preparations for shutdown work.
DZero Run IIb PMG February 25, Run IIb DZero PMG  Status overview, issues (Kotcher)  Schedule, project status (Freeman)  AOB Jon Kotcher Fermilab.
NIKHEF B-field monitors Paul Balm November 11 th, 1999.
DZero Run IIb PMG January 28, Agenda Run IIb D-Zero PMG January 28, 2003  Overview, issues (Kotcher)  Project status (O’Dell)  Trigger technical.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
Vertex ‘99, 6/21-25/1999 p. 1 CDF Run II SiliconAlan Sill, Texas Tech University CDF Run II Silicon Tracking Projects 8th INTERNATIONAL WORKSHOP ON VERTEX.
1 US Cost & Schedule Summary W. R. Edwards US Project Manager CD-2/3a Review January 8, 2008 BNL.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
FVTX Wedge Assembly WBS , , , , , David Winter Columbia University FVTX Wedge Manager.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
A.Nomerotski,2/3/ Layer0 Status Andrei Nomerotski 2/3/2005 Outline  Introduction  Module Production  Assembly of Layer0  Electronics  System.
Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.
V. O’Dell, D0 RunIIb PMG 4-Feb Dzero Run IIb PMG  Agenda u Overview & Management News: V. O’Dell u Trigger Upgrade Status:P. Padley u Silicon closeout.
DoE Review June 6, 2000 Cost Estimate  New Cost Estimate u Manpower Costs (Op. SWF) u Equipment Costs (Eq. M&S) u Contingency  Conclusions Mike Tuts.
Dzero RunIIb Sensor PRR, August 8, Marcel Demarteau Slide 1 DØ Inner Layer Sensor Production Readiness Review August 08, 2003 M. Demarteau for the.
DZero Run IIb Rev Nov 05 ‘03 1 Kotcher Agenda (from Rebaselining Review)  Introduction (Kotcher – 10’)  Trigger & DAQ/Online (Wood – 30’) u AFE II/TriP.
Brenna Flaugher Sept. 24 th Lehman Review1 Run IIB Silicon Upgrade: Cost and Schedule Lehman Review Sept. 24, 2002 Brenna Flaugher Run IIB Silicon Project.
M. Gilchriese Items from Talks U.S. Pixel Meeting Santa Cruz July 2003.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs Cost Schedule.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
CMS Upgrade Workshop, FNAL, Nov 19-21, O.Prokofiev CMS Upgrade Workshop Updated ME4/2 chamber construction costs and prototype Status and plans.
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
1 KU MRI What is the MRI? What is KU doing? Firmware/testboards Optical hybrids Sensors.
HPS Summary Costs, Manpower, Schedule John Jaros Searching for a New Gauge Boson at JLab Jefferson Laboratory September 20, 2010.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
DZero Run IIb PMG December 10, Agenda Run IIb D-Zero PMG December 10, 2002  ESAAB news (Lab, Project, DOE)  Project status, overview (Kotcher)
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
A suggestion for the naming of parts in Silicon Run IIb L. Bagby, E. Chabalina, A. Nomerotski, E. von Toerne + others February 2003.
Dzero Collaboration Meeting, Sept. 14, M. DemarteauEric Flattum - Fermilab 1 Slide 1 Alice Bean Fermilab/University of Kansas for the D0 Run2b silicon.
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
Fernanda G. Garcia, Steve Dixon, Andy Stefanik, Justin Tillman, John Voirin SBN Far Detector Installation & Integration.
B01.2- Outer Tracker Gino Bolla, L3 Manager, January 31, Director's Progress Review – Outer Tracker.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
Resource Loaded Schedule and Budget Profile
10/month is the present production rate 2 FTE + sporadic contributions
Presentation transcript:

Rev of Run IIb, Nov 4-8, 2002, A. Bean 1 Silicon Management  Organization and Management  Schedule  Resources  Conclusions Alice Bean Univ. of Kansas Outline

Rev of Run IIb, Nov 4-8, 2002, A. Bean 2 Organization  Seven distinct Level 3 groups within the project each with its own L3 managers  Management u Silicon group as a whole meets bi-weekly u Silicon L2 and L3 managers meet bi-weekly  Subgroups u In addition many subgroups meet regularly  We’ve built a strong collaboration with major participation from various university groups with clearly delineated responsibilities. Silicon M. Demarteau A. Bean, Deputy Sensors (WBS 1.1) R. Demina, F. Lehner Electronics (WBS 1.2) A. Nomerotski QA, Burn-in (WBS 1.4) C. Gerber Mechanical (WBS 1.3 & 1.5) W. Cooper, K. Krempetz Monitoring (WBS 1.6) M. Corcoran, S. de Jong Production (WBS 1.4) J. Fast, H. Haggerty Software, Simulation (WBS 1.7) L. Chabalina, F. Rizatdinova

Rev of Run IIb, Nov 4-8, 2002, A. Bean 3 University Contributions  Sensor Testing u KSU, SUNY StonyBrook, CINVESTAV, Moscow State Univ  Readout Electronics u KSU, Kansas, UIC, Fresno State, Brown, Louisiana Tech, Northwestern, Zurich  Mechanical Design and Fabrication u Univ. of Washington, Michigan State Univ.  Monitoring u NIKHEF, Rice Univ.

Rev of Run IIb, Nov 4-8, 2002, A. Bean 4 Stave Cores and Shells Hybrids SVX4 chips Silicon Sensors Modules L0/L1 Structures Barrel Assembly Stave Assembly Temperature and Radiation Monitors Software Production Line RunIIb Silicon Detector

Rev of Run IIb, Nov 4-8, 2002, A. Bean 5 Schedule Overview  Relies on RunIIa experience  Build up unparalleled infrastructure and expertise at SiDet  Significant experience with Carbon Fiber at Lab 3  Some new elements similar to systems employed in RunIIa »Digital jumper cables versus low mass cables in RunIIa  Some elements retained from RunIIa »All of the downstream readout electronics ] Interface boards, sequencers, VRB’s, VTM’s,HV system  Schedule is an honest estimate of time evolution of the project  Schedule recognizes that there is pressure to stay on track  It does not cover to the most extreme “what if” scenarios.

Rev of Run IIb, Nov 4-8, 2002, A. Bean 6 Example Task WBS Definition- On CMM, using fixtures align sensors and hybrid and glue all together M&S BOE- Epoxy cost based on one 10cc mix per day with an anticipated cost of $1500 for 20 liters of epoxy, including purity testing. In addition there will be 1 packet of silver epoxy used per day throughout this production, at $11 each. Total epoxy cost is $11.75/day. Labor BOE- There are 168 staves and thus axial modules in the detector, which means 84 modules per north and south barrel. Including 20% spares, a total of 100 modules will have to be produced. We foresee building 2 modules per day on one CMM. All modules can be produced in 10 weeks. To adequately train people and setup the procedures we expect that only one module will be built per day in the first week. One week is added to accommodate possible delays in part arrivals, equipment downtime or mishaps during production. Production of a module, based on 2a experience, should take 1 hour of time for each of a mechanical technician and a CMM technician. The mechanical technician helps setting up and does the documentation and database entry. The following day a mechanical technician flips the module and makes the HV and ground connections and installs HV insulation and updates documentation. The latter operation will take 1 hour per module. A mechanical technician is thus assigned at the 50% level and a CMM operator at the 25% level. A senior Fermilab physicist oversees the production at 25%. 10/10 Axial Module Production – WBS

Rev of Run IIb, Nov 4-8, 2002, A. Bean 7 Critical Path SVX4 chip drives the critical path. L2-L5 hybrids L2-L5 Module Assembly Stave Assembly Barrel Assembly Silicon ready to move to DAB 5/25/06

Rev of Run IIb, Nov 4-8, 2002, A. Bean 8 Slack  SVX4 chips and L2-L5 hybrids are on the critical path Tasks with slack less than 20w Slack Time (wks) L2-L5 Sensors14 L2-L5 modules (4 types)0-12 L1/L0 hybrids8,12 South L2-L5 Bar. Assem.12 L0/L1 Final Barrel ass.12 Fab. 20cm sensor gangs17

Rev of Run IIb, Nov 4-8, 2002, A. Bean 9 Milestones  There are 147 Milestones listed throughout the project  In addition there are 15 Director’s Milestones  We have completed two Milestones: u Readout of hybrid using SASEQ teststand 8/1/02 u Release of silicon reconstruction code 9/21/01 WBS L3 Tasks# of L3 milestones Sensors Readout Mech Des Production Barrel Ass Monitoring Software6

Rev of Run IIb, Nov 4-8, 2002, A. Bean 10 Cost Estimate  Approach used for Cost Estimate u Strongly relies on RunIIa experience u Quotes are used wherever possible u University labor is included in the M&S costs  Contingency follows general “project” guidelines unless noted in the basis of estimate

Rev of Run IIb, Nov 4-8, 2002, A. Bean 11 Costs  In FY02$ with no indirect cost, no contingency  Costs are in kilo$

Rev of Run IIb, Nov 4-8, 2002, A. Bean 12 M&S Cost Drivers  Sensors s Production costs per sensor: s L0$275 s L1 $435 s L2-L5$470 Production TOTAL $1.8M  SVX4 chips $1.0M  Hybrids $0.8M  Cables s Analog$183K s Digital Jumper$366K s Twisted Pair$327K TOTAL $0.9M Costs are in FY02 $ with no contingency or indirect costs

Rev of Run IIb, Nov 4-8, 2002, A. Bean 13 Labor Hours and Profile Total FTE  Physicists129 khours73  Univ. Technical 28 khours16  FNAL technical113 khours64  TOTAL270 khours 153

Rev of Run IIb, Nov 4-8, 2002, A. Bean 14 Conclusions  Management structure with 8, L3 groups  Resource loaded schedule constructed using experience from RunIIa  Silicon Ready to move to DAB 5/25/06  Silicon Project cost in FY02$ with no indirect, contingency: $12.9M  Number of FTEs needed: 153 u We believe we can build the detector on cost, and on schedule!